Turnkey house construction in Batumi

Construction in Batumi & Adjara

Turnkey house construction in Batumi

stroydom.ge builds houses in Batumi at company base rates: 500–700 ₾/m² for the shell, 850–1,100 ₾/m² ready for finishing and 1,250–1,550 ₾/m² for the full cycle. These are reference figures; the estimate for a plot in Batumi is calculated after an engineer visits it and is fixed in the contract. Sea air in Batumi speeds up corrosion, so the work includes anti-corrosion protection, reinforced waterproofing and ventilated facades. The company has worked since 2014, delivered over 50 projects and builds houses from 150 m². The advance is capped at 15 %, payment goes stage by stage, and the warranty runs up to 10 years.

We build houses in Batumi, Kobuleti, Gonio and across Adjara with a single contractor: from geology and design to engineering and final finishing. For living or for short-term rental, with a fixed estimate and a warranty of up to 10 years.

What does stroydom.ge account for when building in Batumi?

Sea humidity and salt

Sea air accelerates corrosion and mould. We build in anti-corrosion treatment of rebar and metal, reinforced waterproofing, ventilated facades and antiseptic protection so the finish lasts.

Seismicity and terrain

Adjara is a seismic region with slopes. We design monolithic structures and foundations for the calculated load, adding retaining walls and drainage on sloped plots where needed.

Resort season and logistics

We schedule stages so noisy work avoids peak season and a rental unit is delivered before it starts, keeping a buffer for weather and equipment delivery.

Rental-ready properties

We build and finish apartments and guest houses to a booking-ready standard: durable materials and plumbing and wiring designed for guest turnover.

What work does stroydom.ge do in Batumi?

Full turnkey cycle, with responsibility for the estimate and deadlines.

stroydom.ge base rates per m², ₾ (reference for Batumi)
StagePrice, ₾/m²What is included
Shell500–700Foundation, concrete structure, masonry and roof — no windows, no engineering, no finishes. Chosen when the finish is planned later or done in-house.
Ready for finishing850–1,100Shell plus the full engineering and rough-works package. The house can be mothballed for any length of time and finished once the interior design is ready.
Full cycle1,250–1,550From foundation to the handover of keys: engineering, finishing, final materials and cleaning. The most predictable option on timing — there is no downtime between contractors.

The rates cover standard conditions. For a site in Batumi stroydom.ge prepares the estimate after an engineer visits the plot and fixes it in the contract.

Updated:

  • Turnkey construction of private houses and cottages
  • Monolithic and foundation works, retaining walls
  • Roofing, facade and waterproofing for the seaside climate
  • Final finishing of the house, turnkey
  • Engineering: electrics, plumbing, heating and air conditioning
  • Guest houses for rental, finished to a booking-ready standard

FAQ — Batumi

Do you build turnkey houses in Batumi and across Adjara?

Yes, our construction company in Batumi handles the full cycle: design, foundation, monolithic or pumice-block frame, roofing, engineering and turnkey finishing. We work throughout Adjara: Batumi, Kobuleti, Chakvi, Makhinjauri. We hand over the property ready to move in, with a workmanship warranty of up to 10 years.

How much does building a house in Batumi cost per square metre?

The price per square metre in Batumi depends on the number of floors, frame type and finishing level. As a reference, the company base rates are 500–700 ₾/m² for the shell, 850–1,100 ₾/m² ready for finishing and 1,250–1,550 ₾/m² for the full cycle. We provide an exact estimate after a site visit and the design, fixing the cost in the contract with no hidden extras.

Do you renovate apartments and turnkey seaside flats in Batumi?

No. We do not take on apartment or flat renovation, including as part of a project: it is not part of a house project. In Batumi and across Adjara we build houses and guest houses turnkey, and screed, plaster, electrics, plumbing and final finishing are stages of that build. Timelines and the estimate are fixed in the contract.

Do you build commercial property and apart-complexes?

Yes, besides private houses we build commercial property and apartments in Batumi: mini-hotels, guesthouses, retail and office spaces. We factor in the requirements of seaside investment property: rental-oriented layouts, engineering rated for load, and finishing to a commercial standard. We manage the project from design through to commissioning.

How do you account for Adjara's humid coastal climate?

Batumi's humid coastal climate demands specific solutions: reinforced waterproofing of the foundation and roof, ventilated facades, anti-corrosion protection of metal, quality vapour barriers and well-planned ventilation against mould. We select materials resistant to salt and moisture so the house lasts for decades without damp or fungus.

What warranty do you give on the finished house?

We provide a workmanship warranty of up to 10 years depending on the type of structure and finishing. The warranty is fixed in the contract, covering the monolithic frame, roofing, waterproofing and engineering systems. In a warranty case we come out and fix defects at our own cost, which is critically important in the humid climate of Batumi and Adjara.

Can I monitor the construction remotely from abroad?

Yes, for foreign clients and investors we have set up remote construction monitoring in Batumi: regular photo and video reports, stage-by-stage updates, online video calls and a transparent estimate. You see the progress and how funds are spent without being in Georgia, and approve major decisions remotely at a convenient time.

How is the estimate prepared and are there hidden extra charges?

The estimate is drawn up in detail after the design and measurements: materials, works, engineering and timelines are listed line by line. The cost is fixed in the contract, and payment follows the stages for the actually completed volume. There are no hidden extras: any client-requested changes are agreed separately and formalised by an addendum before work begins.

How long does it realistically take to build a turnkey house in Batumi?

The timeline depends on the area and structure type. The house shell is usually built within a few months, while the full cycle with turnkey finishing takes longer depending on project complexity. We set exact deadlines in the contract with stages and dates, keep to the schedule, and pay crews and suppliers without delays.

Do you work with foreigners who do not speak Russian?

Yes, we work with foreign clients and investors: we communicate in Russian and English, explaining the stages, estimate and contract in clear language. We help you understand local building regulations and the features of Adjara's coastal climate, and accompany the deal and construction from design to handover of the keys.

Do you help with the design and building permits in Adjara?

Yes, we take on the design and handling of permit documentation for construction in Batumi and Adjara. We prepare the architectural and structural design for coastal conditions, coordinate the regulations and help arrange the necessary paperwork so the house is built legally and without risks for future resale or rental.

Can I order only apartment finishing without construction?

No. We do not do apartment or flat finishing, either on its own or as part of a project. Levelling, electrics, plumbing, floors, tiling and final finishing are stages of building a house for us, and the contract gives a 2-year warranty on finishes.

Planning to build a house?

Start with a free consultation about your plot, floor area and budget. If you are still looking for land, tell us about a plot you are considering.

We will call within an hour, 24/7. You do not need drawings for the first conversation.

By submitting the form you agree to personal data processing. Privacy Policy