Window repair

All directions

Window repair

stroydom.ge repairs windows in Tbilisi. We adjust sashes, replace hardware, seals and glazing units, fit insect screens and fix draughts. We quote the price by phone before the visit, once you describe the job or send a photo. We call back within an hour, around the clock, and agree the visit time by phone. The warranty on the work is fixed when you place the order.

Repair of uPVC windows and balcony doors: sash adjustment, replacement of handles, hinges and locking mechanisms, new seals, glazing unit replacement and insect screens.

You can order this job on its own

We quote the price by phone before the visit: describe the job or send a photo. We call back within an hour, around the clock. We work in Tbilisi.

About the work

How does stroydom.ge deliver window repair?

Adjustment, new hardware, seals and glazing units, insect screens. The price is quoted by phone before the visit.

What is included in window repair?

Sash adjustment

We set the sash for height and closing pressure so it shuts without force.

Hardware

We replace handles, hinges, locking mechanisms and opening restrictors.

Seals and draughts

We fit a new seal and check the closing pressure around the whole sash.

Glazing units and screens

We replace a cracked or misted glazing unit and fit an insect screen sized to the opening.

What is window repair and why is it needed?

A window is made up of a frame, sashes, hardware, a seal and a glazing unit. Over time the sash drops, the seal hardens, and the handle and locking mechanism wear out. The window lets in draughts, becomes stiff to close or mists up inside the glazing unit.

In most cases a repair is enough and the whole window does not need replacing. Windows in Tbilisi stay open for much of the summer, so we also fit insect screens.

What stages does window repair consist of?

Each stage runs only after the previous one is accepted — so hidden works are never "closed" before inspection, and a mistake never has to be hunted for through screed and plaster.

  1. 1

    Call and description

    You describe the fault or send a photo. We quote the price and agree the visit time.

  2. 2

    Window inspection

    We check the sashes, hardware, seal and glazing unit and confirm the price before work starts.

  3. 3

    Adjustment

    We set the sash at the hinges and adjust the closing pressure.

  4. 4

    Replacing parts

    We replace worn hardware and seals and take measurements for a glazing unit or screen.

  5. 5

    Check

    We open and close the sash in every mode and check the pressure around the perimeter.

  6. 6

    Handover

    We show you the result, explain how to look after the window and tidy the work area.

How does stroydom.ge control quality on site?

How we work on site — materials, equipment, tolerances, documentation and acceptance of hidden works.

Work on site

Adjustment and hardware replacement are done in the flat. The window stays in the opening.

Glazing made to size

We order the glazing unit and insect screen to the measurements taken and fit them on a second visit.

Clean work

We cover the sill and floor and take the old parts and packaging away.

Balcony doors

A balcony door is repaired the same way as a window: adjustment, handle, hinges, seal.

What should be accounted for in Tbilisi and Georgia?

What we account for here: seismic intensity 8 (MSK-64), hot summers and damp winters, steep terrain, older stock with timber floors and worn city networks.

Summer and winter pressure

The closing pressure can be changed by season. It is increased for winter and eased for summer so the seal lasts longer.

Misted glazing unit

Moisture between the panes means the unit has lost its seal. Adjustment does not help here and the unit is replaced.

Dropped sash

A heavy sash settles over time and catches on the frame. Adjusting the hinges usually solves it.

Installation joint

If the draught comes from under the sill or from the reveal, the cause is the joint between frame and wall. It is opened up and sealed again.

How much does it cost and how long does it take?

Indicative price ranges in lari (₾) for standard conditions. The final estimate is fixed after measurements and specification approval.

stroydom.ge prices: window repair in Tbilisi, ₾
ItemWhat is included and the price
Type of workAdjustment takes less time than replacing hardware or a glazing unit.
Parts and materialsThe price is affected by the hardware, the length of seal and the size and type of glazing unit.
Number of windows and accessWe count the sashes and take into account how easy it is to reach the window from inside and outside.
How to get the priceWe quote the price by phone before the visit, once you describe the job or send a photo. On site we confirm it before work starts.

Updated:

Ready to estimate?

Leave a request — engineer site visit, measurement and a preliminary estimate for "window repair" are free.

Get a quote

Need the “Window repair” service?

Leave your phone number: we call back within an hour, clarify the job and quote the price before the visit.

We will call within an hour, 24/7. You do not need drawings for the first conversation.

By submitting the form you agree to personal data processing. Privacy Policy

Frequently asked questions — Window repair

How much does window repair cost in Tbilisi?

The price depends on the type of work, the sash size and the parts that need replacing. We quote it by phone before the visit, from your description or a photo, and confirm it before work starts.

Why is there a draught from my window?

Usually the sash no longer presses tightly or the seal has hardened. Less often the draught comes from the installation joint under the sill or at the reveal. We find the spot and suggest a fix.

Can a glazing unit be replaced without changing the window?

Yes. The unit is held by beads, so it is replaced separately from the frame and sash. We measure, a new unit is made to size and fitted in place of the old one.

Where do you work and when can I call you out?

We work in Tbilisi. We take requests around the clock and call back within an hour. The visit time is agreed by phone.