Black Frame in Tbilisi: What It Includes and Cost per m², 2026

All articles

Black Frame in Tbilisi: What It Includes and Cost per m², 2026

stroydom.ge

Updated:

In short

The black frame is the stage where a house has its foundation, load-bearing walls, floor slabs and roof, but no windows, utilities or finishing. At stroydom.ge the shell of a private house costs ₾500–700/m². In a new-build block, a black-frame flat comes with external walls and windows but without partitions, screed or wiring.

In Tbilisi, “frame” describes how finished a building is. Developers of apartment blocks and builders of private houses both use the word, but the stage covers different work for each. Below are both versions and stroydom.ge prices for 2026.

What is a black frame?

The black frame is the first stage of readiness: the building has its load-bearing structure and a roof, with bare concrete or masonry inside. There are no windows, utility networks or finishes yet, so the house cannot be lived in.

Owners order this stage when they plan the finishing later, do it themselves or wait for a separate interior design. It is also what most buyers of new-build flats receive, and all the work before moving in falls on them.

What does the black frame of a private house include?

At stroydom.ge this stage is called Shell. It covers everything that holds the house up and keeps the rain out:

  • Earthworks and foundation.
  • Monolithic frame or masonry walls; more on monolithic works.
  • Floor slabs and roof.
  • Foundation and plinth waterproofing.
  • Preparation for utility networks.

Windows, electrics, plumbing, heating and finishing are not part of the shell. They are added at later stages, or the owner orders turnkey house construction from the start.

How do black, white and green frame differ?

Each stage includes the previous one and adds more work. Prices are stroydom.ge rates per m² for 2026:

  • Black frame (Shell, ₾500–700/m²): foundation, walls, floor slabs, roof, foundation waterproofing.
  • White frame (Ready for finishing, ₾850–1,100/m²): adds electrics, plumbing and heating, floor screed, wall plaster, wet-zone waterproofing, windows and sills.
  • Green frame (Full cycle, ₾1,250–1,550/m²): adds final finishing to the interior design, tiling, laminate, painting, doors and sanitary fittings, cleaning, and handover of the keys under an acceptance report.

A house in white frame can be mothballed for any length of time and finished once the interior design is ready. You can compare the stages and calculate your own area on the prices page.

How much does a black-frame house cost in Tbilisi?

The shell of a private house at stroydom.ge costs ₾500–700/m². For a 150 m² house that is ₾75,000–105,000; the exact sum depends on the terrain, the soil and access for machinery to the plot.

The advance never exceeds 15 %, then payment goes stage by stage and the estimate is fixed in the contract. The price per m² does not cover the land, geology and topographic survey, the permit, utilities beyond the plot, the fence or retaining walls on a slope: in our experience that adds 10–30 % to the contract. More in what a house estimate leaves out.

What is a black frame in a new-build block?

In an apartment complex the developer hands over the flat with its load-bearing structure, external walls and windows. There are no internal partitions, screed or wiring. A white-frame flat also has plaster, screed and often basic electrical and plumbing runs to the outlets.

The exact scope is written in the contract with the developer and varies between companies. Check what you are getting before you sign.

What has to be done before moving into a black-frame flat?

All rough and finishing work has to be done first:

  • Utilities: electrics to a design, plumbing, heating and ventilation.
  • Partitions, screed and plaster.
  • Wet-zone waterproofing and low-voltage networks.
  • Final finishing: tile, paint, floors, doors.

The fit-out cost depends on the area, the starting condition and the level of finish, so it is calculated after measuring.

What should you check when buying or accepting a black frame?

  • The scope of the stage in the contract: which works are included and which are not.
  • Inspection reports for covered-up work: reinforcement, foundation and plinth waterproofing.
  • Cracks in walls and slabs, especially in corners and above openings.
  • How level the walls and slabs are: levelling is paid for separately later.

The full list is in the house acceptance checklist.

Black frame: frequently asked questions

Can you live in a black-frame house? No. It has no windows, electricity, water or heating: to live in it, you need at least a white frame plus finishing.

How much is the shell of a 150 m² house? At stroydom.ge it is ₾75,000–105,000 at ₾500–700/m². The land, design, permit and utilities are priced separately.

How does a new-build black frame differ from a house black frame? In a new-build the developer has usually installed the windows already. A private house has no windows at this stage; they go in at the white-frame stage.

To price your house by stage, open the calculator on the prices page or message us and we will send an estimate. Turnkey renovation of a black- or white-frame flat is covered on the new-build renovation page.

Need an estimate for your project?

Send a request — we will prepare an estimate and answer your questions.

Send request

Planning to build a house?

Start with a free consultation about your plot, floor area and budget. If you are still looking for land, tell us about a plot you are considering.

We will call within an hour, 24/7. You do not need drawings for the first conversation.

By submitting the form you agree to personal data processing. Privacy Policy