Concrete works
Concrete works are the frame of the house: columns, walls, slabs and seismic belts, poured after the foundation and before the roof. In Tbilisi stroydom.ge prices concrete works line by line: rebar 800–1100 ₾ per installed tonne, formwork 25–40 ₾ per m² of contact surface, placement 60–90 ₾ per m³ (concrete extra). Turnkey: strip foundation 480–620 ₾/m³, raft 650–820 ₾/m³, a 200 mm slab 220–290 ₾/m². The minimum scope is 30 m³ of concrete or 5 t of rebar. We take concrete works as a standalone order and as part of a turnkey house, where they sit in one estimate with the foundation and the roof.
We carry out the full cycle of concrete works: formwork, reinforcement, placing and curing, with our own crews and our own formwork. We start on an accepted foundation and an approved design, work storey by storey with survey control and laboratory cube tests at 7 and 28 days. The finished frame is handed over to the stair crew, the welders and the roofers. Concrete cannot be redone: finishes can be stripped and laid again, but a poured frame stays for the life of the building, so rebar sign-off and concrete class matter more here than any saving in the estimate.
Our own project: plan your house in 3D
You can order this job on its own
Orders start from 1,000 ₾. An engineer visits and measures free of charge, and we fix the estimate and schedule before work starts. We work in Tbilisi.
About the work
How does stroydom.ge deliver concrete works?
The concrete frame of the house in an intensity-8 seismic zone: columns, slabs and seismic belts designed by calculation, not by the foreman's experience. It is poured on an accepted foundation and handed over to the stair and roof crews.
What is included in concrete works?
Foundations
Strip, raft and pile-grillage foundations for residential and commercial buildings. The type follows the site geology.
Floor slabs
Concrete slabs with load calculations, movement joints, and diaphragm action for seismic loads.
Columns and walls
Load-bearing columns, concrete walls and pylons to the design, with laser-checked verticality.
Stairs and retaining walls
Concrete stair flights of any geometry, and retaining walls on slopes with drainage and soil relief.
Seismic belts and connections
Ring beams over masonry, and the joints between columns, beams and slabs. These redistribute load across the frame in an earthquake instead of concentrating it in one wall.
Sign-off before pouring
Rebar diameter and spacing, cover, tied joints and formwork geometry are accepted by certificate with photographs. Once concrete is placed, the only way to check is to break it out.
Stage of the house build · Phase 3 of 7: Structural frame
At what stage of building a house is the concrete frame poured?
- 1Design and site preparation
- 2Groundworks and foundations
- 3Structural frame
- 4Roof and weathertight shell
- 5Building services
- 6Finishing
- 7External works
The concrete frame is poured during the frame stage: after the foundation and the approved design, before the roof, the stairs and the welded structures. First the axes and levels are set out from the accepted foundation. Then on each storey the formwork goes up, the rebar for columns, walls and slabs is tied, accepted on a hidden-works certificate and concreted with cubes taken. Seismic belts are poured at the level of every slab, and formwork is struck only once the concrete has reached its actual measured strength.
When a storey is accepted, the cycle repeats above. Along with the concrete, the frame takes in everything that cannot be added later without drilling: embedded parts for the stairs, anchors for the wall plate, bearing connections for metalwork. Until the concrete is finished and accepted we do not start the roof: its rafter structure is fixed to the seismic belt, not to the masonry. Redoing embedded parts in concrete that has gained strength costs more than a decision made while the cage is being tied.
What must be finished first
Before the concrete works, the “House foundation” and “Design and permits” must be ready. The foundation is accepted on axes and levels, the concrete has gained strength and the rebar starters are set to the layout. The design is approved: structural drawings, reinforcement schemes, concrete grades and rebar classes are agreed with the designer. Without a design the cage is tied from the crew's memory, and nobody has calculated the seismic load. Before starting we compare the architecture with the structure: we look for discrepancies on paper, where they are cheapest to resolve.
What comes next
After the concrete works come “Concrete stairs”, “Welding and metalwork” and “Roofing”. Stair flights are poured into ready openings, onto starters left in the slabs. Welders erect metalwork on the embedded parts that the concrete crew left in place. Roofers fix the wall plate to the seismic belt and build the rafter structure on the accepted frame. We hand over the as-built survey of the geometry, the hidden-works certificates and the cube reports. Windows, building services and finishes in the house also take their levels from our frame.
Where does this work meet the neighbouring trades?
Foundation and columns
The columns and walls of the first storey stand on the starters set during the foundation pour. Before starting, we compare axes, levels and the position of the starters with the as-built survey. An offset in the base cannot be corrected higher up: it repeats on every storey, and a starter fixed later on a chemical anchor works less well.
Design and formwork
The concrete crew receives the design with agreed concrete grades, reinforcement schemes and details. We resolve discrepancies between architecture and structure before formwork. Opening sizes, embedded parts for windows and service entries go into the drawing in advance, otherwise they have to be chased out of poured concrete.
Concrete and stairs
Stair flights sit in slab openings, and the rebar starters for them are left when the slab is poured. We check the opening size and the storey height against the stair calculation. If the opening is made without that tie-in, the flight hits the slab or ends up with an awkward step.
Roof and welding
Embedded parts for metalwork and anchors for the wall plate are set into the seismic belt before concreting. Roofers and welders accept the levels on a certificate. Cutting out embedded parts or drilling through the seismic belt on the finished frame weakens a joint that works under earthquake load.
What is concrete works and why is it needed?
Concrete structures are the load-bearing skeleton of a building, and its durability, seismic resistance and the safety of its occupants depend on them. A large part of Georgia is seismically active, and precisely executed concrete here is a matter of engineering responsibility. The risks are lopsided: a mistake in the finishes shows at once and costs the price of redoing the finishes; a mistake in the concrete never shows and costs the price of the whole building.
There is no room here for decisions based on the crew's experience. Concrete is needed where precast solutions do not give the required performance: complex slab spans, non-standard footprints, slopes, terraces, pools, retaining walls, foundations for heavy equipment. Quality comes from technology: a mix suited to the strength class and service conditions, accurate formwork geometry, a cage tied with proper cover, thorough vibration and curing during the first 24 hours.
A 15 mm cover instead of the designed 30 mm does not show in a photo and changes nothing on pour day, but after 12–15 years the rebar starts to corrode and the concrete spalls. That is why cover spacers and a photo record of the reinforcement are mandatory on every project. The order of work is set by technology.
Concrete is poured after the foundation: columns and walls stand on its starters, and axes and levels are taken from the accepted as-built survey. If work starts earlier, on an unaccepted base, an error in the axes repeats on every storey. After that the stairs, the welded structures and the roof follow on the finished frame, and each of them relies on the embedded parts and levels that the concrete works left behind.
When one contractor runs the foundation, the frame and the roof, they share one estimate, one schedule and one responsibility for the joints.
What stages does concrete works consist of?
Each stage runs only after the previous one is accepted — so hidden works are never "closed" before inspection, and a mistake never has to be hunted for through screed and plaster.
- 1
Studying the design
Analysis of structural drawings, reinforcement schemes and specifications, and agreement of concrete grades and rebar classes with the designer. This is where discrepancies between architecture and structure usually surface, and resolving them on paper is far cheaper.
- 2
Preparing the base
Setting out axes, excavation, compaction, crushed-stone and blinding layers under the foundation. An under-compacted base settles unevenly, and cracks appear two or three seasons later rather than immediately.
- 3
Formwork
Panel or small-panel formwork erected to precise geometry, checked with level and plumb, with embedded parts and openings set out. The geometry of the formwork is the geometry of the future house.
- 4
Reinforcement
Rebar cages tied to the drawings, respecting spacing, laps, anchorage and cover, with spacers installed. The whole cage is photographed with a tape measure in frame and accepted by the client before pouring.
- 5
Pouring
Acceptance of concrete with the plant certificate, placement in layers, compaction with immersion vibrators, surface finishing. Pours run continuously: a cold joint in the wrong place is the plane where the structure will later fail.
- 6
Curing
Protection from drying, wetting, covering with film or geotextile, and monitoring strength gain before striking. In a Tbilisi summer, unprotected concrete loses water within hours and cracks from shrinkage.
- 7
Striking and acceptance
Formwork removed on actual strength, surfaces inspected, defects made good, and an as-built survey of geometry handed to the client.
How does stroydom.ge control quality on site?
How we work on site — materials, equipment, tolerances, documentation and acceptance of hidden works.
Mix control
We check slump and temperature of every delivery on site and take cubes for laboratory testing at 7 and 28 days. A batch outside spec is turned away, which is cheaper than cutting out a finished structure.
Survey control
Axes, levels, thicknesses and verticality are checked with a level and theodolite at each stage. A deviation is corrected on the current floor rather than accumulating up to the roof.
Winter concreting
At low temperatures we use antifreeze admixtures, wire heating or heated enclosures, monitoring the temperature inside the element.
Hidden works
Reinforcement is signed off on a hidden-works certificate with a photo record and the client’s signature before concrete is placed. A copy of the certificate and the photos go into the as-built folder.
Safety
Scaffolding, edge protection, fall arrest at height, certified concreters and slingers, and protective equipment for the whole crew.
What should be accounted for in Tbilisi and Georgia?
What we account for here: seismic intensity 8 (MSK-64), hot summers and damp winters, steep terrain, older stock with timber floors and worn city networks.
Seismic details
Extra stirrups at 100 mm spacing in plastic hinge zones, reliable anchorage of longitudinal rebar, and seismic joints between sections of long buildings. The column-to-beam connection is the most heavily loaded point of the frame and the first to fail when reinforced badly.
Heat
In summer the mix arrives at up to +30 °C. We pour early in the morning or in the evening, cool the rebar with water and use retarders. Otherwise the concrete sets before vibration is finished.
Frost
Below +5 °C we switch to concrete with antifreeze admixtures and heat the element with wire or enclosures. It adds 8–15% to the cost but preserves the design strength.
Logistics on slopes
In the older districts of Tbilisi a long-bed truck cannot get in, so we use a hiab and a mini-crane and pump the concrete. This is planned before the start, not improvised on the day.
Plants and certificates
Concrete only from certified Georgian batching plants (HeidelbergCement Georgia, Caucasus Cement) with a batch certificate, which is handed to the client along with the certificates.
Retaining walls on a slope
On plots with a level difference, a retaining wall without drainage and weep holes will eventually be overturned by hydrostatic pressure. We calculate it as a structure in its own right, not as “thick masonry along the edge”.
Embedded parts before concreting
Everything that must end up in the concrete is set before the pour: sleeves for service entries, anchors for the wall plate, embedded parts for stairs and metalwork. Drilling a finished seismic belt or cutting rebar is not allowed: a weakened joint is the first to take the load in a tremor. We collect the list of embedded parts from every contractor at the formwork stage.
Load on young concrete
Concrete does not reach design strength at once, so we do not stack pallets of material or scaffolding on a fresh slab. A storey is loaded after formwork is struck, on actual strength. While the upper storey gains strength, we keep the lower one on props.
How much does it cost and how long does it take?
Indicative price ranges in lari (₾) for standard conditions. The final estimate is fixed after measurements and specification approval.
| Item | What is included and the price |
|---|---|
| Reinforcement | 800–1100 ₾ per tonne of installed rebar (labour only), depending on diameter, spacing and cage complexity. |
| Formwork | 25–40 ₾ per m² of contact surface. Curved walls and non-standard columns are priced individually. |
| Concreting | Acceptance and placement with vibration: 60–90 ₾ per m³ (excluding the concrete itself). |
| Turnkey by type | Including materials: strip foundation 480–620 ₾/m³, raft 650–820 ₾/m³, 200 mm floor slab 220–290 ₾/m². |
| Minimum volume | From 30 m³ of concrete or 5 t of rebar we mobilise our own crew. Below that a factor of 1.15–1.25 applies. |
| Terms | Prices are fixed in ₾ in the contract; changes to geometry or concrete class are agreed in writing before the work is done. |
Updated:
Ready to estimate?
Leave a request — engineer site visit, measurement and a preliminary estimate for "concrete works" are free.

Need the “Concrete works” service?
Leave your phone number: we call back within an hour, clarify the scope and arrange a free site visit.
We will call within an hour, 24/7. You do not need drawings for the first conversation.
By submitting the form you agree to personal data processing. Privacy Policy
Frequently asked questions — Concrete works
What foundation does a house in Tbilisi need?
It depends on the soil, not on the size of the house. Dense soils and rock suit a strip foundation; the collapsible loess of Gldani and Digomi calls for a raft; slopes and weak soils need a pile-grillage on bored piles. Geology decides: without it, choosing a foundation is a lottery where the stake equals the cost of the whole house.
What grade of concrete do you use?
M300 (B22.5) for foundations and slabs of private houses, M350–M400 for loaded columns and retaining walls. We only take concrete from certified plants with a batch certificate. The grade is set by the design: dropping it one step saves about 5% on concrete and removes 15–20% of the load capacity.
How do you verify that the concrete reached strength?
We take control cubes from every significant batch and send them to a laboratory for testing at 7 and 28 days. On site we also check the slump and the temperature of each delivery. Formwork comes off on actual measured strength, not “after three days”.
What is a seismic belt and is it mandatory?
A seismic belt is a continuous reinforced concrete band around the walls at each floor level. It ties the masonry into a single rigid contour and stops the walls from separating under horizontal load. In the intensity-8 zone that covers Tbilisi it is a mandatory element, not an optional saving.
Can concrete be poured in winter?
Yes, with caveats. Below +5 °C we use antifreeze admixtures, wire heating or heated enclosures. That adds 8–15% to the groundworks and requires continuous temperature monitoring. Where the schedule allows, concrete work is best planned between March and November.
What if a mixer cannot reach the plot?
We pump the concrete, with a boom that reaches up to 40 m horizontally. In the older districts (Sololaki, Avlabari, Mtatsminda) we use a hiab and a mini-crane for rebar and formwork. Pumping is priced as a separate line in the estimate and is known before the start, not halfway through.
In what order are the foundation, columns and slabs poured?
From the bottom up and in sections: the foundation, the columns and walls of a storey, then the slab with its seismic belt, then the next storey. Each element is accepted on a certificate before concreting, and the next storey starts once the one below has gained strength. No stage can be skipped: the columns above rest on what is poured below.
Can the concrete works start before the foundation is accepted?
No. Columns and walls are set on an accepted foundation whose axes, levels and rebar starters have been checked. Starting earlier means working from unchecked geometry, and the error climbs with every storey. Accepting the foundation takes little time compared with correcting the frame.
When can the roof and stairs start after the concrete works?
After formwork is struck on actual concrete strength and the geometry is accepted. Stairs are poured into the openings the concrete works have already left, and roofers anchor the wall plate to a seismic belt that has gained strength. Loading the frame earlier is not allowed: the concrete has not yet reached its design strength.
What changes if I order the concrete works separately from the house?
We carry out a standalone order by the same rules: design, certificates, laboratory control. The difference is in the joints. The foundation, the embedded parts and the openings for stairs, windows and metalwork have to be agreed with other contractors, and each answers for their own part. In a house contract one contractor runs everything from the foundation to the roof under one estimate and schedule.