
Plumbing
Plumbing is the internal water and drainage pipework of the house: it goes in after the roof and before the floor screed, and the fixtures are fitted after the tiling. Rates at stroydom.ge: cold and hot water runs with chasing 28–42 ₾/m, a manifold cabinet from 450 ₾, D50 sewer 22–32 ₾/m, D110 with riser 35–55 ₾/m. Fixture installation: toilet 180–280 ₾, bathtub 350–550 ₾, shower 400–700 ₾, water heater 250–400 ₾. A pressure test at 6–10 bar for 24 hours costs 250–400 ₾. A turnkey bathroom with 4–5 fixtures comes to 2400–3800 ₾ and takes 4–6 days. Prices are fixed per design, and the warranty on leak-tightness is 5 years. We mainly do plumbing as part of a turnkey house; a standalone order starts from 1,000 ₾.
We run cold and hot water and drainage inside the house and fit manifold cabinets, filters and plumbing fixtures. We work with metal-plastic, polypropylene and stainless steel. The pipes go in after the roof and the external services, so rain does not wet the routes and the sewer outlets already sit at their levels. We hand pressure-tested pipework over to the screed and the tiling, and fit the fixtures on finished walls. In a turnkey house all of these hand-offs stay with one contractor.
You can order this job on its own
Orders start from 1,000 ₾. An engineer visits and measures free of charge, and we fix the estimate and schedule before work starts. We work in Tbilisi.
About the work
How does stroydom.ge deliver plumbing?
Internal water supply and drainage pipework for the house: the pipes go in after the roof and before the floor screed, and the fixtures after the tiling.
What is included in plumbing?
Stage of the house build · Phase 5 of 7: Building services
At what stage of building a house is the plumbing done?
- 1Design and site preparation
- 2Groundworks and foundations
- 3Structural frame
- 4Roof and weathertight shell
- 5Building services
- 6Finishing
- 7External works
Plumbing belongs to the building services phase: after the roof and the external services, before the floor screed and the tiling. It comes to site in two visits. The first is the rough-in: the sewer outlets and the water inlet have already been laid during the earthworks, so inside the house we run the drainage with its falls and the cold and hot water from the manifold cabinet, then pressure-test everything, issue the certificate and photograph the routes before they are closed.
The second visit is the finish: toilets, basins, baths, showers and water heaters go in after the tiling, followed by start-up, pressure adjustment and a briefing. Between the two visits the screed and the tiling are done, and they are what closes up everything from the first visit. What goes under them has been checked in advance, and what stays in view is fitted on the finished surfaces and stays clean.
What must be finished first
The roof and the earthworks with drainage must be finished before plumbing. While there is no roof, rain floods the chases and the routes in the floor, and testing with water loads slabs that are not yet protected. The external services, the sewer outlets and the water inlet go in during the earthworks: the falls and levels of all the internal drainage depend on them, and an outlet in a finished foundation is hard to redo. The water source, pressure and entry point into the house are normally set by the site water supply, and the wastewater outlet is planned with the available sewer connection. Without these, the pipes in the house have nothing to connect to.
What comes next
After plumbing come the floor screed, tile installation and the turnkey bathroom. To the screed we hand over pressure-tested routes in the floor, the certificate and the photos: once poured, the base is not opened up. The tiler receives closed chases and outlets for the taps, positioned to the tile layout. In the turnkey bathroom the pipework for the room is ready for waterproofing, tiling and fixtures, and all that remains is to fit them on finished walls. When each following stage accepts the work against a certificate, claims do not turn into arguments about whose leak it is.
Where does this work meet the neighbouring trades?
Hand-off from the roof
The plumber starts when the roof is closed and rain cannot reach the routes. At hand-over we check that the slabs are dry and the gutters and abutments are done. Starting earlier means working with wet chases and pipe ends clogged with dirt, and every downpour stops the installation.
Hand-off from earthworks
The sewer outlets and the water inlet go in during the earthworks, and the internal pipework is built to their levels. At hand-over we check the falls of the outlets and the position of the sleeves in the foundation. A wrong outlet level turns the drainage fall into a defect that only a rebuild corrects.
Hand-off to the screed
The screed hides the horizontal routes, so the pipework is handed to it with the pressure test certificate and photos of the routes. Pipes in the floor are fixed, permanently jointed and kept under pressure while the screed sets. If the screed is poured over an untested route, the leak turns up under the finished floor.
Hand-off to the tiling
The tiler receives closed chases and outlets for the taps, positioned to the layout. Fixtures go in after the tiling, otherwise they have to be removed or boxed round. An outlet that is off the layout forces the tiles to be cut around the pipe or the joint to be redone.
What is plumbing and why is it needed?
Plumbing is a pipe network that is under pressure 24/7. A mistake is expensive: flooded neighbours, mould, a ruined screed. Hidden joints cannot be re-tightened after finishing, so we design the pipework around how the house is actually used, make it manifold-based and leave service access to every demountable joint.
The result is a pressure test and a test certificate. The place in the build follows from the technology. Sewer outlets and the water inlet go in during the earthworks, because the falls and levels of all the internal drainage are tied to them.
Pipes inside the house go in after the roof: while the house is open to rain, chases and open pipe ends get wet and work stops after every downpour. The pipework has to be finished and pressure-tested before the screed, because the screed hides the routes in the floor and any opening after it means breaking up a finished base. Tiling follows, so fixtures go in last, on finished walls, when the concealed parts have already been checked and closed.
The manifold cabinet and the inspection hatches stay accessible: that is where the demountable joints are gathered, and they will need servicing in time. If the order is broken, you pay twice: the screed and tiles are opened up for one leaking coupling, or you live with a wrong fall in the drainage that only a rebuild can fix. When one contractor runs the plumbing, the earthworks, the screed and the tiling, there is one estimate, one schedule and one responsibility for the hand-offs.
The plumber knows the floor levels and the tile layout, the tiler gets the outlets where they are needed, and nobody blames a leak on the neighbouring crew.
What stages does plumbing consist of?
Each stage runs only after the previous one is accepted — so hidden works are never "closed" before inspection, and a mistake never has to be hunted for through screed and plaster.
- 1
Distribution design
Diameter and flow calculation, pipe material choice, cold/hot water and sewer routing.
- 2
Route preparation
Chasing, slab penetrations, sleeves, manifold cabinet.
- 3
Sewer installation
D50 and D110 pipes with slopes, inspection points, fan pipe, slab noise insulation.
- 4
Water installation
PP, metal-plastic or stainless per design, manifold distribution with shut-off valves.
- 5
Pressure test
Water fill, 6–10 bar for 24 hours, drop monitoring, leak fix before closing.
- 6
Sealing and finish
Chase sealing with mesh reinforcement, ready for tile work.
- 7
Fixture installation
After finishing: toilets, sinks, baths, showers, faucets, water heaters, machines, filters.
- 8
Start-up
Loaded run, sewer check, pressure adjustment, operation briefing, leak warranty.
How does stroydom.ge control quality on site?
How we work on site — materials, equipment, tolerances, documentation and acceptance of hidden works.
Materials
Certified Rehau, Uponor, Wirsbo, Wavin, Geberit pipes with 25–50 year warranty.
Hidden joints
Hidden joints: only permanent (soldered or press-fit). Threaded joints in service zones only.
Noise insulation
Sewer riser and horizontal pipes wrapped or replaced with Wavin AS silent pipes.
Leak protection
Optional Aquastop system with leak sensors and automatic shut-off.
Documents
As-built distribution scheme with wall references, pressure test act, equipment passports.
What should be accounted for in Tbilisi and Georgia?
What we account for here: seismic intensity 8 (MSK-64), hot summers and damp winters, steep terrain, older stock with timber floors and worn city networks.
Hard water
In Tbilisi hardness 7–12 °H. Mechanical filter 100 μm + softener; otherwise heaters burn in 2–3 years.
Pressure differences
In old top floors pressure drops to 1.5–2 bar; in new low floors rises to 7–8 bar. Pressure reducer on intake and booster pump if needed.
Old risers
In old stock cast-iron sewer risers have narrowings and deposits. We replace risers with Skolan polypropylene where possible.
Seismic compensation
On long horizontal water runs compensators or P-shaped bypasses to prevent pipe rupture from movement.
Slopes on hillsides
In Vake, Saburtalo, Bagebi external sewer needs precise slope and inspections every 10–12 m.
Penetrations in the concrete
Pipes pass through slabs and load-bearing walls in sleeves that are cast in when the concrete is poured. Later, holes can be drilled and monolithic walls chased only with the designer's approval: in a seismic house the reinforcement is not cut. That is why the penetration points are taken from the drawings in advance.
Routes in the screed
Joints under the screed have no access, so pipes in the floor run in whole lengths, and any unavoidable joints are made permanent and photographed. It is best to keep the pipes under pressure until the screed has set: the gauge needle shows damage to a pipe before a wet patch ever appears.
How much does it cost and how long does it take?
Indicative price ranges in lari (₾) for standard conditions. The final estimate is fixed after measurements and specification approval.
| Item | What is included and the price |
|---|---|
| Water distribution | Cold/hot water with chasing and fittings: 28–42 ₾/m. Manifold cabinet: from 450 ₾. |
| Sewer | D50 — 22–32 ₾/m, D110 with riser — 35–55 ₾/m. |
| Fixtures | Toilet: 180–280 ₾; bathtub with drain: 350–550 ₾; shower: 400–700 ₾; faucet: 80–140 ₾; 80–100 l heater: 250–400 ₾. |
| Pressure test | 6–10 bar for 24 h with act — 250–400 ₾. |
| Turnkey bathroom | 5–6 m² with 4–5 fixtures: 2400–3800 ₾, 4–6 days before tile. |
| Terms | Prices fixed per design and spec. 3-year warranty on hidden joints. |
Updated:
Ready to estimate?
Leave a request — engineer site visit, measurement and a preliminary estimate for "plumbing" are free.

Need the “Plumbing” service?
Leave your phone number: we call back within an hour, clarify the scope and arrange a free site visit.
We will call within an hour, 24/7. You do not need drawings for the first conversation.
By submitting the form you agree to personal data processing. Privacy Policy
Frequently asked questions — Plumbing
Why can threaded joints not be buried in a wall?
Every demountable joint loosens over time: the seal settles and the metal moves with temperature. You cannot tighten it inside a wall, and the leak announces itself as a damp patch in the flat below. So everything that gets covered by plaster and screed is joined permanently (soldered or press-fitted), while demountable joints stay in a manifold cabinet or behind an access hatch.
What is manifold plumbing and why use it?
With a manifold, each fixture has its own pipe from a central manifold with an isolating valve. That gives stable pressure (a tap in the kitchen no longer affects the shower), the ability to isolate one fixture without shutting off the house, and no joints inside walls at all. It costs 20–30% more than a tee layout and pays for itself the first time a repair needs no wall opened.
Is pressure testing mandatory, and what does it show?
It is mandatory. The system is pressurised to 6–10 bar (one and a half to two times working pressure) and held for 24 hours. Any pressure drop means a leak, visible on the gauge long before it becomes a drip. The test is done before the chases are filled and recorded in an act; without that act the routes are not closed.
What is the water like in Tbilisi, and is a filter needed?
Hardness in Tbilisi runs 7–12 °dH: the water is hard. Without treatment, scale destroys a water heater element in 2–3 years, blocks tap aerators and leaves white deposits on fittings and shower glass. We fit a mains mechanical filter and a softener; the payback is roughly one water heater.
Why does the drainage smell?
Three typical causes: insufficient fall (2–3 cm per metre is the norm for 50 mm pipe), a trap siphoned dry because there is no vent pipe, and a dried-out trap in a rarely used floor gully. The first two can only be fixed by rebuilding, so we verify falls and venting during installation and photograph them before covering.
Do drainage pipes need acoustic insulation?
A soil stack in a residential building is a noise source audible in every room next to the duct. Ordinary grey PVC transmits sound directly. We use low-noise pipe with mineral filler or wrap the stack in acoustic insulation. It cannot be done after the finishes, because the duct is already closed.
When are the pipes installed in a house, and when are the toilet and bath fitted?
The pipes are installed before the screed and the tiling, and the fixtures are fitted after the tiling. The pipework is closed with chase filler and screed only after the pressure test and the certificate. So plumbers come to site twice: for the rough-in of the routes, and for fitting the fixtures, start-up and the briefing.
Can plumbing be done before the roof?
Better not. While there is no roof, rain floods the chases and open pipe ends, and testing with water puts extra load on the slabs. Work stops after every downpour, and routes that were already checked have to be checked again. We install the pipework once the building is closed in and the house is dry.
What happens if the screed is poured before the plumbing?
The finished floor has to be opened up. The horizontal routes and outlets lie in or under the screed, and once it is poured any new run or leak means breaking the base and laying a new screed. That is why the screed follows only after the pressure test and the certificate for the concealed sections.
Which is better: plumbing as a standalone order or within the house?
Within the house is better: the outlet levels, falls and tile layout are agreed in advance, and one contractor holds the hand-offs. We also take plumbing as a standalone order, but then we work with what we find: the readiness of the roof, the external services and the screed stays with the client.




