
Self-levelling floors and microcement
stroydom.ge installs self-levelling floors and microcement in Tbilisi. We pour self-levelling floors under laminate, parquet and tile, lay resin floors in garages and commercial spaces, and apply microcement to floors and walls. The service is ordered on its own, with a minimum order of 1,000 ₾. The engineer's visit and the survey are free, the estimate is fixed before work starts, and the advance is no more than 15%. Finishing work carries a 2-year warranty.
Self-levelling floors: preparing and priming the substrate, pouring self-levelling compound, and resin coatings for heavily used spaces. Microcement is applied in a thin layer to floors and walls, including bathrooms, and sealed with a protective varnish.
You can order this job on its own
Orders start from 1,000 ₾. An engineer visits and measures free of charge, and we fix the estimate and schedule before work starts. We work in Tbilisi.
About the work
How does stroydom.ge deliver self-levelling floors and microcement?
A level floor under your covering, a resin floor for the garage and seamless microcement on floors and walls. Orders start from 1,000 ₾.
What is included in self-levelling floors and microcement?
Substrate preparation
We grind and vacuum the substrate, repair cracks and prime it.
Self-levelling floor
We pour the compound to level marks and work it with a spiked roller.
Resin floor
We apply an epoxy or polyurethane coating in a garage, warehouse, shop or workshop.
Microcement
We trowel the material on in several coats, sand it and seal it with varnish.
What is self-levelling floors and microcement and why is it needed?
There are two kinds of poured floor. A cement- or gypsum-based self-levelling compound gives a flat surface under laminate, parquet, tile and vinyl. A resin floor is the finished surface itself: it resists abrasion and chemicals, so it is used in garages, warehouses and retail spaces.
Microcement is a decorative coating applied in a thin layer to floors and walls to give a seamless surface. In all three cases the result depends on how the substrate is prepared.
What stages does self-levelling floors and microcement consist of?
Each stage runs only after the previous one is accepted — so hidden works are never "closed" before inspection, and a mistake never has to be hunted for through screed and plaster.
- 1
Visit and survey
An engineer measures the area and level differences free of charge and checks the moisture and strength of the substrate.
- 2
Estimate
We choose the material for the purpose and the load. The price is fixed before work starts.
- 3
Substrate preparation
We remove the weak top layer, grind the surface, open up and fill cracks, and remove the dust.
- 4
Priming
Primer improves the bond and stops the substrate drawing water out of the compound.
- 5
Pouring or application
Each room is poured in one go. Microcement goes on coat by coat, with sanding in between.
- 6
Protective coat and handover
We seal microcement with varnish and resin floors with a top coat, check flatness and sign the certificate.
How does stroydom.ge control quality on site?
How we work on site — materials, equipment, tolerances, documentation and acceptance of hidden works.
No draughts
While the floor is poured and gains strength we keep windows and doors closed and switch off underfloor heating.
Edge strip
We fix an isolation strip around walls and columns to separate the floor from the structure.
Continuous pour
The compound is fed without pauses so that the joins between batches do not show.
Sample before start
We agree the colour and texture of microcement and resin floors on a sample.
What should be accounted for in Tbilisi and Georgia?
What we account for here: seismic intensity 8 (MSK-64), hot summers and damp winters, steep terrain, older stock with timber floors and worn city networks.
Substrate moisture
On a damp screed, resin coatings and microcement come away. We measure moisture before work starts.
Cracks
A thin layer follows every defect in the substrate. We repair cracks and weak areas before application.
Movement joints
Joints in the substrate are carried through the coating, otherwise it cracks along the same line.
Microcement over tile
Firmly bonded tile can stay in place. We fill the joints so that their pattern does not show through.
Garage loads
Where a car drives in we choose the system for the load and add a textured anti-slip coat.
How much does it cost and how long does it take?
Indicative price ranges in lari (₾) for standard conditions. The final estimate is fixed after measurements and specification approval.
| Item | What is included and the price |
|---|---|
| Area and level difference | The greater the level difference, the thicker the layer and the more compound is used. |
| Substrate condition | Crack repair, grinding and removal of an old covering are separate lines in the estimate. |
| Type of finish | A self-levelling floor, a resin system and microcement differ in materials and number of coats. |
| Terms | The minimum order is 1,000 ₾. We give an exact price after a free survey, and the advance is no more than 15%. |
Updated:
Ready to estimate?
Leave a request — engineer site visit, measurement and a preliminary estimate for "self-levelling floors and microcement" are free.

Need the “Self-levelling floors and microcement” service?
Leave your phone number: we call back within an hour, clarify the scope and arrange a free site visit.
We will call within an hour, 24/7. You do not need drawings for the first conversation.
By submitting the form you agree to personal data processing. Privacy Policy
Frequently asked questions — Self-levelling floors and microcement
How much does a self-levelling floor cost in Tbilisi?
The price depends on area, level differences, compound type and preparation work. The minimum order is 1,000 ₾. We fix the estimate after a free survey, before work starts.
When can a covering be laid on a self-levelling floor?
The waiting time depends on layer thickness, compound type and room humidity, and the manufacturer states it. Before laying parquet or laminate we check the residual moisture in the substrate.
Is microcement suitable for a bathroom?
Yes. In wet areas we waterproof under the microcement and seal the surface with moisture-resistant varnish. The finish is seamless, so there is no grout to darken from water.
Where do you work and how quickly do you respond?
We work in Tbilisi. We call back within an hour, at any time of day. The engineer's visit and survey are free.



