Demolition works

All directions

Demolition works

We strip out old finishes, partitions and screeds cleanly, with debris removed.

Demolition works in Tbilisi, standalone or within a house project: tile, screed, partitions and plumbing stripped out, with debris removed before finishing.

You can order this job on its own

Orders start from 1,000 ₾. An engineer visits and measures free of charge, and we fix the estimate and schedule before work starts. We work in Tbilisi.

About the work

How does stroydom.ge deliver demolition works?

We strip out old finishes, partitions and screeds cleanly, with debris removed.

What is included in demolition works?

Site preparation

We strip out old finishes, partitions and screeds cleanly, with debris removed.

Materials

We strip out old finishes, partitions and screeds cleanly, with debris removed.

Installation

We strip out old finishes, partitions and screeds cleanly, with debris removed.

Quality control

We strip out old finishes, partitions and screeds cleanly, with debris removed.

What is demolition works and why is it needed?

Demolition works in Tbilisi, standalone or within a house project: tile, screed, partitions and plumbing stripped out, with debris removed before finishing.

What stages does demolition works consist of?

Each stage runs only after the previous one is accepted — so hidden works are never "closed" before inspection, and a mistake never has to be hunted for through screed and plaster.

  1. 1

    Site preparation

    We strip out old finishes, partitions and screeds cleanly, with debris removed.

  2. 2

    Materials

    We strip out old finishes, partitions and screeds cleanly, with debris removed.

  3. 3

    Installation

    We strip out old finishes, partitions and screeds cleanly, with debris removed.

  4. 4

    Quality control

    We strip out old finishes, partitions and screeds cleanly, with debris removed.

How does stroydom.ge control quality on site?

How we work on site — materials, equipment, tolerances, documentation and acceptance of hidden works.

Detailed estimate

We strip out old finishes, partitions and screeds cleanly, with debris removed.

Clean worksite

We strip out old finishes, partitions and screeds cleanly, with debris removed.

Schedule control

We strip out old finishes, partitions and screeds cleanly, with debris removed.

Warranty

We strip out old finishes, partitions and screeds cleanly, with debris removed.

What should be accounted for in Tbilisi and Georgia?

What we account for here: seismic intensity 8 (MSK-64), hot summers and damp winters, steep terrain, older stock with timber floors and worn city networks.

Demolition works

Demolition works in Tbilisi, standalone or within a house project: tile, screed, partitions and plumbing stripped out, with debris removed before finishing.

How much does it cost and how long does it take?

Indicative price ranges in lari (₾) for standard conditions. The final estimate is fixed after measurements and specification approval.

stroydom.ge prices: demolition works in Tbilisi, ₾
ItemWhat is included and the price
Demolition worksDemolition works in Tbilisi, standalone or within a house project: tile, screed, partitions and plumbing stripped out, with debris removed before finishing.

Updated:

Ready to estimate?

Leave a request — engineer site visit, measurement and a preliminary estimate for "demolition works" are free.

Get a quote

Need the “Demolition works” service?

Leave your phone number: we call back within an hour, clarify the scope and arrange a free site visit.

We will call within an hour, 24/7. You do not need drawings for the first conversation.

By submitting the form you agree to personal data processing. Privacy Policy