Air conditioner installation

All directions

Air conditioner installation

stroydom.ge installs air conditioners in Tbilisi. We fit split systems, conceal the pipe run in the wall during renovation, and clean and service installed units. The service is ordered on its own, with a minimum order of 1,000 ₾. The survey is free, the estimate is fixed before work starts, and the advance is no more than 15%. The installation warranty is set out in the contract.

Air conditioner installation: fitting the indoor and outdoor units, copper pipe run, drainage, power supply, evacuating the lines and start-up. Cleaning and maintenance are available as a separate job.

You can order this job on its own

Orders start from 1,000 ₾. An engineer visits and measures free of charge, and we fix the estimate and schedule before work starts. We work in Tbilisi.

About the work

How does stroydom.ge deliver air conditioner installation?

Split AC installation, concealed pipe runs and seasonal cleaning for apartments, houses and offices. Orders start from 1,000 ₾.

What is included in air conditioner installation?

Choosing position and capacity

We take into account the room area, the sunny side and the furniture layout.

Pipe run and drainage

Copper pipes, cable and the drain go into a wall chase or decorative trunking.

Fitting the units

The indoor unit is hung level, the outdoor unit is fixed on brackets.

Cleaning and servicing

We clean the filters, the heat exchanger and the drain, and check the refrigerant pressure.

What is air conditioner installation and why is it needed?

A split system has two units: the indoor unit sits in the room and the outdoor unit on the facade or a balcony. They are joined by the pipe run: copper pipes, a cable and a drain hose. Summers in Tbilisi are hot and winters are mild and damp, so an air conditioner is used for both cooling and heating.

The service life and noise level of the system depend largely on the quality of installation.

What stages does air conditioner installation consist of?

Each stage runs only after the previous one is accepted — so hidden works are never "closed" before inspection, and a mistake never has to be hunted for through screed and plaster.

  1. 1

    Visit and survey

    An engineer inspects the site free of charge, measures the pipe run and checks the power supply.

  2. 2

    Estimate

    We agree the unit positions and the route of the pipe run. The price is fixed before work starts.

  3. 3

    Laying the pipe run

    We drill the external wall and lay the pipes, cable and drain in a chase or trunking.

  4. 4

    Fitting the units

    We fix the outdoor brackets and the indoor mounting plate and connect the pipe run.

  5. 5

    Evacuation and leak test

    A vacuum pump removes air and moisture from the pipe run, and we check the joints for leaks.

  6. 6

    Start-up and handover

    We run the system in cooling and heating modes, check the drain and sign the certificate.

How does stroydom.ge control quality on site?

How we work on site — materials, equipment, tolerances, documentation and acceptance of hidden works.

Two-stage installation

During a renovation we lay the pipe run before plastering and hang the units after finishing.

Clean drilling

We drill with a vacuum attached and cover furniture and floors with film.

Dedicated power line

A powerful unit needs its own line from the panel with a breaker. We check this at the survey.

Working at height

We choose how to fit the outdoor unit at the survey and include it in the estimate.

What should be accounted for in Tbilisi and Georgia?

What we account for here: seismic intensity 8 (MSK-64), hot summers and damp winters, steep terrain, older stock with timber floors and worn city networks.

Drain slope

Condensate must flow out by gravity. If the drain slopes the wrong way, water runs from the indoor unit down the wall.

Pipe run length

A long pipe run needs extra refrigerant. We check the permitted length against the manufacturer's data sheet.

Facade and neighbours

In an apartment block we place the outdoor unit so that noise and condensate do not disturb the neighbours.

Summer heat

An outdoor unit in direct sun or on an enclosed balcony gets too little air, and the system cools less well.

Damp winters

In heating mode the outdoor unit defrosts and releases water. We plan where that water goes in advance.

How much does it cost and how long does it take?

Indicative price ranges in lari (₾) for standard conditions. The final estimate is fixed after measurements and specification approval.

stroydom.ge prices: air conditioner installation in Tbilisi, ₾
ItemWhat is included and the price
Capacity and number of unitsThe more powerful and heavier the unit and the more rooms there are, the larger the job.
Pipe run length and routingThe price is affected by the length of the run, whether a chase is needed and the wall material.
Floor and accessFitting from a balcony is simpler than working at height on the facade.
TermsThe minimum order is 1,000 ₾. We give an exact price after a free survey, and the advance is no more than 15%.

Updated:

Ready to estimate?

Leave a request — engineer site visit, measurement and a preliminary estimate for "air conditioner installation" are free.

Get a quote

Need the “Air conditioner installation” service?

Leave your phone number: we call back within an hour, clarify the scope and arrange a free site visit.

We will call within an hour, 24/7. You do not need drawings for the first conversation.

By submitting the form you agree to personal data processing. Privacy Policy

Frequently asked questions — Air conditioner installation

How much does AC installation cost in Tbilisi?

The price depends on unit capacity, pipe run length, floor and routing. The minimum order is 1,000 ₾. We prepare the exact estimate after a free survey and fix it before work starts.

When should the pipe run be laid during a renovation?

Lay the pipe run before plastering, while a chase can still be cut. We hang the units after finishing, so no pipes show on the wall.

How often does an air conditioner need cleaning?

You can wash the filters yourself. We recommend cleaning the heat exchanger, drain and outdoor unit before summer, and before winter if you heat with it.

Where do you work and how quickly do you respond?

We work in Tbilisi. We call back within an hour of your request, at any time of day. The engineer's visit and the survey are free.