stroydom.ge
Updated:
In short
You need a full renovation if the wiring is aluminium or ungrounded, metal pipes are over 15–20 years old, you plan to move the wet zones, or the apartment has not been renovated for 10–15 years. If the services were replaced recently and the layout works for you, a cosmetic refresh is enough. A full renovation costs several times more, but it settles the engineering for the next 15–20 years.
The choice between a cosmetic and a full renovation usually comes down to the state of the utilities, not the budget. Fresh wallpaper over old wiring is a deferred problem, not a solved one.
When a cosmetic renovation is enough
- The utilities were replaced or checked recently and are in working order.
- The layout works for you, with no need to move rooms or wet zones.
- You just need to refresh the finish (paint, wallpaper, flooring) without opening up walls.
- The apartment is being prepared for rental or sale on a tight timeline.
When you need a full renovation
- Wiring is aluminum or ungrounded, pipes are metal and over 15–20 years old.
- You are planning a layout change, or moving the wet zones or kitchen.
- Walls and ceilings show leak stains, cracks, or unevenness that cosmetic work cannot fix.
- The apartment is a resale that was last renovated more than 10–15 years ago.
The cost gap between the two levels is significant, and so is the result: cosmetic renovation covers the finish, full renovation settles the engineering for the next 15–20 years. Benchmarks per type of work are in Prices by type of work, while house construction prices per m² are costed separately. Send us photos of the apartment and we will tell you which option makes sense for your case.
Need an estimate for your project?
Send a request — we will prepare an estimate and answer your questions.









