Turnkey house construction in Telavi

Construction in Telavi & Kakheti

Turnkey house construction in Telavi

stroydom.ge builds houses in Telavi at company base rates: 500–700 ₾/m² for the shell, 850–1,100 ₾/m² ready for finishing and 1,250–1,550 ₾/m² for the full cycle. These are reference figures; the estimate for a plot in Telavi is calculated after an engineer visits it and is fixed in the contract. Kakheti has hot summers and cold winters, and a marani needs a steady +13…+15 °C. Both go into the design. The company has worked since 2014, delivered over 50 projects and builds houses from 150 m².

We build houses, guest houses and wine cellars in Telavi and across Kakheti with a single contractor: from geology and design to engineering and final finishing. We account for the region’s wine tourism and build marani with the right microclimate and properties ready to host guests.

What does stroydom.ge account for when building in Telavi?

Wine cellars (marani)

We build marani and qvevri stores with a stable microclimate: well-planned waterproofing, ventilation and a steady temperature of around +13…+15 °C all year round.

Guest and wine tourism

We finish guest houses and family wineries to host visitors: durable materials, engineering for footfall and a warm contour for year-round rental.

Continental climate

Kakheti has hot summers and cold winters. We build in insulation and heating for the temperature swings so the house is comfortable all year.

Plots and terrain

Before the foundation we run geology: on slopes and vineyards we choose the foundation type, drainage and retaining walls by calculation.

What work does stroydom.ge do in Telavi?

Full turnkey cycle, with responsibility for the estimate and deadlines.

stroydom.ge base rates per m², ₾ (reference for Telavi)
StagePrice, ₾/m²What is included
Shell500–700Foundation, concrete structure, masonry and roof — no windows, no engineering, no finishes. Chosen when the finish is planned later or done in-house.
Ready for finishing850–1,100Shell plus the full engineering and rough-works package. The house can be mothballed for any length of time and finished once the interior design is ready.
Full cycle1,250–1,550From foundation to the handover of keys: engineering, finishing, final materials and cleaning. The most predictable option on timing — there is no downtime between contractors.

The rates cover standard conditions. For a site in Telavi stroydom.ge prepares the estimate after an engineer visits the plot and fixes it in the contract.

Updated:

  • Turnkey construction of private houses and cottages
  • Wine cellars (marani) and qvevri stores
  • Guest houses and family wineries
  • Roofing, facade and waterproofing of the house
  • Engineering: electrics, plumbing, heating
  • Final finishing for rental and wine tourism

FAQ — Telavi

Do you build turnkey houses in Telavi and Kakheti?

Yes, our construction company handles the full cycle in Telavi: design, foundation, monolith or pumice block, roofing, engineering and turnkey finishing. We work throughout Kakheti: Telavi, Signagi, Kvareli, Gurjaani. We hand over the property ready to move in, with a workmanship warranty of up to 10 years.

Do you build wine cellars and marani?

Yes, this is one of our specialities in Kakheti. We build marani and qvevri stores with a stable microclimate: reinforced waterproofing, ventilation and a steady temperature of around +13…+15 °C all year. We account for wine-storage requirements so the cellar works for decades without damp or temperature swings.

Do you build guest houses and family wineries?

Yes, we finish and build guest houses and family wineries in Telavi to host guests. We do durable finishing, engineering for visitor footfall and a warm contour for year-round rental. We prepare the property for wine tourism, from the tasting hall to the guest rooms.

How much does building a house in Telavi cost per square metre?

The price per square metre in Telavi depends on the shell type, number of floors and finishing level. Aerated block is usually cheaper than a monolith, and finishing is quoted separately. We give an exact estimate after a site visit and the design and fix it in the contract with no hidden extras.

How do you account for the Kakheti climate?

Kakheti has hot summers and cold winters, so we build in quality insulation and heating for the temperature swings. For marani and cellars we separately design ventilation and waterproofing for a stable microclimate. We select materials to suit the region’s continental climate.

Can I monitor the construction remotely?

Yes, for owners outside Georgia we have set up remote control: regular photo and video reports by stage, online reconciliation against the estimate and contact with the site manager. You see the progress in Telavi in real time and approve major decisions remotely.

Planning to build a house?

Start with a free consultation about your plot, floor area and budget. If you are still looking for land, tell us about a plot you are considering.

We will call within an hour, 24/7. You do not need drawings for the first conversation.

By submitting the form you agree to personal data processing. Privacy Policy