New-build apartment renovation
stroydom.ge renovates new-build apartments in Tbilisi. We take an apartment in black or white frame and bring it to move-in condition: utilities, screed, plastering, tiling, flooring and doors. The service is ordered on its own, with a minimum order of 1,000 ₾. The engineer's visit and the survey are free, the estimate is fixed before work starts, and the advance is no more than 15%. Finishes carry a 2-year warranty and utilities a 3-year warranty.
New-build apartment renovation: partitions, electrics, water supply and drainage, screed, plastering, tiling, flooring, painting, doors and sanitary ware. The scope depends on the condition in which the developer handed over the apartment.
You can order this job on its own
Orders start from 1,000 ₾. An engineer visits and measures free of charge, and we fix the estimate and schedule before work starts. We work in Tbilisi.
About the work
How does stroydom.ge deliver new-build apartment renovation?
An apartment taken from black or white frame to move-in: utilities, screed, plastering and finishes. Orders start from 1,000 ₾.
What is included in new-build apartment renovation?
Survey and work plan
We measure the apartment, check the walls and windows, and list the work room by room.
Utilities
Electrics, water and drainage are routed before plastering and screed.
Rough work
We build partitions, plaster the walls along guide beads and pour the screed.
Finishes
We lay tiles and flooring, paint the walls, and fit doors and sanitary ware.
What is new-build apartment renovation and why is it needed?
Developers in Tbilisi hand over apartments in black frame or white frame. Black frame means walls and windows with no screed, plaster or wiring. In a white frame the utilities, screed and plaster are already in place, and the renovation starts with checking their quality.
The starting condition determines the scope, the order of stages and the estimate.
What stages does new-build apartment renovation consist of?
Each stage runs only after the previous one is accepted — so hidden works are never "closed" before inspection, and a mistake never has to be hunted for through screed and plaster.
- 1
Visit and survey
An engineer inspects the apartment free of charge, measures the rooms and checks the walls, floor and windows.
- 2
Estimate and contract
We agree the list of work and the materials. The price is fixed before work starts.
- 3
Partitions and utilities
We build partitions and route the electrics, water and drainage.
- 4
Plastering and screed
We level the walls along guide beads, pour the screed and let it dry.
- 5
Finishes
We lay tiles, fit the ceilings, paint the walls and lay the floor covering.
- 6
Doors, sanitary ware and handover
We fit doors, sockets and sanitary ware, test the utilities and sign the certificate.
How does stroydom.ge control quality on site?
How we work on site — materials, equipment, tolerances, documentation and acceptance of hidden works.
Dusty work first
Dusty and wet work comes first, finishes follow. Finished surfaces do not have to be redone.
Checking the developer's work
In a white frame we check the screed, plaster and wiring before finishing begins.
Building rules
We agree the hours for noisy work, material deliveries and waste removal with the building administration.
Concealed work
We photograph the wiring and pipework before plaster and screed cover them.
What should be accounted for in Tbilisi and Georgia?
What we account for here: seismic intensity 8 (MSK-64), hot summers and damp winters, steep terrain, older stock with timber floors and worn city networks.
Settlement of a new building
A new building settles in its first years. We reinforce the joints between walls and partitions with mesh so the finishes do not crack.
Screed drying
Floor coverings go only on a dry screed. We check the moisture level before laying.
Wet areas
In the bathroom and toilet we waterproof the floor and the walls around the shower before tiling.
Electrical capacity
We compare the power allocated to the apartment with your appliances and spread the load across circuits.
Seismic conditions
Tbilisi is rated at seismic intensity 8 on the MSK-64 scale. We do not cut into load-bearing walls, columns or floor slabs.
How much does it cost and how long does it take?
Indicative price ranges in lari (₾) for standard conditions. The final estimate is fixed after measurements and specification approval.
| Item | What is included and the price |
|---|---|
| Condition of the frame | A renovation from black frame includes utilities, screed and plastering, so the scope is larger than from white frame. |
| Area and layout | The price is affected by the area, the number of bathrooms and the number of new partitions. |
| Finishing materials | Tiles, flooring, doors and sanitary ware of different grades change the estimate total noticeably. |
| Terms | The minimum order is 1,000 ₾. We prepare the exact estimate after a free survey, and the advance is no more than 15%. |
Updated:
Ready to estimate?
Leave a request — engineer site visit, measurement and a preliminary estimate for "new-build apartment renovation" are free.

Need the “New-build apartment renovation” service?
Leave your phone number: we call back within an hour, clarify the scope and arrange a free site visit.
We will call within an hour, 24/7. You do not need drawings for the first conversation.
By submitting the form you agree to personal data processing. Privacy Policy
Frequently asked questions — New-build apartment renovation
How much does a new-build renovation cost in Tbilisi?
The price depends on the area, the frame condition and the grade of materials. The minimum order is 1,000 ₾. We prepare the exact estimate after a free survey and fix it before work starts.
What is the difference between black frame and white frame?
A black frame apartment has only walls and windows, with no screed, plaster or wiring. In a white frame the utilities, screed and plaster are already done, and only the finishes remain.
Can the layout of a new apartment be changed?
Internal partitions can usually be moved. Load-bearing walls, columns and shared risers must stay as they are. The engineer checks what is allowed in your apartment at the survey.
Where do you work and how quickly do you respond?
We work in Tbilisi. We call back within an hour of your request, at any time of day. The engineer's visit and the survey are free.