Privacy Policy

Privacy Policy

This document explains what data we receive through the stroydom.ge website, the purposes we process it for, and how you can manage it.

Updated: 2026-11-18

Who processes your data

The data controller is stroydom.ge, a construction company operating in Tbilisi. For any questions about personal data, write to us at [email protected].

What data we collect

From the request form: your name and phone number (required), plus the message text if you choose to leave one.

Technical data captured on submission: IP address, browser type (user-agent), the date and time of your request, the page it was sent from, and how you reached the site (referring site or ad tags in the link). This helps us guard against spam and handle your request.

Why we process your data

To get in touch with you about your request, prepare an estimate, and deliver the service. We do not use your data for marketing communications without your separate consent.

Legal basis

We process your data on the basis of the consent you give by ticking the relevant box and submitting the form. You can withdraw this consent at any time by contacting us.

Who we share your data with

Your request is stored in the company’s request database and reaches an authorized staff member as a Telegram notification. The website and the request database run on Cloudflare infrastructure. We do not sell your data or pass it to third parties for advertising.

How long we keep your data

Request data is kept for as long as needed to handle your enquiry and follow up with you, after which it is deleted. You may ask us to delete it sooner.

Your rights

You can request access to your data, its correction or deletion, and withdraw your consent to processing. Just write to [email protected] and we will respond within a reasonable time.

Cookies and analytics

The website uses Yandex Metrica with a click map and Session Replay (Webvisor) to understand what is difficult to use and improve the site. Webvisor records cursor movements, clicks and page scrolling.

Metrica sets its own cookies. Recording of form field contents is disabled: the name, phone number and request text you enter are not included in Webvisor recordings.

You can opt out in your browser settings (blocking cookies) or with Yandex’s Metrica opt-out add-on. Apart from that, we rely only on the technical means required to run the site and protect the form.

Changes to this policy

We may update this policy from time to time. The current version is always available on this page, with the date of the last update shown above.

Planning your new home?

Start with a free consultation about your plot, floor area and budget. We will then arrange an engineer’s visit and explain what is needed for an estimate.

We will call within an hour, 24/7. You do not need drawings for the first conversation.

By submitting the form you agree to personal data processing. Privacy Policy