Audit of another contractor’s house construction estimate

Review of another contractor’s estimate

Audit of another contractor’s house construction estimate

An audit of another contractor’s estimate at stroydom.ge is free and takes 2–4 working days from receipt of the estimate and the design. You get a written report: omitted items, comments on quantities, materials and contract terms, and an assessment of what the house will really cost. A construction contract is not required: the report stays with you.

If you are holding an estimate from another contractor and the figure looks suspiciously low, the issue is usually not the price but what the estimate leaves out. We check the figures against the design and the real sequence of construction stages and issue a written report: what is missing, where quantities are understated and what the house will actually cost. We do not talk you out of your contractor; you get a list of questions worth asking before you sign.

What does the estimate audit cover?

The estimate is reviewed by an engineer who prices reinforced concrete houses himself. The review runs along five lines, where the gap between an attractive price and the real one usually hides.

Completeness of the scope

We compare the estimate against the real sequence of stages. Commonly missing: earthworks and spoil removal, waterproofing, subfloors, first-fix services for the final finish, utility connections and site reinstatement after the build.

Quantities

We take off quantities from the design and compare them with those stated. Understating concrete volume, plaster area or cable runs is the most common way to present an attractive bottom line.

Materials and specifications

We check whether concrete grades, reinforcement class, waterproofing and insulation types are actually named. The phrase "material to be agreed" is an open item that later becomes a variation.

Contract and payment terms

The payment schedule, the procedure for changing the estimate, warranty obligations and what happens if deadlines slip shape your risk more than the price per m².

Written report

A report listing the omitted items and an assessment of the realistic final cost, which is enough to go back to your contractor and discuss the estimate on specifics.

How does the estimate audit work?

Four steps, no site visit and no obligation to build with us.

1. You send the documents

The estimate in any form (spreadsheet, PDF, photos) and the design, if there is one. Without a design we can still check the scope and the contract terms; quantities can only be estimated, which affects the audit fee.

2. We clarify the inputs

A short call: the plot, number of storeys, what has already been done, what the contractor promises verbally and what is not on paper. At this point we name the exact audit fee.

3. We calculate and compare

The engineer takes off quantities from the design, checks the scope against the construction sequence, verifies material grades and reviews the contract terms.

4. Report and walkthrough

Within 2–4 working days you receive the written report and a call where we go through it point by point. What happens next is your decision: go back to your contractor with questions, or discuss the build with us.

How long does the estimate audit take and what do you get?

How long does the estimate audit take and what do you get?
ItemWhat is included and the price
FreeThe audit costs nothing. We read the estimate, the design and the contract and give you a written report; you pay only for construction if you build with us.
No obligationYou do not have to build with us: the report stays with you and the decision is yours.
DeliverableA written report: the list of omitted items, comments on quantities, materials and contract terms, and an assessment of the realistic final cost of the project.
Timing2–4 working days from receipt of the estimate and the design. Without a design, closer to the lower end, because there is nothing to take quantities from.

Free

The audit costs nothing. We read the estimate, the design and the contract and give you a written report; you pay only for construction if you build with us.

No obligation

You do not have to build with us: the report stays with you and the decision is yours.

Deliverable

A written report: the list of omitted items, comments on quantities, materials and contract terms, and an assessment of the realistic final cost of the project.

Timing

2–4 working days from receipt of the estimate and the design. Without a design, closer to the lower end, because there is nothing to take quantities from.

Updated:

Send us the estimate and we will check it for free

Attach the estimate and the design in any form. We reply within one working day with the timeline. No obligation to build with us: even if you stay with your contractor, you will know the real cost of the house.

We will call within an hour, 24/7. You do not need drawings for the first conversation.

By submitting the form you agree to personal data processing. Privacy Policy

Estimate audit FAQ

How much does the estimate audit cost?

Nothing. The audit is free: you send the estimate and the design, we return a written report. It is not a condition of a contract — you are not obliged to build with us.

Can an estimate be checked without a design?

Yes. The scope, the contract terms and the material wording can be checked without a design. Quantities without a design can only be estimated, and the report states explicitly which items cannot be accurate and why.

What do I get at the end?

A written report: the work missing from the estimate, comments on understated quantities and unspecified materials, a review of the contract terms and an assessment of the realistic final cost. Plus a call where we go through the report point by point.

Will you talk me out of my contractor?

No. Our job is to show what the estimate includes and what it does not. With the report you go back to your contractor and discuss the estimate on specifics. If you decide to build with us, we will discuss the estimate as the basis of the contract. That is your choice, not a condition.

How long does the review take?

Usually 2–4 working days after we receive the estimate and the design. A large turnkey estimate with several sections may take a little longer; we tell you on the first call.

Do you review estimates for apartment refurbishment or timber-frame houses?

Any construction estimate can be reviewed. We take apartment refurbishment as a standalone order from 1,000 GEL, so after the review we can price that work too. We build houses only in monolithic reinforced concrete, so for a timber-frame house the report comes as a review only, without an offer to build.