Construction, renovation and building services in Tbilisi

Services

Construction, renovation and building services in Tbilisi

We build turnkey homes, renovate apartments and install heating, plumbing, drainage and electrical systems. Standalone jobs start at 1,000 GEL.

An engineer visits the site and prepares an estimate. Before work starts, we agree on the scope, schedule and payment terms.

Need one job rather than a whole house?

We take on any service as a standalone order from 1,000 ₾: an engineer measures up, and the estimate and schedule are fixed before work starts. We work in Tbilisi.

All services
House construction

How does turnkey house construction work and what does it cost?

Private houses and cottages from 150 m², from the site geology to handing over the keys to a finished house.

We build private houses from 150 m² to custom and standard designs. We take the project as a whole: surveys, design, permit, earthworks, concrete foundation, pumice or ceramic block masonry, roof, windows, engineering networks and interior finishing. We work to a fixed estimate in lari under a single contract, with a warranty of up to 10 years on all works and stage deadlines in the contract. One contractor for the whole cycle removes the main risk of any build: the dispute at the joint between stages, where every crew blames the one before it.

Foundation and concrete frame

Strip, raft and pile-grillage foundations, concrete slabs and seismic belts. The type is chosen from the geology, not from habit.

Wall masonry

Pumice block 30–40 cm, ceramic block, or a concrete frame with insulation sized by thermal calculation for the site climate.

Roof and facade

Rafter system, metal tile or standing seam, vapour and waterproofing, insulation, plastered or ventilated facade.

Engineering and finishing

Electrics, plumbing, heating, underfloor heating, ventilation and final finishing to the interior design.

  • One contract for the whole house
  • Fixed estimate in ₾, never re-quoted on exchange rates
  • In-house crews at every stage
  • Warranty up to 10 years and stage deadlines in the contract
Priceот 500₾ / м²
Construction supervision

Why do you need technical supervision and a construction audit?

Independent control runs through the whole build cycle, from design and estimate to the roof, before each hidden element is closed.

We provide independent construction supervision on sites in Tbilisi where another contractor is building: we review the design and estimate before work starts, attend the main stages, record hidden works before they are covered, check the quantities claimed against what is on site and hand the client reports that let them argue with the contractor with documents in hand. We set the control points at the joints between stages: after design, before the foundation is poured, before the monolithic frame is closed and before the roof covering is laid.

Entry audit

Contract, estimate and schedule reviewed: what is excluded, where the wording is vague, what it will cost.

Stage visits

Inspection at control points: reinforcement, concrete, roofing, utilities, finishing.

Hidden works

Photo records of junctions before they are covered: rebar, waterproofing, runs in walls and screed.

Quantity checks

Contractor certificates compared against the site and against the estimate.

Report and defects list

Written report with photos and a list of defects with deadlines for putting them right.

  • We are not building this site, so we have no incentive to look away
  • Hidden works recorded before they are covered
  • Quantities checked against the estimate, not taken on trust
  • Reports in the client’s language: en / ru / ka

Which jobs can you order separately?

We take on any of these jobs as a standalone order from 1,000 ₾. The site visit is free, and the estimate and schedule are fixed before work starts. We work in Tbilisi.

Design and permits

Design and permits

Design and permit come first in a build: from ground investigation to approval at city hall, before any plant arrives.

We prepare design documentation for private houses and commercial buildings in Tbilisi: investigations, architectural design, structural calculations for seismic loads, services design and support through the building permit process. It is the first stage of the build cycle and sits ahead of demolition and site clearance. Every crew that follows works from the investigation data and the design: clearance, earthworks, foundation. When we build the house, the design is included in the construction price.

House foundation

House foundation

The foundation closes out the below-ground stage and the concrete frame is built on it. Its type and design come from the site's geology, not from copying the neighbour.

We design and pour a foundation for the soil of the specific plot: strip, raft or pile-and-grillage. We start once the earthworks and retaining walls are signed off: the pit is dug to design level, drainage is in place and the slope is retained. Plots with a level difference are calculated together with the retaining wall, and the foundation there is often stepped. Monolithic floor slabs between storeys are cast later, in the frame stage, to the same calculation. On every pour we run laboratory concrete control and survey checks, and sign a hidden-works certificate for the rebar before concreting. The finished foundation is handed to the waterproofers and the concrete crew.

Concrete works

Concrete works

The concrete frame of the house in an intensity-8 seismic zone: columns, slabs and seismic belts designed by calculation, not by the foreman's experience. It is poured on an accepted foundation and handed over to the stair and roof crews.

We carry out the full cycle of concrete works: formwork, reinforcement, placing and curing, with our own crews and our own formwork. We start on an accepted foundation and an approved design, work storey by storey with survey control and laboratory cube tests at 7 and 28 days. The finished frame is handed over to the stair crew, the welders and the roofers. Concrete cannot be redone: finishes can be stripped and laid again, but a poured frame stays for the life of the building, so rebar sign-off and concrete class matter more here than any saving in the estimate.

Major turnkey renovation

Major turnkey renovation

Demolition, engineering and finishing through to move-in, in an apartment or in a new house.

Major renovation of an apartment or house: demolition, layout change, replacement of all engineering systems, rough and final finishing, furniture and appliances. One contract, one team, fixed estimate and timing.

Roofing

Roofing

The roof closes the building envelope after the concrete and metal elements and opens the work under it: windows, electrics and facade.

We build and repair roofs on private houses and commercial buildings in Tbilisi: rafter structure, vapour barrier and insulation, metal tile, standing seam, bitumen shingles, flat roofs with PVC membrane, gutters and snow guards. In a house the roof follows “Concrete works” and “Welding and metalwork”, once the ring beam, slabs and metal elements are done, and comes before “Windows and glazing”, “Facade works” and “Electrical works”. Under a closed roof the remaining trades work in a dry house.

Heating

Heating

Heating as one system: boiler, pipework, radiators and underfloor circuits are designed together and sit in the build between the weathertight shell and the screed.

We design and install heating in Tbilisi: gas and electric boiler rooms, radiator circuits, wet and electric underfloor heating, hot-water cylinders and weather-compensated controls. Sizing comes from the building heat loss rather than floor area; circuits are balanced at the manifold and the system is pressure-tested before screed and finishes. The pipework goes in after the windows and the plant room, and the radiators are hung after the walls are finished. The plant room is described under “Gas equipment”, the low-temperature circuit under “Underfloor heating”.

Plumbing

Plumbing

Internal water supply and drainage pipework for the house: the pipes go in after the roof and before the floor screed, and the fixtures after the tiling.

We run cold and hot water and drainage inside the house and fit manifold cabinets, filters and plumbing fixtures. We work with metal-plastic, polypropylene and stainless steel. The pipes go in after the roof and the external services, so rain does not wet the routes and the sewer outlets already sit at their levels. We hand pressure-tested pipework over to the screed and the tiling, and fit the fixtures on finished walls. In a turnkey house all of these hand-offs stay with one contractor.

Electrical works

Electrical works

First fix goes in after the roof and windows and before screed and plaster; accessories go on after painting. What is buried in walls and screed cannot be redone without stripping the finishes.

We design and install electrical systems for houses, flats and commercial premises: load calculations, board schematics, cabling, board assembly with breakers and RCDs, accessory fitting and commissioning with measurements. In a house the work comes in two visits. First fix sits between the closed envelope (Roofing, Windows and glazing) and Floor screed, second fix follows Interior finishing. Low-voltage routes for Smart home and low-voltage follow the same design but run apart from the power cables. A mistake in the electrics is a direct fire risk, so we do not bend the standards even to save the client money.

Ventilation and heat recovery

Ventilation and heat recovery

Ventilation and air conditioning belong to the building services stage of a house: routes are hidden in ceilings and walls before finishes, and grilles and units go in after them.

We design and install ventilation and air conditioning in houses and flats in Tbilisi, as a standalone order or as part of a turnkey house project: supply and extract units with heat recovery, ducted and wall-mounted split systems, bathroom and kitchen extract, concealed ducting and room-by-room balancing. In a house the work follows the roof and windows, once the building is weathertight, and comes before the screed, plastering and final finishes that cover the routes. Grilles, diffusers and indoor units go in after the finishes.

Floor screed

Floor screed

A floor flat to within 2 mm over 2 m, the base for tile, laminate and parquet, poured in the house after all the service routes are in.

We pour floor screed in Tbilisi in the finishing phase: after the electrics, plumbing and underfloor heating, and before tiling and final finishes. The scope covers base preparation, a perimeter expansion strip, waterproofing in bathrooms, fibre or mesh reinforcement, beacons set by laser, and pouring of cement-sand, semi-dry or self-levelling mix. How flat the layer is decides whether tile cracks and laminate creaks, so we accept screed with a straightedge check and record its moisture before handing over to the tilers.

Facade works

Facade works

Insulation and finishing of the facade follow the roof and windows and come before landscaping: the facade brings the roof and window junctions into one envelope.

We insulate and finish facades of private houses and commercial buildings in Tbilisi: render systems with mineral wool or EPS, ventilated facades on a sub-frame, decorative render, stone and clinker, and repair and repainting of existing facades. In a house, the facade follows “Roofing” and “Windows and glazing” and hands the site over to “Landscaping and site works” and “Terraces, canopies and outdoor areas”. Junctions with the roof, windows and plinth are priced in one estimate.

Windows and glazing

Windows and glazing

Windows are fitted once the roof has closed the envelope and before the facade and finishing. The installation joint is built layer by layer, and reveals and sills are agreed with the facade.

We install windows and glazing in Tbilisi: PVC and aluminium profiles, panoramic windows and sliding portal systems, glazing for balconies, loggias and terraces, entrance sets, installation details with a vapour barrier, reveals and sills. In a house the windows follow “Concrete works” and “Roofing” and precede “Facade works” and “Interior finishing”. By then the openings are prepared, and the reveals and sills are built in the same cycle as the facade, so the junction details are made once.

Aluminium windows, doors and curtain walling

Aluminium windows, doors and curtain walling

We make aluminium structures to the agreed dimensions and install them after a survey. In a house, installation is coordinated with the readiness of the openings, roof and facade.

We manufacture and install aluminium windows and doors, curtain wall glazing, sliding portals and glazed roof systems. For heated spaces, we select profiles with a thermal break; for cold glazing, profiles without one. We agree the dimensions, glass type and junction details after the survey and before manufacture. In a house, openings, supports and lintels are allowed for during concrete works, and installation is coordinated with the roof and facade.

Fences, gates and automation

Fences, gates and automation

The site perimeter: the base, infill and gates go in after the access road and the welded steel, and the cable for the automation is laid before paving.

We build site fences in Tbilisi at the last stage of the build: after the access road and the steelwork, before low-voltage systems and landscaping. We calculate the concrete base and posts for wind and terrain, and form the infill from profiled sheet, steel pickets, wrought iron, timber or concrete blocks. We install sliding and swing gates with automation, wickets with an intercom and electric lock, lighting and CCTV at the entrance. The entrance is tied to the levels of the finished road, and the cable to the gates runs in a duct so the low-voltage work never has to break up the paving.

Waterproofing

Waterproofing

Waterproofing starts at the foundation stage, straight after the foundation, and is repeated on the roof, terraces and bathrooms. Each layer is finished and tested before the next trade covers it.

We waterproof every level of a building in Tbilisi: liquid-applied and sheet systems for foundations and basements, membrane waterproofing for flat roofs, terraces and balconies, cementitious systems in wet rooms, plus leak diagnosis and repair. The foundation is tanked before backfilling and the concrete frame, roofs and terraces once slabs and outlets are in, wet rooms before screed and tiling. Details at the junctions with neighbouring stages are agreed in advance.

Welding and metalwork

Welding and metalwork

Welding follows the monolithic frame: frames, stairs, canopy supports and gates are fixed to the finished shell before the roof, terrace and fence go on.

We fabricate and install steelwork at the shell stage of the house: frames, trusses, staircases, canopies, gates and railings. We use stick, MIG/MAG and TIG welding on mild steel, galvanised steel and stainless. Welders come onto a finished monolithic frame, once the embedded plates are in the concrete and the geometry has been accepted. Everything that attaches to the house frame is finished before the roof, because the roof structure bears on it, and terraces, canopies and the fence rest on the same steel. Every load-bearing structure is calculated for its load, not chosen by eye from the thickness of the tube.

Tile installation

Tile installation

Tile and porcelain laid in the finishing phase of a house: floors, bathroom walls, terraces and facades, with waterproofing of wet areas and a set-out drawn to the design.

Tiling is part of the finishing phase: it comes after the floor screed, waterproofing and plumbing, and before the final finishing works and site landscaping. We lay ceramic, porcelain, mosaic and large-format tile on a prepared base, with flatness control and waterproofing of wet areas. Tile sets the geometry of a bathroom and kitchen, and its flatness decides how doors, furniture and sanitary ware fit at the next stage. It lasts decades if the screed beneath is flat and the water barrier is sealed, so the work starts with accepting the base.

Demolition and site clearance

Demolition and site clearance

We free the footprint for the new house: demolition, waste removal, grubbing and levelling before the earthmoving plant arrives.

We demolish old houses, extensions, garages and outbuildings in Tbilisi to free the plot for a new monolithic house. The work comes after design and before the access road and earthworks: the old structure goes first, then the plant arrives and the pit is dug. We survey, disconnect services, demolish by machine or by hand, break out foundations and retaining walls, tip the rubble and level the plot. The crews that follow take over clean ground with no debris left in the soil.

Earthworks and drainage

Earthworks and drainage

The groundworks start with the pit: levels, bedding and service trenches, then drainage and backfill around the finished foundation.

We excavate foundations, grade plots, install drainage and dig utility trenches in Tbilisi.

Retaining walls and slope stabilisation

Retaining walls and slope stabilisation

A retaining wall goes in after the earthworks and before the house foundation. It holds the slope, sets the levels and needs a calculation and drainage behind it.

We design and build retaining walls and slope stabilisation in Tbilisi: we check the wall for overturning, sliding and settlement, build cast reinforced concrete walls, gabion and stone structures, lay drainage behind the wall with an outlet and terrace the plot for the building footprint and garden. The starting data comes from “Design and permits”, the excavation is agreed with “Earthworks and drainage”, and the wall levels and base are tied to the “House foundation”. The drainage outlet and the terraces pass to “Landscaping and site works”.

Concrete stairs

Concrete stairs

Cast concrete stairs in any geometry, from a straight flight to a spiral. They are built into the frame together with the slabs and finished towards the end of the build.

We design and cast reinforced concrete stairs for private houses and commercial buildings in Tbilisi: straight and turning flights, U-shaped with landings, spiral and cantilevered floating treads. The stair sits between the concrete works and the finishes: the opening and rebar starters are prepared with the slab, the flight is cast on the finished frame, and stone, tile or timber goes on later, when the finishing stage of the house is under way. We calculate the thickness of the future cladding in advance and build it into the concrete geometry so that the top and bottom steps meet the finished floor.

Gas equipment

Gas equipment

The whole plant room, from choosing the boiler to commissioning and servicing, between the concrete frame and the heating. The gas mains connection is made by a licensed operator, and we prepare the property for it.

The plant room is the base of the heating system: the radiators and underfloor heating depend on it. We size the boiler from the building heat loss, install the pipework, flue and safety group, tie the boiler into the radiator, underfloor and hot-water circuits, commission the system and service it. The openings and sleeves for the flue and pipes are left while the concrete frame is poured, and the heating circuits are connected to manifolds that are already in place. Connection to the gas main and sealing are done by the licensed gas distribution operator: we prepare the property for their visit and support you through the process.

Underfloor heating

Underfloor heating

Underfloor heating belongs to the building services stage of a house: the circuits go in after heating and plumbing, are pressure-tested and then buried in screed.

We install underfloor heating in Tbilisi: wet systems fed from a boiler or heat pump, and electric ones where a wet system does not make sense. We start laying circuits once the plant room and the plumbing routes are fixed, and hand them over to the screed under pressure. Pipe spacing is calculated from the heat loss of each room and the floor finish; the manifold is built with balancing and thermostats; circuits are pressure-tested before the screed is poured and the system is brought up to temperature in stages. Underfloor heating is designed together with the plant room and the screed, otherwise you get a warm strip by the window and a cold middle of the room.

Fireplaces and flues

Fireplaces and flues

The fireplace base is cast with the concrete frame, the flue is run before the roof is closed, and the surround is finished last. Draught is calculated before the firebox is bought.

We design and install fireplaces, stoves and flues in private houses and guest buildings in Tbilisi: we calculate the flue cross-section and height for the specific firebox, install closed fireboxes and stoves, and assemble flue systems with fire-safe penetrations through floors and roof. The work ties in with three neighbouring stages. “Concrete works” provides the base and the openings in the slab, “Roofing” takes the terminal and weatherproofs the penetration, and “Interior finishing” clads the surround in stone, plaster or tile. We agree the combustion air from outside with the house ventilation.

Site water supply

Site water supply

Water on site at all times: source, storage, pressure, treatment. It goes in right after the earthworks, while the plot is still open and before the internal plumbing.

We build independent and backup water supply for houses and plots in Tbilisi: a mains connection or a borehole, storage tanks to cover outages, a pump set with controls and steady pressure, mechanical filtration and softening, and the service into the house with metering, manifolds and frost protection. The work comes right after the earthworks: the run goes into the open trench before paving and lawn. It then connects to the internal plumbing, and the branches for irrigation and the pool are laid in advance.

Backup and off-grid power

Backup and off-grid power

Backup power goes in after the electrical works and the site water supply and before the smart home, when the board and the load list are ready. The scheme is chosen by what must keep running in an outage.

We design and install backup and off-grid power for houses, guest buildings and commercial premises in Tbilisi: a generator with automatic transfer, battery inverters on the critical circuits, solar panels with a hybrid inverter, voltage stabilisation and surge protection for the equipment. The load list is built from the house wiring and the site water supply, the equipment is connected to a finished board, and the backup circuits are handed on to the smart home so that the router and automation stay up in an outage.

Swimming pools

Swimming pools

In a house build the pool belongs to the site phase: after the earthworks and the site water supply, before landscaping and terraces. Shell, plant and finishes come from one contractor.

We build concrete swimming pools for private houses, guest houses and hotels in Tbilisi: cast reinforced shell, multi-layer waterproofing, cast-in fittings and pipework, filtration, heating and disinfection, finished in mosaic, porcelain tile or liner. Work starts when the earthworks and drainage are finished and water has been brought to the site. The coping level and the pipe runs are agreed with the landscaping and the terraces that follow. The client gets shell, plant and finishes from one contractor, and the handovers between stages sit under one estimate.

Landscaping and site works

Landscaping and site works

Site works close the house build: once the facade and retaining walls are done, drainage, paths and lighting go in around the house and the plot is handed over for planting.

We build out the grounds of private houses in Tbilisi: drainage and run-off at retaining walls on slopes, paths and parking in block paving or concrete, channel drains and aprons, outdoor lighting, the base for a fence and the cable to the gate. The work follows facade work and retaining-wall stabilisation. Concealed lines go into the ground before paving, all in one house estimate.

Terraces, canopies and outdoor areas

Terraces, canopies and outdoor areas

A terrace abuts the finished facade and a canopy stands on welded steel, so both are built on the site at the end of the job, before paths and planting.

We build terraces, canopies, pergolas and outdoor areas for houses in Tbilisi at the last stage of the build, once the facade is finished and the steel frames are welded. The work covers a monolithic or piled base, waterproofing and falls with drainage, surfacing in decking, porcelain tile or stone, canopies with a steel frame and roofing, pergolas with adjustable louvres, and a barbecue area with water, power and extraction. A terrace meets the house wall, so we form the junction together with the facade crew, then hand the finished platform over for paving and planting.

Gazebos

Gazebos

Steel-frame and timber gazebos with a base, roof and barbecue area. Tbilisi, orders from 1,000 ₾.

Construction of gazebos and garden seating areas: base, frame in steel box section or timber, roof, floor, railings, lighting and a place for the grill.

Garage construction

Garage construction

A permanent garage or outbuilding as one stage of the house build: from slab to automated doors, after the foundation and the road, before the fence and landscaping.

We build permanent garages, outbuildings and workshops at private houses in Tbilisi: a reinforced slab falling towards the entrance, block or cast walls, a roof with drainage, sectional or sliding doors with automation, an inspection pit with waterproofing, power for tools, and insulation and ventilation for year-round workshop use. The garage sits on the finished house foundation and access road, and takes its levels, falls and cable route from them. The fence with gates and the landscaping follow it, so the exit level and drainage are agreed with those works in advance. In a turnkey house one contractor runs all of this.

Structural strengthening

Structural strengthening

Strengthening follows the survey and the design, while the structure is not yet covered by facade and finishes. Cause first, concrete second.

We survey and strengthen the loadbearing structures of residential and commercial buildings in Tbilisi: we determine the cause of cracks and movement, strengthen foundations, columns, beams and slabs, and carry out seismic upgrades, refurbishment and storey additions with load calculations. In the build of a house the work comes after “Construction supervision” and “Design and permits”, next to “Concrete works”, and finishes before “Facade works” and “Interior finishing”, while the structure is open for opening up and inspection.

Turnkey bathroom

Turnkey bathroom

A turnkey bathroom at the finishing stage of the house: from the hidden service layers to the tiling and fitted sanitaryware.

We build bathrooms and WCs end to end in Tbilisi, either within a house or as a standalone order. The scope covers strip-out on renovations, water and drainage pipework, waterproofing of wet areas, screed with falls, tiling and porcelain, and installation of sanitaryware, furniture and ventilation. In a turnkey house the bathroom builds on the shared stages: plumbing, waterproofing and screed, and the final finishes then go onto completed surfaces. So the quality of the hidden layers decides the result of the whole finishing phase.

Interior finishing

Interior finishing

Interior finishing for a turnkey house, from plaster on beacons to the final coat of paint and the doors. It is done in the sixth phase, once the electrics, plumbing and screed are closed up.

We deliver the full finishing package: plaster, drywall construction, filling for paint, painting, floor coverings, doors and ceilings. Work starts when the electrics and plumbing are installed and the screed has gained strength and dried. If another contractor did the services and the screed, we first look at what is hidden in the walls and floor and fix the price from the condition report. When we finish, we hand over clean rooms for the smart-home equipment and the site works. Finishing is visible at once, yet it rests on layers that are already closed, so the order of work and the technological pauses come before speed.

Air conditioner installation

Air conditioner installation

Split AC installation, concealed pipe runs and seasonal cleaning for apartments, houses and offices. Orders start from 1,000 ₾.

Air conditioner installation: fitting the indoor and outdoor units, copper pipe run, drainage, power supply, evacuating the lines and start-up. Cleaning and maintenance are available as a separate job.

Stretch ceilings

Stretch ceilings

PVC and fabric stretch ceilings for apartments, houses and commercial premises. The survey is free, orders start from 1,000 ₾.

Stretch ceiling installation: fixing the profile, mounting plates for lights and curtain tracks, stretching the membrane and fitting the lights. We work over finished walls with very little dust.

Demolition works

Demolition works

We strip out old finishes, partitions and screeds cleanly, with debris removed.

Demolition works in Tbilisi, standalone or within a house project: tile, screed, partitions and plumbing stripped out, with debris removed before finishing.

Drywall works

Drywall works

Partitions, niches and boxing built to exact geometry, ready for finishing.

Drywall installation in Tbilisi: partitions, niches, boxing and soundproofing, with walls prepared for paint. Fixed estimate and warranty.

Painting works

Painting works

Surfaces prepared and painted evenly, with no streaks, patches or visible joins.

Painting works in Tbilisi, standalone or within a house project: filling, sanding, priming and two coats on walls and ceilings. Fixed estimate and warranty.

Wallpaper installation

Wallpaper installation

Walls prepared and paper hung with a matched pattern and tight, clean seams.

Wallpaper hanging in Tbilisi: non-woven, vinyl and designer papers with wall preparation, a matched pattern and clean reveals.

Flooring installation

Flooring installation

Laminate, luxury vinyl, parquet and engineered board laid on a checked, level subfloor.

Flooring installation in Tbilisi: laminate, luxury vinyl, parquet and engineered board, plus skirting and thresholds on a checked subfloor.

Door and window installation

Door and window installation

Doors and windows set to level, with even gaps and clean reveals.

Door and window installation in Tbilisi, standalone or within a house project: internal doors, entrance sets, windows and reveals.

Balcony renovation

Balcony renovation

A balcony turned into dry, warm and genuinely usable space.

Balconies and loggias in Tbilisi, standalone or in a house project: insulation, waterproofing, finishes, flooring, glazing and built-in storage. Fixed estimate.

Wall plastering

Wall plastering

Walls levelled to beads, ready for paint, wallpaper or tile.

Wall plastering in Tbilisi: substrate preparation, priming, beads and a flat surface checked by laser, ready for the final finish.

Apartment soundproofing

Apartment soundproofing

Everyday noise cut through walls and ceilings with minimal loss of floor area.

Soundproofing of walls and ceilings in Tbilisi, standalone or within a house project: framed systems, mineral wool, membranes and sealed junctions.

Cosmetic renovation

Cosmetic renovation

Painting, wallpaper, flooring and ceilings without major demolition, in 2–4 weeks, in an apartment or in a new house.

Cosmetic renovation of an apartment or house: wall prep, painting, wallpaper, laminate and skirting replacement, ceiling and reveal refresh without engineering replacement.

New-build apartment renovation

New-build apartment renovation

An apartment taken from black or white frame to move-in: utilities, screed, plastering and finishes. Orders start from 1,000 ₾.

New-build apartment renovation: partitions, electrics, water supply and drainage, screed, plastering, tiling, flooring, painting, doors and sanitary ware. The scope depends on the condition in which the developer handed over the apartment.

Office and commercial renovation

Office and commercial renovation

Renovation of offices, shops, cafes and salons in Tbilisi with a fixed estimate. Bank transfer for companies, orders from 1,000 ₾.

Commercial renovation: strip-out, partitions, electrical and low-voltage networks, ventilation and air conditioning, ceilings, floors and final finishes matched to how the business works.

Interior design

Interior design

An interior project from layout to working drawings and material schedules. Designer supervision during renovation, orders from 1,000 ₾.

A design project for an apartment, house or commercial space: site survey, layout plan, 3D visuals, drawings for the builders, material schedules and designer supervision.

Custom kitchens and furniture

Custom kitchens and furniture

Kitchens, wardrobes, walk-in closets and built-in furniture made to the size of the room, from survey to appliance connection. Orders start from 1,000 ₾.

Custom furniture: survey, design with appliance layout, making the cabinets and fronts, fitting, installing the worktop and sink, and connecting built-in appliances. We make kitchens, sliding wardrobes, walk-in closets and furniture for alcoves.

Self-levelling floors and microcement

Self-levelling floors and microcement

A level floor under your covering, a resin floor for the garage and seamless microcement on floors and walls. Orders start from 1,000 ₾.

Self-levelling floors: preparing and priming the substrate, pouring self-levelling compound, and resin coatings for heavily used spaces. Microcement is applied in a thin layer to floors and walls, including bathrooms, and sealed with a protective varnish.

Sauna and bathhouse construction

Sauna and bathhouse construction

A sauna in a house or apartment, a bathhouse on your plot or a hammam, from insulation to heater and finishing. Orders start from 1,000 ₾.

Sauna and bathhouse construction: framing, insulation, vapour barrier, ventilation, heater installation, electrics, timber or tile finishing, benches and door. We work in an existing room or build a separate bathhouse on the plot.

Natural stone cladding

Natural stone cladding

Facades, plinths, fences, retaining walls and steps in natural stone. Orders start from 1,000 ₾.

Natural stone cladding: preparing the substrate, setting out, fixing with adhesive and anchors, filling the joints and applying a protective sealer. We work with slabs, flagstone and split-face stone.

Attic and house extension

Attic and house extension

An extra storey, an attic floor or an extension: survey, design, permit documents, frame and roof. Orders start from 1,000 ₾.

Attic and house extension: survey of the foundation, walls and floor slabs, design, permit documents, strengthening, frame, roof, insulation and windows. The decision on the permit is made by City Hall.

Apartment handover inspection

Apartment handover inspection

An engineer checks the apartment or house before you sign and prepares a defect report with photos. We quote the cost before the visit.

Handover inspection of a developer apartment: wall and screed geometry, windows, the entrance door, electrics, water supply, drainage and ventilation, plus a floor area measurement. Every finding goes into the defect report.

Window repair

Window repair

Adjustment, new hardware, seals and glazing units, insect screens. The price is quoted by phone before the visit.

Repair of uPVC windows and balcony doors: sash adjustment, replacement of handles, hinges and locking mechanisms, new seals, glazing unit replacement and insect screens.

Shower enclosure installation

Shower enclosure installation

Assembly of a shower cabin or corner enclosure, tray, connection and sealing. The price is quoted by phone before the visit.

Shower enclosure installation: checking the space and the pipe outlets, levelling the tray, assembling the panels and doors, connecting water and waste, sealing the joints and testing with water.

Drain cleaning

Drain cleaning

We clear blockages in flats and houses: sinks, baths, toilets and drain outlets. The price is quoted by phone before the visit.

Drain cleaning: locating the blockage, mechanical cleaning with a cable, high-pressure water jetting and pipe inspection. After the job we test the flow and explain what caused the blockage.

Construction waste removal

Construction waste removal

We take away waste after renovation and demolition: carrying down, loading and removal. The price is quoted by phone before the visit.

Construction waste removal: estimating the volume from photos, carrying the waste out of the flat or off the plot, loading it into the truck and taking it away. Afterwards we sweep the area where the waste lay and the route we carried it along.

Prices are approximate, for labour, excluding materials. Exact estimate after a site visit and measurements.

House construction cost per m² by completion stage, 2026
StagePrice, ₾/m²What is included
Shell500–700Foundation, concrete structure, masonry and roof — no windows, no engineering, no finishes. Chosen when the finish is planned later or done in-house.
Ready for finishing850–1,100Shell plus the full engineering and rough-works package. The house can be mothballed for any length of time and finished once the interior design is ready.
Full cycle1,250–1,550From foundation to the handover of keys: engineering, finishing, final materials and cleaning. The most predictable option on timing — there is no downtime between contractors.

Updated:

Did not find the service you need?

We also take non-typical directions — restoration of older stock, wine cellars, spa zones, pools, landscaping. Describe the task.

Discuss the project

Planning to build a house?

Start with a free consultation about your plot, floor area and budget. If you are still looking for land, tell us about a plot you are considering.

We will call within an hour, 24/7. You do not need drawings for the first conversation.

By submitting the form you agree to personal data processing. Privacy Policy