
Construction in Mtskheta & Mtskheta-Mtianeti
Turnkey house construction in Mtskheta
stroydom.ge builds houses in Mtskheta at company base rates: 500–700 ₾/m² for the shell, 850–1,100 ₾/m² ready for finishing and 1,250–1,550 ₾/m² for the full cycle. These are reference figures; the estimate for a plot in Mtskheta is calculated after an engineer visits it and is fixed in the contract. Mtskheta is a UNESCO-protected town: approvals plus height and facade limits apply, and plots near the river junction often slope. The company has worked since 2014, delivered over 50 projects and builds houses from 150 m².
We build houses in Mtskheta and the surrounding area with a single contractor: design, approvals, foundation, shell, engineering and final finishing. Mtskheta is a UNESCO-protected historic capital and a popular spot for country houses near Tbilisi, so we work carefully with approvals and architecture.
What does stroydom.ge account for when building in Mtskheta?
Heritage zones and UNESCO
Historic development requires approvals and a careful approach. We prepare documentation and respect the limits on height, facades and materials in the protected zone.
Country houses near Tbilisi
Mtskheta is 20 minutes from the capital. We build cottages and homes for permanent living out of town with fast delivery of crews and materials from Tbilisi.
Restoration and facades
We carefully restore historic houses and facades: preserving the look, strengthening the structure and bringing modern engineering inside.
Terrain and views
Plots are often on slopes near the confluence of rivers. We run geology, drainage and retaining walls, and design the house for panoramic views and sunlight.
What work does stroydom.ge do in Mtskheta?
Full turnkey cycle, with responsibility for the estimate and deadlines.
| Stage | Price, ₾/m² | What is included |
|---|---|---|
| Shell | 500–700 | Foundation, concrete structure, masonry and roof — no windows, no engineering, no finishes. Chosen when the finish is planned later or done in-house. |
| Ready for finishing | 850–1,100 | Shell plus the full engineering and rough-works package. The house can be mothballed for any length of time and finished once the interior design is ready. |
| Full cycle | 1,250–1,550 | From foundation to the handover of keys: engineering, finishing, final materials and cleaning. The most predictable option on timing — there is no downtime between contractors. |
The rates cover standard conditions. For a site in Mtskheta stroydom.ge prepares the estimate after an engineer visits the plot and fixes it in the contract.
Updated:
- Turnkey construction of private houses and cottages
- Restoration of historic houses and facades
- Foundation and monolithic works, retaining walls
- Roofing, facade and final finishing of the house
- Engineering: electrics, plumbing, heating
- Design and approvals support
FAQ — Mtskheta
Do you build turnkey houses in Mtskheta?
Yes, our construction company handles the full cycle in Mtskheta: design, approvals, foundation, monolith or pumice block, roofing, engineering and turnkey finishing. We work across Mtskheta-Mtianeti and near Tbilisi. We account for heritage-zone requirements and hand over with a workmanship warranty of up to 10 years.
How do you work with heritage zones and approvals?
Mtskheta is a UNESCO-protected historic town, so the protected zone has limits on height, facades and materials. We prepare the design and permit documentation, coordinate the regulations and build legally, so there are no risks for future use or sale.
Do you restore historic houses?
Yes, we carefully restore historic houses and facades in Mtskheta: preserving the look and authentic elements, strengthening the structure and bringing modern engineering inside (electrics, heating, plumbing). We combine a historic exterior with comfort inside.
How much does building a house in Mtskheta cost per square metre?
The price per square metre in Mtskheta depends on the shell type, floors, finishing level and heritage-zone requirements. We give an exact estimate after geology, design and approvals and fix it in the contract with no hidden extras. Proximity to Tbilisi helps keep logistics and cost down.
Is it convenient to build a country house in Mtskheta near Tbilisi?
Yes, Mtskheta is 20 minutes from Tbilisi, so it is a popular spot for country houses. Crews, equipment and materials arrive fast from our base, and you get an out-of-town home with panoramic views and quick access to the capital.
Can I monitor the construction remotely?
Yes, for owners outside Georgia we have set up remote control: regular photo and video reports by stage, online reconciliation against the estimate and contact with the site manager. You see the progress in Mtskheta in real time and approve major decisions remotely.

Planning to build a house?
Start with a free consultation about your plot, floor area and budget. If you are still looking for land, tell us about a plot you are considering.
We will call within an hour, 24/7. You do not need drawings for the first conversation.
By submitting the form you agree to personal data processing. Privacy Policy
