stroydom.ge builds attic floors, extra storeys and house extensions in Tbilisi. We survey the load-bearing structures, prepare the design and permit documents, support the City Hall application, then build the frame and roof. The service is ordered on its own, from 1,000 ₾. The engineer's visit and the survey are free, the estimate is fixed before work starts, and the advance is at most 15%. The warranty is 10 years on the structure and 5 on the roof.

Attic and house extension: survey of the foundation, walls and floor slabs, design, permit documents, strengthening, frame, roof, insulation and windows. The decision on the permit is made by City Hall.

You can order this job on its own

Orders start from 1,000 ₾. An engineer visits and measures free of charge, and we fix the estimate and schedule before work starts. We work in Tbilisi.

About the work

How does stroydom.ge deliver attic and house extension?

An extra storey, an attic floor or an extension: survey, design, permit documents, frame and roof. Orders start from 1,000 ₾.

What is included in attic and house extension?

Surveying the house

We check the foundation, walls and floor slabs and calculate the load they can carry.

Design and documents

We prepare the design and the permit documents and support the application to City Hall.

Frame and strengthening

We build a steel, timber or reinforced concrete frame and strengthen the existing structures where needed.

Roof and insulation

We build the roof, insulate the walls and roof slopes, and fit the windows.

What is attic and house extension and why is it needed?

An attic floor, an extra storey or an extension adds floor area on the same plot. An extra storey loads the existing walls and foundation, while an extension stands on its own foundation and adjoins the house. Tbilisi is rated at seismic intensity 8 on the MSK-64 scale, so the work starts with a survey of the load-bearing structures and a calculation.

Changing the outline of a house requires a permit, which is issued by City Hall.

What stages does attic and house extension consist of?

Each stage runs only after the previous one is accepted — so hidden works are never "closed" before inspection, and a mistake never has to be hunted for through screed and plaster.

  1. 1

    Visit and survey

    An engineer visits free of charge, measures the house and inspects the foundation, walls and floor slabs.

  2. 2

    Design and estimate

    We prepare the design with load calculations. The estimate is fixed before work starts.

  3. 3

    Permit documents

    We prepare the document package and support the application. The permit is issued by City Hall.

  4. 4

    Strengthening and foundation

    We strengthen the structures for the extra storey or pour the foundation for the extension.

  5. 5

    Frame and roof

    We build the frame, the floor slab and the roof, and make the house weathertight.

  6. 6

    Insulation, windows and handover

    We insulate, fit the windows, check the junctions with the house and sign the certificate.

How does stroydom.ge control quality on site?

How we work on site — materials, equipment, tolerances, documentation and acceptance of hidden works.

Calculation first

We choose the frame type after the survey, based on the actual load-bearing capacity of the house.

Protection from rain

We open the roof in sections and keep the house covered while the work is under way.

An occupied house

We agree the sequence of work in advance, so you can stay in the house where the design allows it.

Start after the permit

Construction begins once City Hall has issued the permit.

What should be accounted for in Tbilisi and Georgia?

What we account for here: seismic intensity 8 (MSK-64), hot summers and damp winters, steep terrain, older stock with timber floors and worn city networks.

Seismic conditions

Tbilisi is rated at seismic intensity 8 on the MSK-64 scale. The new frame is tied to the house as calculated or separated by a movement joint.

Weight of the extra storey

A lightweight steel or timber frame loads the house less than masonry or cast-in-place concrete.

Extension foundation

A new foundation settles independently of the old one. We leave a movement joint between the house and the extension.

Attic insulation

It gets hot under the roof in summer. The attic needs enough insulation, a ventilation gap and a vapour barrier.

Stairs and headroom

The position of the stairs and the ceiling height at the roof slopes are set in the design, before work starts.

How much does it cost and how long does it take?

Indicative price ranges in lari (₾) for standard conditions. The final estimate is fixed after measurements and specification approval.

stroydom.ge prices: attic and house extension in Tbilisi, ₾
ItemWhat is included and the price
Area and type of workAn attic floor in an existing loft, an extra storey and an extension differ in scope.
Condition of the houseStrengthening the foundation, walls or floor slabs adds separate work to the estimate.
Frame and roofThe price is affected by the frame material, the roof shape and the number of windows.
TermsThe minimum order is 1,000 ₾. We prepare the exact estimate after a free visit, and the advance is no more than 15%.

Updated:

Ready to estimate?

Leave a request — engineer site visit, measurement and a preliminary estimate for "attic and house extension" are free.

Get a quote

Need the “Attic and house extension” service?

Leave your phone number: we call back within an hour, clarify the scope and arrange a free site visit.

We will call within an hour, 24/7. You do not need drawings for the first conversation.

By submitting the form you agree to personal data processing. Privacy Policy

Frequently asked questions — Attic and house extension

How much does an attic or extension cost in Tbilisi?

The price depends on the area, the frame type, the condition of the house and the strengthening needed. The minimum order is 1,000 ₾. We prepare the exact estimate after a free visit and fix it before work starts.

Is a permit needed for an attic or an extension?

An extra storey or an extension changes the outline of the house, so a permit is required. We prepare the documents and support the application. The decision rests with City Hall.

Can the house carry another storey?

A survey of the foundation, walls and floor slabs answers that. If the strength reserve is too small, we propose strengthening, a lightweight frame or an extension on its own foundation.

Where do you work and how quickly do you respond?

We work in Tbilisi. We call back within an hour of your request, at any time of day. The engineer's visit and the survey are free.