Painting works

All directions

Painting works

Surfaces prepared and painted evenly, with no streaks, patches or visible joins.

Painting works in Tbilisi, standalone or within a house project: filling, sanding, priming and two coats on walls and ceilings. Fixed estimate and warranty.

You can order this job on its own

Orders start from 1,000 ₾. An engineer visits and measures free of charge, and we fix the estimate and schedule before work starts. We work in Tbilisi.

About the work

How does stroydom.ge deliver painting works?

Surfaces prepared and painted evenly, with no streaks, patches or visible joins.

What is included in painting works?

Filling

Surfaces prepared and painted evenly, with no streaks, patches or visible joins.

Sanding

Surfaces prepared and painted evenly, with no streaks, patches or visible joins.

Wall painting

Surfaces prepared and painted evenly, with no streaks, patches or visible joins.

Ceiling painting

Surfaces prepared and painted evenly, with no streaks, patches or visible joins.

What is painting works and why is it needed?

Painting works in Tbilisi, standalone or within a house project: filling, sanding, priming and two coats on walls and ceilings. Fixed estimate and warranty.

What stages does painting works consist of?

Each stage runs only after the previous one is accepted — so hidden works are never "closed" before inspection, and a mistake never has to be hunted for through screed and plaster.

  1. 1

    Filling

    Surfaces prepared and painted evenly, with no streaks, patches or visible joins.

  2. 2

    Sanding

    Surfaces prepared and painted evenly, with no streaks, patches or visible joins.

  3. 3

    Wall painting

    Surfaces prepared and painted evenly, with no streaks, patches or visible joins.

  4. 4

    Ceiling painting

    Surfaces prepared and painted evenly, with no streaks, patches or visible joins.

How does stroydom.ge control quality on site?

How we work on site — materials, equipment, tolerances, documentation and acceptance of hidden works.

Detailed estimate

Surfaces prepared and painted evenly, with no streaks, patches or visible joins.

Clean worksite

Surfaces prepared and painted evenly, with no streaks, patches or visible joins.

Schedule control

Surfaces prepared and painted evenly, with no streaks, patches or visible joins.

Warranty

Surfaces prepared and painted evenly, with no streaks, patches or visible joins.

What should be accounted for in Tbilisi and Georgia?

What we account for here: seismic intensity 8 (MSK-64), hot summers and damp winters, steep terrain, older stock with timber floors and worn city networks.

Painting works

Painting works in Tbilisi, standalone or within a house project: filling, sanding, priming and two coats on walls and ceilings. Fixed estimate and warranty.

How much does it cost and how long does it take?

Indicative price ranges in lari (₾) for standard conditions. The final estimate is fixed after measurements and specification approval.

stroydom.ge prices: painting works in Tbilisi, ₾
ItemWhat is included and the price
Painting worksPainting works in Tbilisi, standalone or within a house project: filling, sanding, priming and two coats on walls and ceilings. Fixed estimate and warranty.

Updated:

Ready to estimate?

Leave a request — engineer site visit, measurement and a preliminary estimate for "painting works" are free.

Get a quote

Need the “Painting works” service?

Leave your phone number: we call back within an hour, clarify the scope and arrange a free site visit.

We will call within an hour, 24/7. You do not need drawings for the first conversation.

By submitting the form you agree to personal data processing. Privacy Policy