In short
Cement-sand screed suits tile, a self-levelling floor suits laminate and engineered wood, semi-dry screed works well over large areas, and underfloor heating needs screed of calculated thickness above the loops. Cement-sand screed gains strength over roughly a month and may take longer to dry enough for the finish floor. Tile or laminate laid too early cracks and bulges.
Screed is the base that every finish floor depends on. Choosing the wrong screed type, or rushing the curing time, does not show up immediately. It shows up as cracks, creaking, or loose tile a few months after handover.
Main screed types
- Cement-sand screed: the classic option, affordable, suits tile and thicker finishes.
- Semi-dry screed: cures faster with less shrinkage, works well over large areas.
- Self-levelling floor: for laminate, engineered wood, and thin finishes, with minimal deviation.
- Screed with embedded underfloor heating loops: needs the correct thickness above the heating circuit.
Curing time and why it cannot be shortened
Cement-sand screed gains strength over roughly a month, and full curing before the finish floor can take longer depending on thickness and humidity. Laying tile or laminate too early bakes cracking and bulging into the renovation, even if the screed looks dry on the surface.
What to factor in when choosing
- Screed thickness matched to the specific finish and whether underfloor heating is present.
- A perimeter expansion strip to absorb thermal movement.
- Reinforcement for large areas or a substantial layer thickness.
We do floor screed with thickness and curing time calculated for your finish flooring, standalone or inside construction works from plot to keys. Where screed sits in a new-build finishing schedule is covered in Renovating a new build from concrete. Tell us about the property and we will recommend the right option.