Houses we delivered turnkey

Portfolio · 2023–2025

Houses we delivered turnkey

The stroydom.ge portfolio holds 50+ projects built since 2014: private houses, cottages and commercial buildings in Tbilisi, Batumi and Kutaisi. Below are sites from 2023–2025 with their actual budgets, timelines and price per m². Every project was handed over with an as-built folder and a structural warranty of 10 years; deadlines were met 100 %.

Not renders and not moodboards — real construction sites in Georgia with actual budgets and timelines. On some we ran the full cycle, on others only the concrete frame or the engineering. Every project was handed over with an as-built folder and warranty terms on paper.

Need one job rather than a whole house?

We take on any service as a standalone order from 1,000 ₾: an engineer measures up, and the estimate and schedule are fixed before work starts. We work in Tbilisi.

All services

Which houses have we already built?

Modern house in Mtskheta

Private house · Mtskheta · 2024

Modern house in Mtskheta

Clean geometry, a flat usable roof and 22 m² of panoramic glazing. The long spans called for a reinforced frame and exact opening geometry: glazing this size does not forgive deviations beyond 5 mm. Heating, heat recovery and finishing ready for furniture — the client followed the whole build from Germany.

Client

Client from Germany · remote control and daily photo reports

Price per m²

4 200 ₾/м²

What was delivered

  • Area — 310 m², 2 floors + usable roof
  • Term — 12 months
  • Reinforced monolithic frame for the glazing spans
  • Inverted roof with PVC waterproofing
  • Panoramic glazing 22 m², low-emissivity glass units
  • Heat recovery ventilation with 87% efficiency
  • Underfloor heating and fan coils in every room
  • Opening geometry within ±5 mm tolerance
  • Finishing ready for furniture
  • Sign-off certificates for every hidden joint
Budget1 302 000₾
Cottage in Batumi

Cottage · Batumi · 2024

Cottage in Batumi

A 180 m² guest cottage 400 m from the sea, built for short-term rental. Coastal humidity and salt air are the main enemy here, so we reinforced the plinth waterproofing, protected every embedded part and specified moisture-resistant finishes. Inspection hatches at every joint mean a technician is inside in five minutes without opening walls between guest stays.

Client

Investor for short-term rental · Booking-ready

Price per m²

3 500 ₾/м²

What was delivered

  • Area — 180 m², 1 floor + attic
  • Term — 7 months
  • Reinforced foundation and plinth waterproofing
  • Corrosion protection on all embedded parts
  • Moisture-resistant finishing
  • Inspection hatches at every engineering joint
  • Plumbing for 4 bathrooms
  • Low-voltage wiring for guest lock system and Wi-Fi
  • Delivered to Booking standards
Budget630 000₾
Apartment interior

Interior · Tbilisi · 2025

Apartment interior

Full finishing of a 95 m² apartment to an existing design project: plaster on beacons, tile, electrics, lighting, doors. The work ran in an occupied building, so noisy-hours and waste removal were agreed with the building management up front. The owners moved in on handover day with zero rework.

Client

Family from Russia · relocation to Tbilisi

Price per m²

1 150 ₾/м²

What was delivered

  • Area — 95 m²
  • Term — 10 weeks
  • Semi-dry floor screed, 95 m²
  • Plaster on beacons, ±2 mm/m tolerance
  • Electrics — 32 points, labeled distribution board
  • Plumbing for 2 bathrooms
  • Porcelain tile laid, 38 m²
  • Wall and ceiling painting
  • Interior doors and sanitary ware installed
  • Cleaning and handover on the day the handover certificate was signed
Budget109 000₾
Commercial building

Commercial · Kutaisi · 2023

Commercial building

A 720 m² retail and service building with open planning, distributed engineering and a ventilated curtain wall. The 12 m spans were deliberate: the developer did not yet know the profile of the future tenants, so the building was designed for any subdivision with per-floor metering nodes. Delivered for tenant fit-out.

Client

Local developer · handover to tenants

Price per m²

2 700 ₾/м²

What was delivered

  • Area — 720 m², 2 floors
  • Term — 12 months
  • Monolithic frame with spans up to 12 m
  • Ventilated curtain wall, 480 m²
  • Engineering distributed with per-floor metering nodes
  • 6 separate commercial units
  • Loading and unloading zones with separate driveways
  • Backup power supply and fire alarm system
  • Delivered for tenant fit-out
Budget1 944 000₾

Budgets and price per m² are the actual figures at handover. The exact estimate for a new project comes after a site visit and measurements.

Updated:

Did not find a similar project?

We also take on non-standard work — restoration of older stock, wine cellars, spa zones, pools, landscaping and site works. Describe the task and we will put together a solution and a team.

Discuss the project

Planning to build a house?

Start with a free consultation about your plot, floor area and budget. If you are still looking for land, tell us about a plot you are considering.