
Natural stone cladding
stroydom.ge installs natural stone cladding in Tbilisi. We clad facades, plinths, fences, retaining walls and steps. The service is ordered on its own, with a minimum order of 1,000 ₾. The engineer's visit and the survey are free, the estimate is fixed before work starts, and the advance is no more than 15%. Facade work carries a 5-year warranty.
Natural stone cladding: preparing the substrate, setting out, fixing with adhesive and anchors, filling the joints and applying a protective sealer. We work with slabs, flagstone and split-face stone.
You can order this job on its own
Orders start from 1,000 ₾. An engineer visits and measures free of charge, and we fix the estimate and schedule before work starts. We work in Tbilisi.
About the work
How does stroydom.ge deliver natural stone cladding?
Facades, plinths, fences, retaining walls and steps in natural stone. Orders start from 1,000 ₾.
What is included in natural stone cladding?
Choosing the stone
We select the type, thickness and texture for the location: facade, plinth, fence or steps.
Preparing the substrate
We check the strength of the wall, level it, prime it and reinforce it with mesh where needed.
Fixing the stone
The stone is bonded with adhesive for natural stone, and heavy slabs are also fixed with anchors.
Joints and protection
We fill the joints and coat the stone with a water-repellent sealer.
What is natural stone cladding and why is it needed?
Natural stone protects a wall from moisture and impact and needs no painting. It is used on plinths, facades, fences, retaining walls and steps. Stone is heavy, so the substrate is checked and the fixing method chosen before installation.
Tbilisi is rated at seismic intensity 8 on the MSK-64 scale, so we fix large slabs at height with anchors.
What stages does natural stone cladding consist of?
Each stage runs only after the previous one is accepted — so hidden works are never "closed" before inspection, and a mistake never has to be hunted for through screed and plaster.
- 1
Visit and survey
An engineer inspects the site free of charge, measures the areas and checks the condition of the substrate.
- 2
Stone and estimate
We agree the stone type, format and layout. The price is fixed before work starts.
- 3
Preparing the substrate
We clean and level the surface, prime it and fit mesh or anchors.
- 4
Installing the cladding
We lay the stone from the bottom up and check flatness and joint width as we go.
- 5
Joints and junctions
We fill the joints and finish corners, reveals, sills and the junction with the paving around the house.
- 6
Sealing and handover
We clean the surface, apply a water-repellent sealer and sign the certificate.
How does stroydom.ge control quality on site?
How we work on site — materials, equipment, tolerances, documentation and acceptance of hidden works.
Samples on site
We show the stone on site in daylight before the full batch is ordered.
Layout agreed in advance
The pattern and cuts are agreed before installation, so corners and openings look neat.
Fixing by weight
Thin stone is bonded, while heavy slabs and high sections also get anchors.
Working with the weather
We do not apply adhesive or grout in rain or on a wall overheated by the sun.
What should be accounted for in Tbilisi and Georgia?
What we account for here: seismic intensity 8 (MSK-64), hot summers and damp winters, steep terrain, older stock with timber floors and worn city networks.
Weight of the cladding
Stone adds a noticeable load to the wall and the foundation. We assess the load before the material is ordered.
Seismic conditions
Tbilisi is rated at seismic intensity 8 on the MSK-64 scale. Adhesive alone is not enough for large slabs at height, so they need mechanical fixings.
Water and efflorescence
Water behind the cladding causes white stains and loosens the stone. Sills, drip edges and tight junctions are needed.
Retaining walls
A clad retaining wall needs drainage behind it, otherwise water presses on the stone from the soil side.
Steps
For steps we use stone with a rough surface, so it is not slippery in the rain.
How much does it cost and how long does it take?
Indicative price ranges in lari (₾) for standard conditions. The final estimate is fixed after measurements and specification approval.
| Item | What is included and the price |
|---|---|
| Stone type and format | Slabs, flagstone and split-face stone differ in material price and in the labour needed to lay them. |
| Substrate | Levelling, reinforcement and anchors add to the scope of work. |
| Height and access | Working from scaffolding on a facade is harder than cladding a plinth or a fence. |
| Terms | The minimum order is 1,000 ₾. We prepare the exact estimate after a free survey, and the advance is no more than 15%. |
Updated:
Ready to estimate?
Leave a request — engineer site visit, measurement and a preliminary estimate for "natural stone cladding" are free.

Need the “Natural stone cladding” service?
Leave your phone number: we call back within an hour, clarify the scope and arrange a free site visit.
We will call within an hour, 24/7. You do not need drawings for the first conversation.
By submitting the form you agree to personal data processing. Privacy Policy
Frequently asked questions — Natural stone cladding
How much does stone cladding cost in Tbilisi?
The price depends on the type and thickness of the stone, the area, the height and the condition of the substrate. The minimum order is 1,000 ₾. We prepare the exact estimate after a free survey and fix it before work starts.
Which stone should I choose for a facade and a plinth?
A plinth needs dense stone with low water absorption, such as basalt or granite. Tuff, travertine and sandstone are also used on facades. We select samples at the survey.
Will the wall carry stone cladding?
That depends on the wall material and the weight of the stone. The engineer assesses the substrate at the survey. Heavy slabs are fixed with anchors, and a weak wall gets thin stone.
Where do you work and how quickly do you respond?
We work in Tbilisi. We call back within an hour of your request, at any time of day. The engineer's visit and the survey are free.



