Office and commercial renovation

All directions

Office and commercial renovation

stroydom.ge renovates offices and commercial premises in Tbilisi: offices, shops, cafes and salons. We take orders from 1,000 ₾. The engineer's visit and measurement are free, the estimate is fixed before work starts, and the advance is no more than 15%. Companies can pay by bank transfer and receive the full set of accounting documents. By agreement, noisy work is moved outside working hours. Finishing work carries a 2-year warranty.

Commercial renovation: strip-out, partitions, electrical and low-voltage networks, ventilation and air conditioning, ceilings, floors and final finishes matched to how the business works.

You can order this job on its own

Orders start from 1,000 ₾. An engineer visits and measures free of charge, and we fix the estimate and schedule before work starts. We work in Tbilisi.

About the work

How does stroydom.ge deliver office and commercial renovation?

Renovation of offices, shops, cafes and salons in Tbilisi with a fixed estimate. Bank transfer for companies, orders from 1,000 ₾.

What is included in office and commercial renovation?

Partitions and layout

Drywall and glass partitions, private offices, meeting rooms, open-plan areas.

Electrical and data

Power circuits, lighting, sockets at each desk, cabling for internet and CCTV.

Ceilings and floors

Suspended and drywall ceilings, hard-wearing floors: commercial vinyl, porcelain tile, carpet tiles.

Final finishes

Painting, decorative coatings, doors, washrooms and the reception area.

What is office and commercial renovation and why is it needed?

A commercial renovation follows the needs of the business: customer flow, number of desks, equipment requirements. An office needs power and data at every desk, a cafe needs strong kitchen extraction and moisture-resistant finishes, a shop needs light on the goods. We therefore start with the layout and building services and choose finishes to suit the wear they will take. stroydom.ge has worked in Tbilisi since 2014.

What stages does office and commercial renovation consist of?

Each stage runs only after the previous one is accepted — so hidden works are never "closed" before inspection, and a mistake never has to be hunted for through screed and plaster.

  1. 1

    Visit and measurement

    An engineer visits the site free of charge, measures the premises and records the condition of walls, floors and services.

  2. 2

    Estimate and contract

    We agree the scope of work and materials. The estimate is fixed before work starts, and the advance is no more than 15%.

  3. 3

    Strip-out and partitions

    We remove old finishes and build new partitions to the agreed layout.

  4. 4

    Building services

    We run electrical and low-voltage cabling, water supply, ventilation and air-conditioning pipework.

  5. 5

    Finishes

    We level walls, install ceilings, lay floors, paint, and fit doors and light fittings.

  6. 6

    Handover

    We clean the premises, test the services together with the client, sign the acceptance certificate and hand over the documents.

How does stroydom.ge control quality on site?

How we work on site — materials, equipment, tolerances, documentation and acceptance of hidden works.

One point of contact

A site manager runs the schedule and answers the client's questions.

Schedule around your hours

Noisy work and waste removal are planned for hours agreed with the client and the building management.

Dust control

We screen off the work area with sheeting, cover furniture and equipment, and clean up at the end of each shift.

Paperwork

We work under a contract. Companies pay by bank transfer and receive the full set of accounting documents.

What should be accounted for in Tbilisi and Georgia?

What we account for here: seismic intensity 8 (MSK-64), hot summers and damp winters, steep terrain, older stock with timber floors and worn city networks.

Building rules

Business centres and shopping centres have their own rules: hours for noisy work, access passes, use of the goods lift. We agree these before starting.

Electrical load

Office equipment, servers and kitchen appliances need dedicated circuits. We calculate the load before any cable is laid.

Ventilation and climate

Tbilisi summers are hot, so air conditioning and fresh-air supply are planned before the ceilings go in.

Wear on finishes

Floors and walls in high-traffic areas wear faster than in a home. We select commercial-grade materials.

How much does it cost and how long does it take?

Indicative price ranges in lari (₾) for standard conditions. The final estimate is fixed after measurements and specification approval.

stroydom.ge prices: office and commercial renovation in Tbilisi, ₾
ItemWhat is included and the price
Area and conditionThe estimate starts from the floor area and the amount of preparation. A bare shell and a space with old finishes are priced differently.
Building servicesThe number of desks, equipment load, extraction and air conditioning change the cost noticeably.
Finish levelThe client chooses materials for ceilings, floors, partitions and lighting. The estimate shows the options.
TermsWe prepare an exact estimate after a free visit and measurement and fix it before work starts. The advance is no more than 15%. The minimum order is 1,000 ₾.

Updated:

Ready to estimate?

Leave a request — engineer site visit, measurement and a preliminary estimate for "office and commercial renovation" are free.

Get a quote

Need the “Office and commercial renovation” service?

Leave your phone number: we call back within an hour, clarify the scope and arrange a free site visit.

We will call within an hour, 24/7. You do not need drawings for the first conversation.

By submitting the form you agree to personal data processing. Privacy Policy

Frequently asked questions — Office and commercial renovation

Do you work with companies?

Yes. We sign a contract with the company, accept payment by bank transfer and hand over the full set of accounting documents. The advance is no more than 15%, and the estimate is fixed before work starts.

Can you renovate without closing the office?

Yes. We split the premises into zones and work through them in turn. Noisy and dusty work is moved to evenings, nights or weekends by agreement.

Which areas do you cover?

We work in every district of Tbilisi. The engineer's visit and measurement are free, and we call back within an hour, around the clock.

How much does an office renovation cost?

The price depends on floor area, the condition of the premises, building services and the finish level. We prepare an exact estimate after a free visit and measurement. The minimum order is 1,000 ₾.