Drain cleaning

All directions

Drain cleaning

stroydom.ge cleans drains in Tbilisi. We clear blockages in flats and private houses: sinks, baths, toilets, kitchen waste pipes and the outlet to the manhole. We use a drain cable or water jetting and inspect the pipe where needed. The price is quoted by phone before the visit, from your description or a photo. We call back within an hour, around the clock. Afterwards we show you the result and explain the cause.

Drain cleaning: locating the blockage, mechanical cleaning with a cable, high-pressure water jetting and pipe inspection. After the job we test the flow and explain what caused the blockage.

You can order this job on its own

We quote the price by phone before the visit: describe the job or send a photo. We call back within an hour, around the clock. We work in Tbilisi.

About the work

How does stroydom.ge deliver drain cleaning?

We clear blockages in flats and houses: sinks, baths, toilets and drain outlets. The price is quoted by phone before the visit.

What is included in drain cleaning?

Locating the blockage

We check where the water stands: in one fixture, in the pipes in the flat or at the house outlet.

Mechanical cleaning

A cable with a cutting head breaks through a plug of grease, hair, paper and small debris.

Water jetting

A jet of water under pressure washes deposits off the pipe walls along the whole run.

Pipe inspection

We look at the condition of the pipe and joints so we can name the cause of the blockage.

What is drain cleaning and why is it needed?

A blockage forms when grease, hair, paper or building debris builds up in the pipe. Water drains slowly, a smell appears, and with a full plug the waste rises into the sink or bath. Older buildings in Tbilisi often have cast iron pipes with scale on the walls, and the bore narrows over time.

Cleaning restores the flow, and an inspection shows why the blockage formed.

What stages does drain cleaning consist of?

Each stage runs only after the previous one is accepted — so hidden works are never "closed" before inspection, and a mistake never has to be hunted for through screed and plaster.

  1. 1

    Call and description

    You tell us where the water stands or send a photo. We quote the price and agree the visit time.

  2. 2

    Inspection on site

    The plumber checks the fixtures and access points, finds the blockage and confirms the price before work starts.

  3. 3

    Preparation

    We cover the floor around the work area and remove the trap or open the access point.

  4. 4

    Cleaning

    We break the plug with a cable and, where deposits are dense, flush the pipe with water under pressure.

  5. 5

    Flow test

    We run water from every fixture on the line and watch how it drains.

  6. 6

    Result and clean-up

    We show you the result, explain the cause of the blockage and tidy the work area.

How does stroydom.ge control quality on site?

How we work on site — materials, equipment, tolerances, documentation and acceptance of hidden works.

Access to the pipe

We work through the trap, an access point or a removed toilet. We do not open the pipe unless it is necessary.

Clean work

We cover the floor and fixtures around the work area and clean up after the job.

Choosing the method

A cable suits a single plug. Jetting is needed when grease and silt line the whole run.

Private houses

In a house we check the outlet and the section up to the inspection manhole.

What should be accounted for in Tbilisi and Georgia?

What we account for here: seismic intensity 8 (MSK-64), hot summers and damp winters, steep terrain, older stock with timber floors and worn city networks.

Grease in the kitchen waste pipe

Grease sets on the pipe walls and catches other debris. This kind of blockage returns if the pipe is not flushed.

Old cast iron pipes

Scale and rust narrow the bore. Cleaning helps, but a worn section will need replacing in time.

Pipe fall

With too little fall or a back fall, water stands in the pipe and blockages repeat. We tell you this right after the inspection.

Replacing parts

If the cause is the trap or a damaged section, we offer to replace it. Plumbing work carries a 3-year warranty.

How much does it cost and how long does it take?

Indicative price ranges in lari (₾) for standard conditions. The final estimate is fixed after measurements and specification approval.

stroydom.ge prices: drain cleaning in Tbilisi, ₾
ItemWhat is included and the price
Where the blockage isA plug in the trap is easier to clear than a blockage in the shared pipework or at the house outlet.
Pipe length and diameterThe longer the section and the larger the diameter, the more time and equipment the job takes.
Cleaning methodJetting needs different equipment from cable work.
How to get the priceWe quote the price by phone before the visit, once you describe the job or send a photo. On site we confirm it before work starts.

Updated:

Ready to estimate?

Leave a request — engineer site visit, measurement and a preliminary estimate for "drain cleaning" are free.

Get a quote

Need the “Drain cleaning” service?

Leave your phone number: we call back within an hour, clarify the job and quote the price before the visit.

We will call within an hour, 24/7. You do not need drawings for the first conversation.

By submitting the form you agree to personal data processing. Privacy Policy

Frequently asked questions — Drain cleaning

How much does drain cleaning cost in Tbilisi?

The price depends on where the blockage is, the length and diameter of the pipe and the cleaning method. We quote it by phone before the visit, from your description or a photo, and confirm it before work starts.

How is mechanical cleaning different from water jetting?

A cable breaks through the plug and restores the flow. A jetting unit washes the pipe walls with water under pressure and removes grease deposits. We choose the method after an inspection on site.

Do you give a warranty after drain cleaning?

Nobody can guarantee that a drain will not block again: it depends on the pipe condition and on what goes down it. After the job we show the result and explain the cause.

Where do you work and when can I call you out?

We work in Tbilisi. We take requests around the clock and call back within an hour. The visit time is agreed by phone.