Custom kitchens and furniture

All directions

Custom kitchens and furniture

stroydom.ge makes custom kitchens and furniture in Tbilisi. We measure the room, prepare a design, make the kitchen, wardrobe, walk-in closet or built-in furniture to it, fit it and connect the appliances. The service is ordered on its own, with a minimum order of 1,000 ₾. The engineer's visit and the survey are free, the estimate is fixed before work starts, and the advance is no more than 15%. The furniture warranty is set in the contract.

Custom furniture: survey, design with appliance layout, making the cabinets and fronts, fitting, installing the worktop and sink, and connecting built-in appliances. We make kitchens, sliding wardrobes, walk-in closets and furniture for alcoves.

You can order this job on its own

Orders start from 1,000 ₾. An engineer visits and measures free of charge, and we fix the estimate and schedule before work starts. We work in Tbilisi.

About the work

How does stroydom.ge deliver custom kitchens and furniture?

Kitchens, wardrobes, walk-in closets and built-in furniture made to the size of the room, from survey to appliance connection. Orders start from 1,000 ₾.

What is included in custom kitchens and furniture?

Survey and design

We measure the walls, corners and service outlets and prepare a design with the appliance layout.

Materials and hardware

Fronts, cabinets, worktop and hardware are chosen from samples and listed in the estimate.

Making and fitting

We make the furniture to the agreed design, assemble it and adjust it on site.

Appliance connection

We install the hob, oven, extractor hood and dishwasher, and fit the sink and tap.

What is custom kitchens and furniture and why is it needed?

Custom furniture is made for a specific room, to its dimensions, corners and service positions. A ready-made set in standard widths leaves gaps at the walls and rarely lines up with the water outlets and sockets. Walls and corners are rarely perfectly true in old houses or in new blocks, so an accurate survey and on-site adjustment decide the result.

How long a kitchen lasts depends on the hardware, on protecting the edges from moisture and on careful fitting.

What stages does custom kitchens and furniture consist of?

Each stage runs only after the previous one is accepted — so hidden works are never "closed" before inspection, and a mistake never has to be hunted for through screed and plaster.

  1. 1

    Visit and survey

    An engineer measures the room free of charge and marks the water and waste outlets, sockets and ventilation.

  2. 2

    Design and estimate

    We agree the layout, materials and appliances. The price is fixed before work starts.

  3. 3

    Check measurements

    Once the finishes are complete we recheck the dimensions and refine the design.

  4. 4

    Making

    We make the cabinets, fronts and worktop to the design and put together the hardware.

  5. 5

    Fitting

    We assemble and level the cabinets, hang the fronts, and install the worktop and splashback.

  6. 6

    Appliances and handover

    We connect the appliances, sink and tap, adjust the fronts and sign the certificate.

How does stroydom.ge control quality on site?

How we work on site — materials, equipment, tolerances, documentation and acceptance of hidden works.

Design before wiring

We agree the appliance layout early so that sockets and water outlets do not end up behind a cabinet or drawer.

Choosing from samples

We show the colour and texture of the fronts, worktop and edging on samples before you order.

Clean fitting

We cover the floor and walls, trim parts with a vacuum attached and take the packaging away.

Checks at handover

Together with the client we check the drawer travel, the gaps between fronts and the appliances.

What should be accounted for in Tbilisi and Georgia?

What we account for here: seismic intensity 8 (MSK-64), hot summers and damp winters, steep terrain, older stock with timber floors and worn city networks.

Uneven walls and corners

We cover wall deviations with filler panels and by trimming the worktop on site.

Moisture at the sink

We seal the worktop edges and joints near the sink, otherwise the board swells from water.

Extractor and ventilation

The position of the ventilation duct sets where the hood goes. A long duct with bends reduces airflow.

Load on the wall

Wall cabinets on a plasterboard partition need reinforcement in the frame, which is done before finishing.

Built-in appliances

Housings are made to the installation drawings of specific models, so the appliances are chosen before making starts.

How much does it cost and how long does it take?

Indicative price ranges in lari (₾) for standard conditions. The final estimate is fixed after measurements and specification approval.

stroydom.ge prices: custom kitchens and furniture in Tbilisi, ₾
ItemWhat is included and the price
Size and configurationThe price rises with kitchen length and the number of drawers, corner units and non-standard elements.
MaterialsThe estimate is affected by the material of the fronts, cabinets and worktop.
Hardware and interiorsDrawer runners, lift mechanisms, pull-out systems and lighting are separate lines in the estimate.
TermsThe minimum order is 1,000 ₾. We give an exact price after a free survey, and the advance is no more than 15%.

Updated:

Ready to estimate?

Leave a request — engineer site visit, measurement and a preliminary estimate for "custom kitchens and furniture" are free.

Get a quote

Need the “Custom kitchens and furniture” service?

Leave your phone number: we call back within an hour, clarify the scope and arrange a free site visit.

We will call within an hour, 24/7. You do not need drawings for the first conversation.

By submitting the form you agree to personal data processing. Privacy Policy

Frequently asked questions — Custom kitchens and furniture

How much does a custom kitchen cost in Tbilisi?

The price depends on the kitchen length, the materials of the fronts and worktop, the hardware and the number of built-in appliances. The minimum order is 1,000 ₾. We fix the estimate after a free survey, before work starts.

When should I order a kitchen during a renovation?

Prepare the kitchen design before wiring and plumbing, so sockets and water outlets end up in the right places. We take check measurements after the walls and floor are finished.

What furniture do you make besides kitchens?

We make sliding and hinged wardrobes, walk-in closets, furniture for alcoves and sloping ceilings, bathroom vanity units and hallway furniture. Sizes and interiors suit the room and your belongings.

Where do you work and how quickly do you respond?

We work in Tbilisi. We call back within an hour, at any time of day. The engineer's visit and survey are free.