Sauna and bathhouse construction

All directions

Sauna and bathhouse construction

stroydom.ge builds turnkey saunas and bathhouses in Tbilisi. We build a sauna in a house or apartment, a separate bathhouse on a plot, or a hammam: insulation, vapour barrier, heater, ventilation and finishing. The service is ordered on its own, with a minimum order of 1,000 ₾. The engineer's visit and the survey are free, the estimate is fixed before work starts, and the advance is no more than 15%. Finishing work carries a 2-year warranty.

Sauna and bathhouse construction: framing, insulation, vapour barrier, ventilation, heater installation, electrics, timber or tile finishing, benches and door. We work in an existing room or build a separate bathhouse on the plot.

You can order this job on its own

Orders start from 1,000 ₾. An engineer visits and measures free of charge, and we fix the estimate and schedule before work starts. We work in Tbilisi.

About the work

How does stroydom.ge deliver sauna and bathhouse construction?

A sauna in a house or apartment, a bathhouse on your plot or a hammam, from insulation to heater and finishing. Orders start from 1,000 ₾.

What is included in sauna and bathhouse construction?

Steam room design

We set the steam room size, the heater and bench positions, the ventilation layout and the heater output for the volume.

Insulation and vapour barrier

We insulate the walls and ceiling, cover them with a foil vapour barrier and tape the joints.

Heater and ventilation

We install an electric or wood-burning heater and build the air inlet, the exhaust and the flue.

Finishing and benches

We line the steam room with timber and build the benches. In a hammam we lay tile or mosaic.

What is sauna and bathhouse construction and why is it needed?

A steam room works like a thermos flask: heat and steam stay inside, and the structure behind the lining has to stay dry. To achieve this the walls and ceiling are insulated and covered with a vapour barrier, and the air is changed through an inlet and an exhaust. A sauna can be built into a house or apartment, a bathhouse stands as a separate building on the plot, and a hammam is built in a waterproofed, tiled room.

The heater output is chosen for the steam room volume and the wall materials.

What stages does sauna and bathhouse construction consist of?

Each stage runs only after the previous one is accepted — so hidden works are never "closed" before inspection, and a mistake never has to be hunted for through screed and plaster.

  1. 1

    Visit and survey

    An engineer inspects the room or plot free of charge and checks the wiring, ventilation and water drainage.

  2. 2

    Design and estimate

    We agree the dimensions, the heater type and the finishes. The price is fixed before work starts.

  3. 3

    Framing and insulation

    We build the wall and ceiling frame and fit the insulation without gaps.

  4. 4

    Vapour barrier and ventilation

    We fit the foil layer, tape the joints and run the inlet and exhaust ducts.

  5. 5

    Heater and electrics

    We install the heater and run a dedicated line to it in heat-resistant cable. A wood-burning heater also gets a flue.

  6. 6

    Finishing and handover

    We line the steam room, fit the benches and door, run a test firing and sign the certificate.

How does stroydom.ge control quality on site?

How we work on site — materials, equipment, tolerances, documentation and acceptance of hidden works.

Heater sized to the room

We calculate the output from the steam room volume and allow for glass, stone and uninsulated surfaces.

Gap behind the lining

We leave a ventilation gap between the foil and the timber lining so the wood dries after each session.

Fire safety

We keep the clearances from heater to timber given in the heater's data sheet and close the flue penetration with non-combustible material.

Test firing

Before handover we heat the steam room and check the draught, the controls and how the benches warm up.

What should be accounted for in Tbilisi and Georgia?

What we account for here: seismic intensity 8 (MSK-64), hot summers and damp winters, steep terrain, older stock with timber floors and worn city networks.

Continuous vapour barrier

A tear in the foil at the wiring or in a corner lets steam into the insulation, which then stops holding heat.

Timber for the steam room

We use low-resin species in the steam room. No varnish or paint is applied inside.

Power supply

A powerful electric heater needs a dedicated line from the panel, often three-phase. We check this at the survey.

Water and floor slope

The floor in the wash room and in a hammam is waterproofed and sloped to a drain.

Hammam ceiling

The ceiling is vaulted or sloped so that condensate runs towards the walls and does not drip from above.

How much does it cost and how long does it take?

Indicative price ranges in lari (₾) for standard conditions. The final estimate is fixed after measurements and specification approval.

stroydom.ge prices: sauna and bathhouse construction in Tbilisi, ₾
ItemWhat is included and the price
Size and typeA sauna in an existing room takes less work than a separate bathhouse with a foundation, walls and roof.
Heater and equipmentThe estimate is affected by the heater type and output, the flue, a steam generator and the controls.
FinishesThe price depends on the timber species, tile or mosaic, a glass door and lighting.
TermsThe minimum order is 1,000 ₾. We give an exact price after a free survey, and the advance is no more than 15%.

Updated:

Ready to estimate?

Leave a request — engineer site visit, measurement and a preliminary estimate for "sauna and bathhouse construction" are free.

Get a quote

Need the “Sauna and bathhouse construction” service?

Leave your phone number: we call back within an hour, clarify the scope and arrange a free site visit.

We will call within an hour, 24/7. You do not need drawings for the first conversation.

By submitting the form you agree to personal data processing. Privacy Policy

Frequently asked questions — Sauna and bathhouse construction

How much does a turnkey sauna cost in Tbilisi?

The price depends on the steam room size, the heater type, the timber species and how much preparation the room needs. The minimum order is 1,000 ₾. We fix the estimate after a free survey, before work starts.

Can a sauna be built in an apartment?

Yes, with an electric heater. At the survey we check the wiring capacity, the ventilation route and how to protect adjoining rooms from heat and moisture.

How do a sauna, a bathhouse and a hammam differ?

A sauna has hot, dry air, while a bathhouse runs cooler and more humid. A hammam heats gently with dense steam, so it needs waterproofing, tile and a steam generator.

Where do you work and how quickly do you respond?

We work in Tbilisi. We call back within an hour, at any time of day. The engineer's visit and survey are free.