
Construction in Chakvi
Turnkey house construction in Chakvi
stroydom.ge builds houses in Chakvi at company base rates: 500–700 ₾/m² for the shell, 850–1,100 ₾/m² ready for finishing and 1,250–1,550 ₾/m² for the full cycle. These are reference figures; the estimate for a plot in Chakvi is calculated after an engineer visits it and is fixed in the contract. Chakvi is one of the wettest spots on the coast, so waterproofing, ventilation and slope checks come before design.
Chakvi is a village between Batumi and Kobuleti, known for its historic tea plantations and its neighbour, the Batumi Botanical Garden. The beach and the foothills are both close by, and the climate is among the wettest on the coast. The village is also known for the waves that draw surfers, which keeps demand for guest houses steady. We build turnkey here with a design that accounts for constant humidity and a foothill terrain that is not always flat.
What does stroydom.ge account for when building in Chakvi?
Humid subtropical climate
Chakvi gets some of the highest rainfall on the Georgian coast. We build in reinforced foundation and roof waterproofing, proper ventilation and site drainage. Without it, dampness and flooding during the rainy season are close to guaranteed.
Foothills and uneven terrain
Unlike the flat coastline, part of the village sits on the hilly approach to the mountains, on former tea plantation land. Before laying a foundation we check the slope and soil composition of the specific plot. A one-size-fits-all scheme does not work here.
Seasonal tourism and surfers
Chakvi's waves draw surfers and windsurfers for most of the year, which fuels demand for rental housing by the sea. We design houses with rental in mind: separate entrances, easy turnover cleaning, and storage space for gear.
What work does stroydom.ge do in Chakvi?
Full cycle or a single stage, turnkey and with accountability for budget and schedule.
| Stage | Price, ₾/m² | What is included |
|---|---|---|
| Shell | 500–700 | Foundation, concrete structure, masonry and roof — no windows, no engineering, no finishes. Chosen when the finish is planned later or done in-house. |
| Ready for finishing | 850–1,100 | Shell plus the full engineering and rough-works package. The house can be mothballed for any length of time and finished once the interior design is ready. |
| Full cycle | 1,250–1,550 | From foundation to the handover of keys: engineering, finishing, final materials and cleaning. The most predictable option on timing — there is no downtime between contractors. |
The rates cover standard conditions. For a site in Chakvi stroydom.ge prepares the estimate after an engineer visits the plot and fixes it in the contract.
Updated:
- Private and guest house construction by the sea and in the foothills
- Geotechnical survey, drainage and foundation for a humid plot
- Concrete-frame construction with reinforced waterproofing
- MEP: electrical, plumbing, heating and air conditioning
- Finishing with facade materials suited to the humid climate
- Remote construction monitoring for owners abroad
FAQ — Chakvi
Do you build turnkey houses in Chakvi?
Yes, we run the full cycle in Chakvi: geotechnical survey, drainage, foundation, the concrete frame, MEP and finishing, turnkey. We account for the higher humidity and the uneven foothill terrain. We hand the property over ready to move into or rent out, with a warranty on works up to 10 years.
Why does waterproofing matter more in Chakvi than elsewhere on the coast?
Chakvi gets some of the highest rainfall on the Georgian coast. Without reinforced foundation and roof waterproofing, plus proper site drainage, dampness and flooding during the rainy season are close to unavoidable.
Can I build away from the beach, on the hill toward the plantations?
Yes, part of Chakvi sits on the foothills, on former tea plantation land. Such plots often have a slope and different soil than the flat land by the sea, so we always run a geotechnical survey for the specific spot rather than use a standard scheme.
Is it worth building a guest house for rental in Chakvi?
Yes, demand is steady thanks to the waves that draw surfers nearly year-round and the proximity to the Botanical Garden. We design guest houses with rental in mind: separate entrances, easy turnover between guests, and storage space for gear.
Can I monitor the construction remotely from abroad?
Yes, for owners outside Georgia we have set up remote monitoring: regular photo and video reports by stage, estimate reconciliation and contact with the site manager. You see progress in Chakvi in real time and approve decisions remotely, whenever it suits you.

Planning to build a house?
Start with a free consultation about your plot, floor area and budget. If you are still looking for land, tell us about a plot you are considering.
We will call within an hour, 24/7. You do not need drawings for the first conversation.
By submitting the form you agree to personal data processing. Privacy Policy
