Construction waste removal

All directions

Construction waste removal

stroydom.ge removes construction waste in Tbilisi. We take away waste left after renovation and demolition: broken brick, plaster, tiles, plasterboard, old doors and bathroom fixtures. We carry it down, load the truck, take it away and clean up. We quote the price by phone before the visit, once you describe the job or send a photo. We call back within an hour, around the clock, and agree the visit time by phone.

Construction waste removal: estimating the volume from photos, carrying the waste out of the flat or off the plot, loading it into the truck and taking it away. Afterwards we sweep the area where the waste lay and the route we carried it along.

You can order this job on its own

We quote the price by phone before the visit: describe the job or send a photo. We call back within an hour, around the clock. We work in Tbilisi.

About the work

How does stroydom.ge deliver construction waste removal?

We take away waste after renovation and demolition: carrying down, loading and removal. The price is quoted by phone before the visit.

What is included in construction waste removal?

Estimating the volume

From photos and your description we work out the volume, weight and type of waste.

Carrying down

We bring bags and large pieces down by lift or by the stairs.

Loading

Our team loads the truck. All we need from you is access.

Removal and clean-up

We take the waste away and tidy the flat, the stairwell and the loading area.

What is construction waste removal and why is it needed?

Renovation and demolition leave behind pieces of wall, old tiles, plaster, packaging and removed doors. This waste is heavy and dusty, and the household bins in the yard are not meant for it. While it sits in the flat, finishing work is awkward, and on the landing it gets in the neighbours' way.

We handle the carrying, loading and removal.

What stages does construction waste removal consist of?

Each stage runs only after the previous one is accepted — so hidden works are never "closed" before inspection, and a mistake never has to be hunted for through screed and plaster.

  1. 1

    Call and photos

    You describe the waste and send photos. We quote the price and agree the visit time.

  2. 2

    Preparing the route

    We check the route from the flat to the truck, the lift and the loading spot.

  3. 3

    Carrying down

    We carry out bags and large pieces. Heavy items are carried by two people.

  4. 4

    Loading

    We stack the waste tightly so the full volume of the truck bed is used.

  5. 5

    Clean-up

    We sweep the flat, the landing and the area by the entrance.

  6. 6

    Removal

    The truck takes the waste away and you get a clean room back.

How does stroydom.ge control quality on site?

How we work on site — materials, equipment, tolerances, documentation and acceptance of hidden works.

Protecting the stairwell

We tie the bags and carry large pieces carefully so the walls and lift doors are not damaged.

Using the lift

If there is no lift or it cannot be used, we carry the waste down the stairs. Tell us about this by phone.

Loose waste

We bag loose waste on site. We estimate the amount of this work from photos.

Removal during renovation

On a long renovation the waste can go in stages: after demolition and after the rough work.

What should be accounted for in Tbilisi and Georgia?

What we account for here: seismic intensity 8 (MSK-64), hot summers and damp winters, steep terrain, older stock with timber floors and worn city networks.

Weight of the waste

Concrete and brick weigh far more than plasterboard and packaging. The same volume puts a different load on the truck.

Truck access

Yards in the older districts of Tbilisi are tight. The further the truck stands from the entrance, the longer the carrying takes.

Large items

Old baths, doors and window frames sometimes have to be taken apart to fit in the lift.

Neighbours and timing

Carrying waste out is noisy and dusty. We agree a time that does not disturb the residents.

How much does it cost and how long does it take?

Indicative price ranges in lari (₾) for standard conditions. The final estimate is fixed after measurements and specification approval.

stroydom.ge prices: construction waste removal in Tbilisi, ₾
ItemWhat is included and the price
Volume and typeThe price is set first of all by the volume of waste and what it consists of.
Floor and liftCarrying down the stairs from an upper floor takes longer than using the lift.
Bagging and dismantlingLoose waste and large items mean extra work on site.
How to get the priceWe quote the price by phone before the visit, once you describe the job or send a photo. On site we confirm it before work starts.

Updated:

Ready to estimate?

Leave a request — engineer site visit, measurement and a preliminary estimate for "construction waste removal" are free.

Get a quote

Need the “Construction waste removal” service?

Leave your phone number: we call back within an hour, clarify the job and quote the price before the visit.

We will call within an hour, 24/7. You do not need drawings for the first conversation.

By submitting the form you agree to personal data processing. Privacy Policy

Frequently asked questions — Construction waste removal

How much does construction waste removal cost in Tbilisi?

The price depends on the volume and weight of the waste, the floor, whether there is a lift and how close the truck can park. We quote it by phone before the visit, once you describe the job or send a photo.

Do I need to bag the waste in advance?

Small debris is easier to remove in bags, and carrying it out is quicker and cleaner. If you have no bags, tell us by phone and we will include bagging in the price.

What kind of waste do you take?

We take renovation and demolition waste: brick, concrete, plaster, tiles, plasterboard, timber, old windows, doors and bathroom fixtures. Describe the waste by phone or show it in a photo.

Where do you work and when can I book a removal?

We work in Tbilisi. We take requests around the clock and call back within an hour. The visit time is agreed by phone.