House construction in Digomi, turnkey

Construction in Digomi

House construction in Digomi, turnkey

stroydom.ge builds houses in Digomi at company base rates: 500–700 ₾/m² for the shell, 850–1,100 ₾/m² ready for finishing and 1,250–1,550 ₾/m² for the full cycle. These are reference figures; the estimate for a plot in Digomi is calculated after an engineer visits it and is fixed in the contract. Digomi is mostly flat, so foundation work usually costs less than on a slope, though geology is still done before design. The company has worked since 2014, delivered over 50 projects and builds houses from 150 m². The advance is capped at 15 %, payment goes stage by stage, and the warranty runs up to 10 years.

Digomi is a large district in northwest Tbilisi with flat terrain and developed infrastructure: wide roads, shops and schools nearby. A Tbilisi district where access and relatively flat terrain can simplify planning a private house. We build here turnkey, from design to finishing.

Our own project: plan your house in 3D

What does stroydom.ge account for when building in Digomi?

Flat plots and a standard foundation

Unlike Tskneti or Kojori, Digomi's terrain is mostly flat, which simplifies and reduces the cost of foundation works. We still always run geology: soil near the river differs from soil further away.

Denser development and neighbours

Plots in Digomi are often more densely spaced than on steeper Tbilisi plots. We agree the house placement on the plot in advance, accounting for setbacks and boundaries, to avoid disputes with neighbours after handover.

Easy access and logistics

Wide roads make delivering concrete, equipment and materials easier, which speeds up monolithic stages compared with Tbilisi plots with a level difference.

What work does stroydom.ge do in Digomi?

Full cycle or a single stage, turnkey and with accountability for the budget and schedule.

stroydom.ge base rates per m², ₾ (reference for Digomi)
StagePrice, ₾/m²What is included
Shell500–700Foundation, concrete structure, masonry and roof — no windows, no engineering, no finishes. Chosen when the finish is planned later or done in-house.
Ready for finishing850–1,100Shell plus the full engineering and rough-works package. The house can be mothballed for any length of time and finished once the interior design is ready.
Full cycle1,250–1,550From foundation to the handover of keys: engineering, finishing, final materials and cleaning. The most predictable option on timing — there is no downtime between contractors.

The rates cover standard conditions. For a site in Digomi stroydom.ge prepares the estimate after an engineer visits the plot and fixes it in the contract.

Updated:

  • Turnkey private house and cottage construction
  • Geology, foundation, monolithic works
  • Frame and capital structures
  • Engineering: electrical, plumbing, heating and air conditioning
  • Rough-in and finishing works
  • Landscaping, fencing and an access road

FAQ — Digomi

Do you build turnkey houses in Digomi?

Yes, in Digomi we run the full cycle: design, geology, foundation, monolithic or frame structure, roof, engineering and turnkey finishing. The district's flat terrain and easy access speed up monolithic stages. We hand over the house move-in ready, with up to a 10-year warranty on the works.

Is it cheaper to build in Digomi than on Tbilisi plots with a level difference?

Generally yes: flat terrain doesn't require expensive retaining structures or complex slope geology, and easy access reduces equipment logistics costs. The final estimate is still calculated for the specific plot and design.

How much does building a house in Digomi cost per square metre?

The price per square metre in Digomi depends on foundation type, floors and finishing level. Thanks to the flat terrain and good access, the structural portion usually costs less than on a slope. We give an exact estimate after design and a site visit.

Do you renovate in finished Digomi complexes, not just build from scratch?

Yes, apartments and townhouses in finished complexes we renovate as a standalone order from 1,000 ₾. Our main work in Digomi is still private houses built from scratch, where rough-in, finishing works and engineering are stages of the build.

How is house placement agreed on a densely built plot?

We work through the house placement in advance, accounting for setbacks from boundaries and neighbouring structures. This is part of the design, not a mid-construction decision. This avoids neighbour disputes and issues with later registering the house.

Can I monitor the construction remotely?

Yes, for owners abroad we have set up remote monitoring: regular photo and video reports by stage, estimate reconciliation, contact with the site manager. You see progress in Digomi in real time and approve decisions remotely.

We also build in other cities and areas of Georgia

Planning to build a house?

Start with a free consultation about your plot, floor area and budget. If you are still looking for land, tell us about a plot you are considering.

We will call within an hour, 24/7. You do not need drawings for the first conversation.