Interior design

All directions

Interior design

stroydom.ge provides interior design for apartments, houses and commercial premises in Tbilisi. A project includes the layout plan, 3D visuals, working drawings and material schedules, and we supervise the renovation against the design. We take orders from 1,000 ₾. The engineer's visit and measurement are free, the estimate is fixed before work starts, and the advance is no more than 15%. The warranty is set out in the contract.

A design project for an apartment, house or commercial space: site survey, layout plan, 3D visuals, drawings for the builders, material schedules and designer supervision.

You can order this job on its own

Orders start from 1,000 ₾. An engineer visits and measures free of charge, and we fix the estimate and schedule before work starts. We work in Tbilisi.

About the work

How does stroydom.ge deliver interior design?

An interior project from layout to working drawings and material schedules. Designer supervision during renovation, orders from 1,000 ₾.

What is included in interior design?

Layout plan

Site survey, furniture layout options, zoning, moving partitions within permitted limits.

3D visuals

Rendered views of the rooms with the chosen materials, lighting and furniture.

Working drawings

Floor, ceiling, electrical and plumbing plans, wall elevations with tile layouts.

Schedules and supervision

A list of materials with quantities, site visits and checks of the work against the project.

What is interior design and why is it needed?

A design project answers the main questions before renovation begins: where walls and furniture stand, where sockets and water points come out, which materials to buy and in what quantity. With drawings the crew works without guesswork, and purchasing follows the schedule. A project can be ordered on its own for an apartment, house, office or cafe. stroydom.ge has worked in Tbilisi since 2014.

What stages does interior design consist of?

Each stage runs only after the previous one is accepted — so hidden works are never "closed" before inspection, and a mistake never has to be hunted for through screed and plaster.

  1. 1

    Visit and survey

    An engineer visits free of charge, measures every room and records load-bearing walls, risers and windows.

  2. 2

    Design brief

    We record who will use the space, their habits, style preferences and the budget range for the renovation.

  3. 3

    Layout plan

    We prepare layout options and, once one is chosen, fix the positions of furniture and appliances.

  4. 4

    3D visuals

    We show the rooms in three dimensions with the chosen materials, colours and lighting.

  5. 5

    Working drawings and schedules

    We prepare drawings for the crew and a list of materials with quantities.

  6. 6

    Designer supervision

    During the renovation we visit the site and check the work against the project.

How does stroydom.ge control quality on site?

How we work on site — materials, equipment, tolerances, documentation and acceptance of hidden works.

Stage-by-stage approval

The client approves each stage before we move on to the next.

Drawings made for the site

Drawings are prepared the way an electrician, plumber and tiler read them: with dimensions and reference points.

Available materials

Schedules list items that can be bought in Georgia or delivered within a lead time known in advance.

Checks on site

On supervision visits we check the setting-out, service outlets and tile layout before finishes cover them.

What should be accounted for in Tbilisi and Georgia?

What we account for here: seismic intensity 8 (MSK-64), hot summers and damp winters, steep terrain, older stock with timber floors and worn city networks.

Load-bearing walls

Tbilisi lies in a zone of intensity 8 on the MSK-64 scale. Load-bearing walls and columns stay untouched in any replanning.

Hot summers

We plan positions and pipe routes for air conditioners, and curtains and window shading on the sunny side.

Damp winters

For bathrooms and ground floors we select moisture-resistant materials and ventilation.

Older buildings

Walls and floor slabs in older buildings are uneven, so the survey is detailed and levelling is allowed for in advance.

How much does it cost and how long does it take?

Indicative price ranges in lari (₾) for standard conditions. The final estimate is fixed after measurements and specification approval.

stroydom.ge prices: interior design in Tbilisi, ₾
ItemWhat is included and the price
Floor areaThe price starts from the floor area and the number of rooms.
Project scopeA full project with visuals costs more than a layout with drawings. The client chooses the scope.
Designer supervisionPriced separately, depending on how long the renovation runs and the number of site visits.
TermsWe prepare an exact estimate after a free visit and measurement and fix it before work starts. The advance is no more than 15%, and the warranty is set out in the contract. The minimum order is 1,000 ₾.

Updated:

Ready to estimate?

Leave a request — engineer site visit, measurement and a preliminary estimate for "interior design" are free.

Get a quote

Need the “Interior design” service?

Leave your phone number: we call back within an hour, clarify the scope and arrange a free site visit.

We will call within an hour, 24/7. You do not need drawings for the first conversation.

By submitting the form you agree to personal data processing. Privacy Policy

Frequently asked questions — Interior design

What does a design project include?

A measured survey plan, layout plan, 3D visuals, working drawings and material schedules. The scope can be reduced, for example to the layout and drawings without visuals.

Why is designer supervision needed?

The designer visits the site, checks the work against the drawings and answers the crew's questions. The result matches the design, and any material substitutions are agreed in advance.

Where do you work?

We work in Tbilisi. The survey is done on site, and the engineer's visit and measurement are free.

How much does interior design cost?

The price depends on floor area, the scope of the project and the number of rooms that need visuals. We prepare the estimate after a free visit and measurement and fix it before work starts. The minimum order is 1,000 ₾.