Cosmetic renovation
stroydom.ge carries out cosmetic renovation in Tbilisi: in apartments as a standalone order from 1,000 ₾, or as part of a house project. Wall prep and two-coat painting cost 14–22 ₾/m², ceilings 12–18 ₾/m², with local putty 18–28 ₾/m². Non-woven wallpaper is 12–18 ₾/m², vinyl 14–22 ₾/m². Laminate with underlay is 12–20 ₾/m², linoleum 8–14 ₾/m², PVC skirting 10–16 ₾/m. A whole flat costs 2200–3800 ₾ for a 1-bed 35 m², 3500–6000 ₾ for a 2-bed 55 m² and 5000–8500 ₾ for a 3-bed 75 m², materials not included. Advance no more than 15%, one-year warranty.
Cosmetic renovation of an apartment or house: wall prep, painting, wallpaper, laminate and skirting replacement, ceiling and reveal refresh without engineering replacement.
You can order this job on its own
Orders start from 1,000 ₾. An engineer visits and measures free of charge, and we fix the estimate and schedule before work starts. We work in Tbilisi.
About the work
How does stroydom.ge deliver cosmetic renovation?
Painting, wallpaper, flooring and ceilings without major demolition, in 2–4 weeks, in an apartment or in a new house.
What is included in cosmetic renovation?
What is cosmetic renovation and why is it needed?
Cosmetic renovation is updating an apartment without opening the screed, replacing wiring and plumbing. The task is to bring a fresh look in minimum time and budget: repaint walls, change wallpaper, refresh the ceiling, replace flooring and skirting. We do this where engineering and walls are fine, but the finish is tired.
What stages does cosmetic renovation consist of?
Each stage runs only after the previous one is accepted — so hidden works are never "closed" before inspection, and a mistake never has to be hunted for through screed and plaster.
- 1
Inspection and quote
Free visit, area measurement, defect record, scope and material approval. Fixed estimate.
- 2
Protection and preparation
Cover furniture and floors with film, remove textiles, tape sockets.
- 3
Old finish removal
Remove old wallpaper, peeling paint, putty, skirting and old floor covering.
- 4
Wall preparation
Local putty for cracks, sanding, deep penetration primer 1–2 layers.
- 5
Wall finishing
Roller painting 2 layers or seam wallpaper. Side light control at each stage.
- 6
Ceilings and reveals
Emulsion ceiling paint, window/door reveal refresh, new skirting.
- 7
Floor
New laminate with underlay or linoleum, perimeter skirting, transition strips.
- 8
Cleaning
Final vacuum and wet cleaning, film removal, quality check and a signed handover certificate.
How does stroydom.ge control quality on site?
How we work on site — materials, equipment, tolerances, documentation and acceptance of hidden works.
Zoned work
We split the apartment into 2–3 zones and work in turn so the client can live there.
Surface protection
Dense film on furniture and floors, masking tape on skirting, cardboard in pass-through zones.
Daily cleaning
End-of-shift dust and waste cleaning, which is critical if residents stay.
Material control
We use Tikkurila, Caparol, Dulux paints and wallpapers from 120 g/m², because cheap materials lay badly.
Tight timing
1-bed: 7–10 days; 2-bed: 12–18 days; 3-bed: 18–25 days. Locked by contract.
What should be accounted for in Tbilisi and Georgia?
What we account for here: seismic intensity 8 (MSK-64), hot summers and damp winters, steep terrain, older stock with timber floors and worn city networks.
Old wallpaper in layers
In old fund often 3–4 layers. We remove all to plaster, otherwise the new wallpaper falls off.
Hidden cracks
After wallpaper removal cracks appear that were masked. We locally reinforce with mesh tape and putty.
Tbilisi humidity
Spring humidity 75–85%. In bathrooms and kitchens we use biocidal paints (Tikkurila Luja).
Old skirting
Wooden skirting in Soviet apartments is often rotten. We replace with plastic or MDF.
Curved walls
Cosmetic does not flatten walls. If offset >1 cm per 2 m we suggest GKL or plaster leveling.
How much does it cost and how long does it take?
Indicative price ranges in lari (₾) for standard conditions. The final estimate is fixed after measurements and specification approval.
| Item | What is included and the price |
|---|---|
| Wall painting | Prep and 2-coat painting: 14–22 ₾/m² (no paint cost). With local putty: +6–10 ₾/m². |
| Wallpaper | Non-woven: 12–18 ₾/m²; vinyl on non-woven: 14–22 ₾/m². |
| Ceilings | 2-coat ceiling paint: 12–18 ₾/m², or 18–28 ₾/m² with local putty. |
| Floors and skirting | Laminate with underlay: 12–20 ₾/m²; linoleum: 8–14 ₾/m²; PVC skirting: 10–16 ₾/m. |
| Whole apartment | 1-bed 35 m²: 2200–3800 ₾; 2-bed 55 m²: 3500–6000 ₾; 3-bed 75 m²: 5000–8500 ₾ (no materials). |
| Terms | Prices fixed by scope. Advance no more than 15%, the rest after acceptance. 1-year warranty. |
Updated:
Ready to estimate?
Leave a request — engineer site visit, measurement and a preliminary estimate for "cosmetic renovation" are free.

Need the “Cosmetic renovation” service?
Leave your phone number: we call back within an hour, clarify the scope and arrange a free site visit.
We will call within an hour, 24/7. You do not need drawings for the first conversation.
By submitting the form you agree to personal data processing. Privacy Policy