Shower enclosure installation

All directions

Shower enclosure installation

stroydom.ge installs shower enclosures in Tbilisi. We assemble the cabin or corner enclosure, fit the tray, connect water and waste, seal the joints and test the drain. We quote the price by phone before the visit, once you describe the job or send a photo. We call back within an hour, around the clock, and agree the visit time by phone. The warranty on the work is fixed with the order.

Shower enclosure installation: checking the space and the pipe outlets, levelling the tray, assembling the panels and doors, connecting water and waste, sealing the joints and testing with water.

You can order this job on its own

We quote the price by phone before the visit: describe the job or send a photo. We call back within an hour, around the clock. We work in Tbilisi.

About the work

How does stroydom.ge deliver shower enclosure installation?

Assembly of a shower cabin or corner enclosure, tray, connection and sealing. The price is quoted by phone before the visit.

What is included in shower enclosure installation?

Checking the space

We compare the enclosure dimensions with the space and check the water and waste outlets.

Tray

We level the tray, connect the trap and test the drain.

Panels and doors

We assemble the frame, glass and doors and adjust the rollers and seals.

Connection and sealing

We connect the mixer and shower and seal the joints at the wall and the tray.

What is shower enclosure installation and why is it needed?

A shower cabin arrives in parts: tray, frame, glass, doors, mixer and a set of seals. The assembly decides whether the cabin holds water and whether the doors close evenly. A corner enclosure is simpler, but it needs straight walls and careful sealing.

In the small bathrooms of Tbilisi flats a cabin often replaces the bath to free up space.

What stages does shower enclosure installation consist of?

Each stage runs only after the previous one is accepted — so hidden works are never "closed" before inspection, and a mistake never has to be hunted for through screed and plaster.

  1. 1

    Call and description

    You send a photo of the space and the cabin model. We quote the price and agree the visit time.

  2. 2

    Inspection on site

    We check the dimensions, the water and waste outlets and how level the floor and walls are. We confirm the price before work starts.

  3. 3

    Fitting the tray

    We level the tray, connect the trap to the waste and run water through it.

  4. 4

    Assembling the cabin

    We assemble the frame, fit the glass and doors and adjust the rollers.

  5. 5

    Connection and sealing

    We connect the mixer and shower and seal the joints at the wall and the tray.

  6. 6

    Test and handover

    We test the drain and joints with water, show you the result and tidy the work area.

How does stroydom.ge control quality on site?

How we work on site — materials, equipment, tolerances, documentation and acceptance of hidden works.

Assembly to the manufacturer's diagram

Every model is assembled in its own order. We follow the diagram supplied with it.

Clean work

We cover the floor and fixtures and take the packaging out after assembly.

Sealant curing

After sealing, the cabin cannot be used until the sealant has cured. We tell you the time on site.

Cabin in place of a bath

If the cabin replaces a bath, we discuss removing the bath and moving the outlets in advance.

What should be accounted for in Tbilisi and Georgia?

What we account for here: seismic intensity 8 (MSK-64), hot summers and damp winters, steep terrain, older stock with timber floors and worn city networks.

Tray level

If the tray is out of level, water stands in a corner and the doors drift apart. So we check the level before assembling the panels.

Waste height

The waste outlet must sit lower than the tray outlet. Otherwise water drains slowly and the tray has to be raised.

Straight walls

A corner enclosure sits directly against the wall. An uneven wall leaves a gap that is closed with a profile or sealant.

Waterproofing under an enclosure

If the enclosure stands on a tiled floor with a drain, waterproofing is needed under the tiles. It is done during renovation.

How much does it cost and how long does it take?

Indicative price ranges in lari (₾) for standard conditions. The final estimate is fixed after measurements and specification approval.

stroydom.ge prices: shower enclosure installation in Tbilisi, ₾
ItemWhat is included and the price
Type and sizeA cabin with a roof and hydromassage takes longer to assemble than a simple corner enclosure.
ConnectionWe take into account whether the water and waste outlets are ready or need moving.
Condition of the baseAn uneven floor and walls need extra preparation.
How to get the priceWe quote the price by phone before the visit, once you describe the job or send a photo. On site we confirm it before work starts.

Updated:

Ready to estimate?

Leave a request — engineer site visit, measurement and a preliminary estimate for "shower enclosure installation" are free.

Get a quote

Need the “Shower enclosure installation” service?

Leave your phone number: we call back within an hour, clarify the job and quote the price before the visit.

We will call within an hour, 24/7. You do not need drawings for the first conversation.

By submitting the form you agree to personal data processing. Privacy Policy

Frequently asked questions — Shower enclosure installation

How much does shower enclosure installation cost in Tbilisi?

The price depends on the type and size of the enclosure, the condition of the walls and floor and the amount of plumbing. We quote it by phone before the visit, from your description or a photo of the model.

What should be ready before you arrive?

Water and waste should reach the spot, and wall and floor finishes should be complete. Send a photo of the space and the cabin model, and we will tell you what is missing.

How is a corner enclosure different from a shower cabin?

A cabin has its own walls, roof and tray. A corner enclosure is made of glass panels and a door, fitted on a tray or straight onto a tiled floor with a drain.

Where do you work and when can I call you out?

We work in Tbilisi. We take requests around the clock and call back within an hour. The visit time is agreed by phone.