Apartment Renovation Costs in Tbilisi in 2026

All articles

Apartment Renovation Costs in Tbilisi in 2026

stroydom.ge

Updated:

The cost of an apartment renovation in Tbilisi comes down to three things: the condition of the property, the level of finishing, and whether you do the work piece by piece or as a full turnkey cycle. Below are the 2026 benchmarks and what goes into the final estimate.

Renovation types and price ranges

  • Cosmetic: from ₾150/m². Painting and refreshing walls and floors without touching the engineering systems.
  • Major, “ready for finishing”: from ₾350/m². Replacing the screed, plaster, wiring and plumbing.
  • Full turnkey cycle: from ₾500/m². From demolition to final finishing, with materials and a design project.

Prices are approximate and depend on the area, the geometry of the space and the materials chosen. The exact figure emerges after an engineer visits and takes measurements.

What makes up the estimate

  • Rough works: screed, plaster, routing of wiring and plumbing.
  • Finishing: tiling, painting, floor coverings, door installation.
  • Engineering: heating, water supply, ventilation, low-voltage networks.
  • Materials and logistics: delivery and hauling up to the floor.

Where you shouldn’t cut corners

Waterproofing of wet areas, wiring and screed are the things hidden beneath the finish. Redoing this work costs many times more than doing it right the first time. Ask for a fixed estimate and a contract with a warranty: that protects you from “extra charges along the way”.

Need an estimate for your project?

Send a request — we will prepare an estimate and answer your questions.

Send request

Planning to build a house?

Start with a free consultation about your plot, floor area and budget. If you are still looking for land, tell us about a plot you are considering.

We will call within an hour, 24/7. You do not need drawings for the first conversation.

By submitting the form you agree to personal data processing. Privacy Policy