Stretch ceilings

All directions

Stretch ceilings

stroydom.ge installs stretch ceilings in Tbilisi, in apartments, houses and commercial premises. The service is ordered on its own, with a minimum order of 1,000 ₾. We fit PVC and fabric membranes, classic and shadow-gap profiles, and mounting plates for lights and curtain tracks. The survey is free, the estimate is fixed before work starts, and the advance is no more than 15%. The work carries a 2-year warranty.

Stretch ceiling installation: fixing the profile, mounting plates for lights and curtain tracks, stretching the membrane and fitting the lights. We work over finished walls with very little dust.

You can order this job on its own

Orders start from 1,000 ₾. An engineer visits and measures free of charge, and we fix the estimate and schedule before work starts. We work in Tbilisi.

About the work

How does stroydom.ge deliver stretch ceilings?

PVC and fabric stretch ceilings for apartments, houses and commercial premises. The survey is free, orders start from 1,000 ₾.

What is included in stretch ceilings?

Survey and selection

An engineer measures the room, checks the walls and recommends a membrane and profile.

Profile and mounting plates

We fix the profile around the perimeter and fit plates on the slab for lights and the curtain track.

Stretching the membrane

A PVC membrane is heated and tucked into the profile, a fabric one is stretched without heat.

Lighting and handover

We fit the lights, check seams and corners, and hand the ceiling over with a signed certificate.

What is stretch ceilings and why is it needed?

A stretch ceiling is a membrane of PVC film or fabric that is tucked into a profile fixed around the perimeter of the room. The membrane hides an uneven slab, cracks and wiring, so the old ceiling no longer needs filling and painting. PVC film does not let water through and suits bathrooms and kitchens.

Installation involves no wet trades and is normally carried out over a finished renovation.

What stages does stretch ceilings consist of?

Each stage runs only after the previous one is accepted — so hidden works are never "closed" before inspection, and a mistake never has to be hunted for through screed and plaster.

  1. 1

    Survey and estimate

    The engineer's visit and the survey are free. We fix the estimate before work starts.

  2. 2

    Choosing membrane and profile

    We agree the texture, colour, profile type and the lighting layout.

  3. 3

    Marking and fixing the profile

    We set the level with a laser and fix the profile around the perimeter.

  4. 4

    Mounting plates and wiring

    We fit plates for spotlights, the pendant and the curtain track, and check the cable.

  5. 5

    Stretching the membrane

    We stretch the membrane from the corners and tuck it into the profile along the whole perimeter.

  6. 6

    Lights and handover

    We cut the openings, fit the lights, clean the room and sign the handover certificate.

How does stroydom.ge control quality on site?

How we work on site — materials, equipment, tolerances, documentation and acceptance of hidden works.

Clean drilling

The hammer drill runs together with a vacuum, so finished walls and floors stay clean.

Protecting furniture and finishes

We cover furniture with film. Heat-sensitive items are taken out of the room beforehand.

Wiring check

We switch on every circuit before stretching, because the cable is hard to reach afterwards.

Signed handover

We inspect the membrane, corners and lights together with you and sign the certificate.

What should be accounted for in Tbilisi and Georgia?

What we account for here: seismic intensity 8 (MSK-64), hot summers and damp winters, steep terrain, older stock with timber floors and worn city networks.

Hidden pipes and cables

The profile is fixed by drilling into the wall. We scan the wall with a detector before drilling.

Fixing to tiles

In a bathroom the profile sits on the tiles, and we drill them with a diamond bit so they do not crack.

Heat from lights

A PVC membrane does not tolerate overheating. We fit LED lights and thermal rings.

Room height

A stretch ceiling takes a few centimetres off the room height. We agree the exact level at the survey.

Unheated rooms

Winters in Tbilisi are damp. For a cold balcony or a storeroom we recommend a fabric membrane, which copes better with temperature swings.

How much does it cost and how long does it take?

Indicative price ranges in lari (₾) for standard conditions. The final estimate is fixed after measurements and specification approval.

stroydom.ge prices: stretch ceilings in Tbilisi, ₾
ItemWhat is included and the price
Area and shapeThe price rises with the area, the number of corners and any curved sections.
Membrane and profileMatt, satin, gloss and fabric membranes are priced differently. A shadow-gap profile costs more than a classic one.
Lights and mounting platesThe estimate includes every spotlight, pendant, hidden curtain track and access hatch.
TermsThe minimum order is 1,000 ₾. We give an exact price after a free survey, and the advance is no more than 15%.

Updated:

Ready to estimate?

Leave a request — engineer site visit, measurement and a preliminary estimate for "stretch ceilings" are free.

Get a quote

Need the “Stretch ceilings” service?

Leave your phone number: we call back within an hour, clarify the scope and arrange a free site visit.

We will call within an hour, 24/7. You do not need drawings for the first conversation.

By submitting the form you agree to personal data processing. Privacy Policy

Frequently asked questions — Stretch ceilings

How much does a stretch ceiling cost in Tbilisi?

The price depends on area, membrane type, profile and the number of lights. The minimum order is 1,000 ₾. We prepare the exact estimate after a free survey and fix it before work starts.

Can a stretch ceiling be installed in a bathroom?

Yes. A PVC membrane withstands moisture and steam and does not let water through. In a bathroom we fix the profile to the tiles and choose moisture-protected lights.

Where do you work?

We work in Tbilisi. The engineer's visit and the survey are free. We call back within an hour of your request, at any time of day.

At what stage of a renovation is the ceiling installed?

The ceiling goes in last, once the walls are finished and the dusty work is over. Wiring for lights and curtain tracks must be in place beforehand.