Apartment Redevelopment in Tbilisi: What Is Allowed

All articles

Apartment Redevelopment in Tbilisi: What Is Allowed

stroydom.ge

Updated:

In short

Without a design you must not demolish load-bearing walls and columns (an opening in them needs calculated reinforcement), move ventilation and building-wide risers, extend a bathroom over the neighbours’ living rooms, or touch balcony slabs and the facade. Non-load-bearing partitions can be moved or removed freely, and the kitchen and bathroom reshaped within the wet zone. A significant redevelopment is legalised through a design and registration of the changes.

Redevelopment turns a standard apartment into a comfortable one, but behind the nice picture hide the engineering and the load-bearing structures. A mistake here is not just a fine but cracks in the neighbours’ walls. Here is what you can and can’t do.

What you must not touch without a design

  • Load-bearing walls and columns cannot be demolished; an opening is only possible with calculated reinforcement.
  • Ventilation and building-wide risers cannot be relocated.
  • Wet zones above the neighbours’ living rooms: expanding the bathroom is restricted.
  • Balcony slabs and the facade: changes affect the building’s common property.

What is usually allowed

Non-load-bearing partitions can be moved and removed freely: combining a kitchen-living room, a walk-in wardrobe, a new geometry of rooms. The bathroom and kitchen can be reshaped within the wet zone with proper waterproofing and plumbing. The key is to first understand where the load-bearing structure is and where it is just a partition.

How to do it safely

Start with a plan and an engineer’s consultation: they will identify the load-bearing walls and calculate the reinforcement for openings. In Georgia a significant redevelopment is legalised through a design and registration of the changes, which protects you when selling. We carry out redevelopment as part of a turnkey major renovation: design, reinforcement, engineering and finishing on a single estimate. The stages are broken down in Full apartment renovation: the stages; and if no apartment offers the layout you want, there is turnkey house construction in Tbilisi to your own design.

Need an estimate for your project?

Send a request — we will prepare an estimate and answer your questions.

Send request

Planning to build a house?

Start with a free consultation about your plot, floor area and budget. If you are still looking for land, tell us about a plot you are considering.

We will call within an hour, 24/7. You do not need drawings for the first conversation.

By submitting the form you agree to personal data processing. Privacy Policy