To make sense of an estimate, it helps to know the going rates for individual types of work. Below are the 2026 benchmarks for Tbilisi. Some work is charged per square metre, some per linear metre or per “point” (a socket, a water outlet). The exact figure emerges after measurement, but these ranges help you compare contractors’ offers.
Rough works
- Floor screed: from ₾25/m². A level base for tile and laminate: screed and floors.
- Wall plastering to beacons: from ₾20/m².
- Blockwork and partitions — from ₾30/m².
- Demolition: from ₾10/m² depending on the material.
Engineering
- Wiring from ₾25 per point (socket, switch, outlet): electrical works.
- Plumbing from ₾40 per connection point: water supply and drainage.
- Heating and underfloor heating are priced by project: heating.
Finishing
- Tiling from ₾35/m² depending on format: tiling works.
- Painting and final wall finishing from ₾15/m²: finishing works.
- Door installation: from ₾60 per unit.
Rates are approximate and depend on volume, the condition of the property and the materials. A full turnkey renovation is usually more cost-effective than the sum of separate jobs: a major renovation runs on a single estimate with no markup for coordinating crews. A new house is costed not by type of work but by house construction prices per m². More in Building a house in Tbilisi: the price.
How to read an estimate
Ask for a breakdown by type of work and unit of measure: that shows what you are paying for and makes contractors easy to compare. A fixed estimate and a contract with a warranty protect you from “extra charges along the way”. If you want an exact figure for your property, leave a request and an engineer will come to measure.