
About
Construction company in Tbilisi: building houses and commercial projects since 2014
stroydom.ge has worked in Georgia since 2014: 50+ projects delivered, with in-house crews on every stage from the concrete frame to the final coat — no subcontracting. The estimate is fixed in the contract in lari, the advance never exceeds 15 %, and the structural warranty is 10 years. Stage deadlines are written into the contract, and the engineer’s site visit is free.
Our engineers, site managers and crews handle projects in Tbilisi from the first sketches through to handover.
Who are we, and what have we built?
Over 10+ years in Georgia and abroad we have delivered 50+ projects: private houses, cottages, apartments, guest houses and commercial buildings. The full cycle — design, concrete works, engineering, finishing — is performed by our own crews without intermediaries. That is a deliberate choice: subcontracting is convenient for the contractor, but it is precisely at its seams that the client loses time and money.
We pay equal attention to foundations and to the final coat of paint. Concreting quality defines the geometry of the building and whether doors and glazing will fit as designed; finishing defines how the house looks and performs ten years later. So there are no "unimportant" stages here: hidden works are photographed before closing, and every stage is accepted against the same checklist regardless of the project budget.
How do we run a build?
One contract, one team, one responsible foreman — this removes finger-pointing between contractors and keeps the schedule. The budget is fixed at start; changes are agreed in writing and only before the work is done, so no variation order appears without your signature. Payment follows accepted stages rather than the calendar, which means the contractor is motivated to close stages instead of stretching the build.
| stroydom.ge in numbers | stroydom.ge |
|---|---|
| years of experience in Georgia and abroad | 10+ |
| completed projects | 50+ |
| warranty on all types of works | up to 10 years |
Updated:
Which principles do we keep on every site?
Experience
10+ years in residential and commercial construction in Georgia — from houses on steep slopes to rental buildings.
Responsibility
A contract with a fixed estimate and stage deadlines.
Transparency
Every stage approved, photo reports kept, and a financial plan showing what is left in the budget.
Team
Our own engineers, foremen, concrete crews, finishers and services teams — no hiring off classified ads.
Technology
Load and seismic calculations, modern materials and solutions already proven on delivered projects.
Quality
Geometry, moisture, concrete strength and pressure testing of engineering systems checked on every project.

Planning to build a house?
Start with a free consultation about your plot, floor area and budget. If you are still looking for land, tell us about a plot you are considering.
We will call within an hour, 24/7. You do not need drawings for the first conversation.
By submitting the form you agree to personal data processing. Privacy Policy
