
Gazebos
stroydom.ge builds gazebos and garden seating areas in Tbilisi. We build the steel or timber frame, the base, the roof and the barbecue area. We take orders from 1,000 ₾. The engineer's visit and measurement are free, the estimate is fixed before work starts, and the advance is no more than 15%. The warranty is set out in the contract. The price depends on size, frame material, and the type of base and roof.
Construction of gazebos and garden seating areas: base, frame in steel box section or timber, roof, floor, railings, lighting and a place for the grill.
You can order this job on its own
Orders start from 1,000 ₾. An engineer visits and measures free of charge, and we fix the estimate and schedule before work starts. We work in Tbilisi.
About the work
How does stroydom.ge deliver gazebos?
Steel-frame and timber gazebos with a base, roof and barbecue area. Tbilisi, orders from 1,000 ₾.
What is included in gazebos?
Base
Concrete slab, strip foundation or pad footings, chosen for the ground and the slope of the plot.
Frame
Welded steel box-section frame with anti-corrosion paint, or a planed timber frame with protective treatment.
Roof
Metal roof tiles, bitumen shingles or polycarbonate, with guttering and deep eaves to keep out driving rain.
Barbecue area
A place for a grill or oven on a non-combustible base, a worktop, water and power supply.
What is gazebos and why is it needed?
A gazebo gives the garden shade and shelter from rain, with room for a table and a grill. Tbilisi summers are hot and winters are damp, so the structure has to cast solid shade, let air through and stand up to moisture without rot or rust. We build gazebos as a standalone order, from the base to the roof and lighting. stroydom.ge has worked in Tbilisi since 2014.
What stages does gazebos consist of?
Each stage runs only after the previous one is accepted — so hidden works are never "closed" before inspection, and a mistake never has to be hunted for through screed and plaster.
- 1
Visit and measurement
An engineer inspects the plot free of charge, measures the site and assesses the slope and the ground.
- 2
Sketch and estimate
We agree the size, frame material, roof and what goes into the barbecue area. The estimate is fixed before work starts.
- 3
Base
We set out the site, pour the foundation or slab and lay sleeves for water and power.
- 4
Frame
We assemble the steel or timber frame and anchor it to the base.
- 5
Roof and floor
We fit the battens, roof covering and guttering, then lay the floor: tile, decking or concrete.
- 6
Finishing and handover
We paint or treat the frame, fit railings and lighting, clear the site and hand over the work.
How does stroydom.ge control quality on site?
How we work on site — materials, equipment, tolerances, documentation and acceptance of hidden works.
Siting
We choose the spot with sun, wind, distance from the house and the direction of grill smoke in mind.
Protecting steel
Welds are ground clean, and the frame is primed and painted in two coats.
Protecting timber
Timber is treated with preservative and a finish coat before assembly, and end grain is sealed separately.
A tidy site
Materials are stacked in one place, the lawn and paths are covered, and waste is taken away.
What should be accounted for in Tbilisi and Georgia?
What we account for here: seismic intensity 8 (MSK-64), hot summers and damp winters, steep terrain, older stock with timber floors and worn city networks.
Seismic zone
Tbilisi lies in a zone of intensity 8 on the MSK-64 scale. We brace the frame rigidly and anchor it to the base.
Sloping plot
On a slope we step the base or raise it on posts, and drain water away from the slab.
Grill and fire
The grill stands on a non-combustible base, and timber elements are kept at a distance or covered with a heat shield.
Damp winters
The bottom rail is raised above the slab so that timber and steel do not sit in water.
How much does it cost and how long does it take?
Indicative price ranges in lari (₾) for standard conditions. The final estimate is fixed after measurements and specification approval.
| Item | What is included and the price |
|---|---|
| Size and shape | The floor area, height and roof shape determine how much steel, timber and roofing is needed. |
| Frame material | Steel box section, solid timber, glulam and mixed designs are priced differently. |
| Base and roof | A slab costs more than pad footings. The client chooses the roof covering. |
| Terms | We prepare an exact estimate after a free visit and measurement and fix it before work starts. The advance is no more than 15%, and the warranty is set out in the contract. The minimum order is 1,000 ₾. |
Updated:
Ready to estimate?
Leave a request — engineer site visit, measurement and a preliminary estimate for "gazebos" are free.

Need the “Gazebos” service?
Leave your phone number: we call back within an hour, clarify the scope and arrange a free site visit.
We will call within an hour, 24/7. You do not need drawings for the first conversation.
By submitting the form you agree to personal data processing. Privacy Policy
Frequently asked questions — Gazebos
Which is better, steel or timber?
A steel frame needs almost no upkeep and can span longer distances. Timber looks warmer but needs a fresh protective coat every few years. The choice depends on the style of the garden.
Does a gazebo need a foundation?
Yes. A light gazebo can stand on pad footings, while a barbecue area or a heavy roof calls for a slab or strip foundation. We choose the type after inspecting the ground.
Where do you build gazebos?
In Tbilisi. An engineer visits free of charge, measures the site and checks the slope, the ground and access for materials.
How much does a gazebo cost?
The cost depends on size, frame material, base and roof. We prepare the estimate after a free visit and measurement and fix it before work starts. The minimum order is 1,000 ₾.




