Building a house to rent out in Georgia

Income property

Building a house to rent out in Georgia

stroydom.ge builds rental houses in Tbilisi and Batumi for 1,400–1,800 GEL/m² turnkey with hard-wearing finishes. Furniture, appliances and textiles add 350–700 GEL/m². Splitting the house into units with separate entrances and meters adds 6–12% to the budget. From the start of design to the first tenants takes 12–16 months. stroydom.ge calculates the rent and payback from comparable properties in the district: a benchmark at the time of calculation, not a promise of income.

A house for yourself and a house to rent out are designed differently. In a rental property what matters is not a grand living room but the number of bedrooms, how well the finishes wear, separate entrances, and what it costs to turn the property around between tenants. We design and build for rental from the outset instead of retrofitting later.

Where in Georgia should you build for rental?

  • Saburtalo and Vake: steady long-term demand from relocators, families, students near the universities
  • Central Tbilisi: short-stay and tourism year round, but higher demands on sound insulation and parking
  • Digomi and Mtskheta: family long-term rentals of houses with a yard, demand from people leaving the centre
  • Batumi and Kobuleti: pronounced seasonality, apartments and guest houses, income concentrated May–September

What does stroydom.ge do for a rental house?

  • Project economics before design: how many bedrooms, which rental format, what rate comparable properties achieve
  • Design for the chosen format: layouts, separate entrances, metering, sound insulation
  • Turnkey construction with a fixed budget and a 10-year structural warranty
  • Rental-ready fit-out with furniture, appliances and textiles, so the property is ready to receive tenants
  • Launch: meter connections, documentation, help with photography and listing

What does a rental house cost and when does it pay back?

What does a rental house cost and when does it pay back?
ItemWhat is included and the price
Construction for rental1,400–1,800 GEL/m² turnkey with hard-wearing finishes. Below premium but above minimum spec, because on a rental property saving on materials comes back as repairs.
Fit-outFurniture, appliances and textiles for letting: 350–700 GEL/m² depending on format and segment.
Splitting into blocksSeparate entrances, metering and sound insulation between blocks add 6–12% to the budget but noticeably improve occupancy.
Time to first tenancy12–16 months from the start of design to move-in when building from scratch.
On returnsRates and payback are calculated from comparable properties in the district at the time of calculation. That is a benchmark, not a promise: rental markets shift, and we say so plainly.

Construction for rental

1,400–1,800 GEL/m² turnkey with hard-wearing finishes. Below premium but above minimum spec, because on a rental property saving on materials comes back as repairs.

Fit-out

Furniture, appliances and textiles for letting: 350–700 GEL/m² depending on format and segment.

Splitting into blocks

Separate entrances, metering and sound insulation between blocks add 6–12% to the budget but noticeably improve occupancy.

Time to first tenancy

12–16 months from the start of design to move-in when building from scratch.

On returns

Rates and payback are calculated from comparable properties in the district at the time of calculation. That is a benchmark, not a promise: rental markets shift, and we say so plainly.

Updated:

Costing a rental property?

Leave your contact and we will discuss the rental format, district and budget and work out what is actually worth building for letting.

We will call within an hour, 24/7. You do not need drawings for the first conversation.

By submitting the form you agree to personal data processing. Privacy Policy

Frequently asked questions about building for rental

Which is better: long-term or short-stay letting?

Short-stay achieves a higher rate but carries higher costs: cleaning, linen, management and off-season vacancy. Long-term earns less but is predictable and almost hands-off. In Tbilisi long-term works year round; in Batumi short-stay concentrates income between May and September. The format must be chosen before design, because the layouts differ.

How much more expensive is building for rental?

The construction itself is comparable; the difference is in the decisions. Hard-wearing finishes add 10–15%, splitting into blocks with separate entrances and meters another 6–12%. In return the property survives many tenancies without refurbishment and can be let in parts. Over five years those choices usually pay for themselves in avoided repairs.

What returns do you promise?

We do not promise returns. For a specific plot and format we provide the numbers: construction cost, timeline and a rental benchmark from comparable properties in the district at the time of calculation. Over the year or so of construction the rental market can move either way, and that belongs in the decision upfront.

Can a house be split into several rentable blocks?

Yes, and it is one of the most effective approaches. A house with two or three independent blocks, separate entrances and meters can be let in parts, never stands fully empty, and offers flexibility: part long-term, part nightly. It has to be designed in from the start; splitting a finished house is expensive.

Does the property need to be furnished?

For short-stay it is essential: an unfurnished property simply will not let. For long-term, furnished homes let faster and for more, especially to relocators who arrive without belongings. We fit out the property completely, including appliances and textiles.

Can the rental be managed remotely?

Yes, most of our clients live outside Georgia. The property is designed for remote management: self check-in with keypad locks, simple and repairable engineering, separate meters. Letting itself is handled by specialist management companies; we build the property so it is easy for them to run.