
Construction in Martkopi
House construction in Martkopi, turnkey
stroydom.ge builds houses in Martkopi at company base rates: 500–700 ₾/m² for the shell, 850–1,100 ₾/m² ready for finishing and 1,250–1,550 ₾/m² for the full cycle. These are reference figures; the estimate for a plot in Martkopi is calculated after an engineer visits it and is fixed in the contract. Martkopi plots are large and flat, so structure costs less than on a slope, but water and power access are checked before the estimate. The company has worked since 2014, delivered over 50 projects and builds houses from 150 m².
Martkopi in the Gardabani district is the choice for those who need a large plot for reasonable money and are willing to drive a bit further from central Tbilisi. Flat terrain, spacious plots and more affordable land than in closer suburbs. We build here turnkey, from design to finishing.
What does stroydom.ge account for when building in Martkopi?
Spacious plots and a master plan
Plots in Martkopi are on average larger than in closer suburbs. This lets us plan not just the house but outbuildings, a garage and a recreation area as a single site master plan, instead of adding them later.
Flat terrain, a standard foundation
The terrain is mostly flat, without complex gradients, so foundation works cost less than in hilly suburbs. We still always run geology for the specific soil.
Distance from the city and utility connections
The plot is further from the centre, so we check the availability of electricity, water and access roads specifically on your plot in advance, so the estimate doesn't balloon from running utilities a long distance.
What work does stroydom.ge do in Martkopi?
Full cycle or a single stage, turnkey and with accountability for the budget and schedule.
| Stage | Price, ₾/m² | What is included |
|---|---|---|
| Shell | 500–700 | Foundation, concrete structure, masonry and roof — no windows, no engineering, no finishes. Chosen when the finish is planned later or done in-house. |
| Ready for finishing | 850–1,100 | Shell plus the full engineering and rough-works package. The house can be mothballed for any length of time and finished once the interior design is ready. |
| Full cycle | 1,250–1,550 | From foundation to the handover of keys: engineering, finishing, final materials and cleaning. The most predictable option on timing — there is no downtime between contractors. |
The rates cover standard conditions. For a site in Martkopi stroydom.ge prepares the estimate after an engineer visits the plot and fixes it in the contract.
Updated:
- Turnkey private house construction on spacious plots
- A single site master plan: house, outbuildings, fencing
- Geology, foundation, monolithic and frame works
- Engineering: electrical, plumbing, off-grid systems where needed
- Rough-in and finishing works
- Remote construction monitoring for owners abroad
FAQ — Martkopi
Do you build turnkey houses in Martkopi?
Yes, in Martkopi and the Gardabani district we run the full cycle: design, geology, foundation, shell, roof, engineering and turnkey finishing. We work with spacious plots and plan the whole site master plan, not just the house. The warranty on the works is up to 10 years.
Is it cheaper to build in Martkopi than closer to Tbilisi?
Land in Martkopi is usually more affordable than in closer suburbs, and the flat terrain simplifies foundation works. However the cost of the house itself (materials, shell, finishing) depends on the design, not the distance from the city. The savings are mainly on land and logistics.
How much does building a house in Martkopi cost per square metre?
The price per square metre in Martkopi comes from the foundation type, floors, finishing and how far the specific plot is from utility networks. Flat terrain usually reduces structural costs. We give an exact estimate after a site visit and design.
Does the plot have electricity, water and road access?
This is the first thing we check before the design: utility availability and access road condition vary significantly even between neighbouring Martkopi plots. If networks are far, we build the cost of connection or off-grid systems into the estimate in advance.
Can you design not just the house but outbuildings on the plot too?
Yes, with spacious Martkopi plots it makes sense to do this from the start: a single master plan with the house, garage, outbuilding and recreation area. This avoids a situation where later additions conflict with already-built utilities and fencing.
Can I monitor the construction remotely?
Yes, for owners abroad we have set up remote monitoring: regular photo and video reports by stage, estimate reconciliation, contact with the site manager. You see progress in Martkopi in real time and approve decisions remotely.

Planning to build a house?
Start with a free consultation about your plot, floor area and budget. If you are still looking for land, tell us about a plot you are considering.
We will call within an hour, 24/7. You do not need drawings for the first conversation.
By submitting the form you agree to personal data processing. Privacy Policy
