Turnkey house construction in Poti

Construction in Poti & Samegrelo

Turnkey house construction in Poti

stroydom.ge builds houses in Poti at company base rates: 500–700 ₾/m² for the shell, 850–1,100 ₾/m² ready for finishing and 1,250–1,550 ₾/m² for the full cycle. These are reference figures; the estimate for a plot in Poti is calculated after an engineer visits it and is fixed in the contract. Poti stands in a river delta by the sea: high water calls for drainage and the right foundation, salt air for anti-corrosion protection. The company has worked since 2014, delivered over 50 projects and builds houses from 150 m².

We build houses and industrial facilities in Poti with a single contractor: design, foundation, monolith, steel structures, engineering and finishing. Poti is a Black Sea port city, so we build in reinforced protection against salt, humidity and high water.

What does stroydom.ge account for when building in Poti?

Sea salt and corrosion

Port air is aggressive to metal. We apply anti-corrosion treatment to rebar and steel structures, protective coatings and reinforced waterproofing.

Industrial and port zone

We build workshops, warehouses and facilities near the port: steel structures to design, welding, sandwich panels and floors rated for industrial load.

High water and drainage

The city sits in a river delta by the sea, so groundwater is high. Before the foundation we run geology and build in drainage and the right foundation type.

Humidity and ventilation

High humidity calls for well-planned ventilation and vapour barriers so the house has no damp, condensation or mould.

What work does stroydom.ge do in Poti?

Full turnkey cycle, with responsibility for the estimate and deadlines.

stroydom.ge base rates per m², ₾ (reference for Poti)
StagePrice, ₾/m²What is included
Shell500–700Foundation, concrete structure, masonry and roof — no windows, no engineering, no finishes. Chosen when the finish is planned later or done in-house.
Ready for finishing850–1,100Shell plus the full engineering and rough-works package. The house can be mothballed for any length of time and finished once the interior design is ready.
Full cycle1,250–1,550From foundation to the handover of keys: engineering, finishing, final materials and cleaning. The most predictable option on timing — there is no downtime between contractors.

The rates cover standard conditions. For a site in Poti stroydom.ge prepares the estimate after an engineer visits the plot and fixes it in the contract.

Updated:

  • Turnkey construction of private houses and cottages
  • Steel structures, workshops and warehouses near the port
  • Anti-corrosion protection and waterproofing
  • Foundation and monolithic works, drainage
  • Roofing, facade and final finishing of the house
  • Engineering: electrics, plumbing, heating

FAQ — Poti

Do you build turnkey houses in Poti?

Yes, our construction company handles the full cycle in Poti: design, foundation, monolith or pumice block, roofing, engineering and turnkey finishing. We work across Poti and Samegrelo. We account for sea salt, humidity and high water and hand over with a workmanship warranty of up to 10 years.

Do you make steel structures and industrial facilities near the port?

Yes, this is one of our specialities in Poti. We build workshops, warehouses and hangars near the port: steel structures to design with welding, anti-corrosion treatment, protective coatings, sandwich panels and floors rated for industrial load. We manage the project from design to commissioning.

How do you protect structures from sea salt and corrosion?

Poti's port air is aggressive to metal, so we apply anti-corrosion treatment to rebar and steel structures, protective coatings and reinforced waterproofing. We choose materials resistant to salt and moisture, which is essential for the durability of houses and seaside industrial facilities.

How much does building a house in Poti cost per square metre?

The price per square metre in Poti depends on the shell type, number of floors and finishing level, as well as the amount of anti-corrosion protection and waterproofing. We give an exact estimate after geology, design and a site visit and fix it in the contract with no hidden extras.

How do you handle high water in Poti?

Poti sits in a river delta by the sea, so groundwater is high. Before the foundation we run geology and build in drainage, the right foundation type and reinforced waterproofing to avoid flooding and settlement. All of this is fixed in the design and estimate before the start.

Can I monitor the construction remotely?

Yes, for clients outside Georgia we have set up remote control: regular photo and video reports by stage, online reconciliation against the estimate and contact with the site manager. You see the progress in Poti in real time and approve major decisions remotely.

Planning to build a house?

Start with a free consultation about your plot, floor area and budget. If you are still looking for land, tell us about a plot you are considering.

We will call within an hour, 24/7. You do not need drawings for the first conversation.

By submitting the form you agree to personal data processing. Privacy Policy