
Apartment handover inspection
stroydom.ge carries out handover inspections of developer apartments in Tbilisi. An engineer checks the apartment or house before you sign the handover certificate: wall and screed geometry, windows, utilities and the actual floor area. You receive a defect report with photos to pass to the developer. The service is ordered on its own, and we quote the cost before the visit. We call back within an hour of your request, around the clock.
Handover inspection of a developer apartment: wall and screed geometry, windows, the entrance door, electrics, water supply, drainage and ventilation, plus a floor area measurement. Every finding goes into the defect report.
You can order this job on its own
We quote the price by phone before the visit: describe the job or send a photo. We call back within an hour, around the clock. We work in Tbilisi.
About the work
How does stroydom.ge deliver apartment handover inspection?
An engineer checks the apartment or house before you sign and prepares a defect report with photos. We quote the cost before the visit.
What is included in apartment handover inspection?
Walls, floor and ceiling
We check walls for plumb and flatness, level differences in the screed, cracks and voids.
Windows and doors
We look at frame installation, hardware, seals, glazing units and the entrance door.
Utilities
We check the panel and sockets, water inlets, drainage and ventilation.
Area and report
We measure the rooms, compare the area with the contract and prepare a defect report with photos.
What is apartment handover inspection and why is it needed?
A handover inspection takes place before the handover certificate is signed. After signing it is harder to prove that a defect was left by the developer. Some faults cannot be seen by eye and show up only when measured.
The engineer works through a checklist and records every deviation, so the conversation with the developer is about specific items.
What stages does apartment handover inspection consist of?
Each stage runs only after the previous one is accepted — so hidden works are never "closed" before inspection, and a mistake never has to be hunted for through screed and plaster.
- 1
Request and cost
We confirm the area, the address and the handover condition. We quote the inspection cost before the visit.
- 2
Documents
We ask for the floor plan and the contract to compare the area, the layout and the developer's scope of work.
- 3
Walls, floor and ceiling
We check wall geometry, the screed, the ceiling, cracks and traces of leaks.
- 4
Windows and doors
We inspect frames, glazing units, reveals, hardware and the entrance door.
- 5
Utilities
We check the electrics, water, drainage and ventilation to the extent they have been handed over.
- 6
Measurement and report
We measure the floor area and hand over a defect report with photos and measurements.
How does stroydom.ge control quality on site?
How we work on site — materials, equipment, tolerances, documentation and acceptance of hidden works.
Inspection with you present
You are welcome to attend. The engineer shows each defect on site and explains what it can lead to.
Measured with tools
Walls and screed are checked with a straightedge and level, and the area is measured with a laser distance meter.
Any handover condition
We inspect apartments in black frame, in white frame and with developer finishes.
A clear report
Each finding is tied to a room and has a photo, so the defect is easy to locate.
What should be accounted for in Tbilisi and Georgia?
What we account for here: seismic intensity 8 (MSK-64), hot summers and damp winters, steep terrain, older stock with timber floors and worn city networks.
Black frame
The main points here are wall geometry, floor slabs, windows and utility inlets. Correcting them after renovation costs more.
White frame
The screed, plaster and wiring are checked as well: voids, cracks, level differences and the position of outlets.
Floor area
The actual area can differ from the figure in the contract. We record the difference in the report with measurements.
Windows
Draughts and leaks are most often linked to installation joints and hardware adjustment.
Repeat inspection
Once the developer has corrected the defects, you can order a repeat check against the same report.
How much does it cost and how long does it take?
Indicative price ranges in lari (₾) for standard conditions. The final estimate is fixed after measurements and specification approval.
| Item | What is included and the price |
|---|---|
| Size of the property | The larger the apartment or house, the longer the inspection and measurement take. |
| Handover condition | A white frame or finished apartment has more items to check than a black frame. |
| Apartment or house | In a house we also inspect the roof, the facade and the plinth, so the check is wider. |
| Terms | We quote the inspection cost before the visit. A repeat inspection after defects are corrected is priced separately. |
Updated:
Ready to estimate?
Leave a request — engineer site visit, measurement and a preliminary estimate for "apartment handover inspection" are free.

Need the “Apartment handover inspection” service?
Leave your phone number: we call back within an hour, clarify the job and quote the price before the visit.
We will call within an hour, 24/7. You do not need drawings for the first conversation.
By submitting the form you agree to personal data processing. Privacy Policy
Frequently asked questions — Apartment handover inspection
How much does a handover inspection cost in Tbilisi?
The price depends on the area, the type of property and the condition in which it is handed over. We quote the cost before the engineer visits, so you know it in advance.
When should I call an engineer for the handover?
Before you sign the handover certificate. Until it is signed, the findings can go to the developer for correction. Agree the inspection date with the developer and let us know.
What does the defect report include?
A room-by-room list of findings with a description, measurements and a photo of each defect. The actual floor area is stated separately. The report can be attached to the certificate.
Where do you work and how quickly do you respond?
We work in Tbilisi. We call back within an hour of your request, at any time of day. We quote the inspection cost before the visit.




