
Ceilings and lighting
Level plasterboard ceilings with the lighting integrated to the design.
Plasterboard ceilings in Tbilisi: shadow-gap profiles, niches, linear lighting, preparation and painting to a finished surface.
Only as part of comprehensive projects
We deliver this line of work inside a comprehensive project — building a turnkey house or fitting out a property in full. We do not take it as a standalone order: a single warranty is only possible when one contractor answers for the whole chain of work.
About the work
How does stroydom.ge deliver ceilings and lighting?
Level plasterboard ceilings with the lighting integrated to the design.
What is included in ceilings and lighting?
Site preparation
Level plasterboard ceilings with the lighting integrated to the design.
Materials
Level plasterboard ceilings with the lighting integrated to the design.
Installation
Level plasterboard ceilings with the lighting integrated to the design.
Quality control
Level plasterboard ceilings with the lighting integrated to the design.
What is ceilings and lighting and why is it needed?
Plasterboard ceilings in Tbilisi: shadow-gap profiles, niches, linear lighting, preparation and painting to a finished surface.
What stages does ceilings and lighting consist of?
Each stage runs only after the previous one is accepted — so hidden works are never "closed" before inspection, and a mistake never has to be hunted for through screed and plaster.
- 1
Site preparation
Level plasterboard ceilings with the lighting integrated to the design.
- 2
Materials
Level plasterboard ceilings with the lighting integrated to the design.
- 3
Installation
Level plasterboard ceilings with the lighting integrated to the design.
- 4
Quality control
Level plasterboard ceilings with the lighting integrated to the design.
How does stroydom.ge control quality on site?
How we work on site — materials, equipment, tolerances, documentation and acceptance of hidden works.
Detailed estimate
Level plasterboard ceilings with the lighting integrated to the design.
Clean worksite
Level plasterboard ceilings with the lighting integrated to the design.
Schedule control
Level plasterboard ceilings with the lighting integrated to the design.
Warranty
Level plasterboard ceilings with the lighting integrated to the design.
What should be accounted for in Tbilisi and Georgia?
What we account for here: seismic intensity 8 (MSK-64), hot summers and damp winters, steep terrain, older stock with timber floors and worn city networks.
Ceilings and lighting
Plasterboard ceilings in Tbilisi: shadow-gap profiles, niches, linear lighting, preparation and painting to a finished surface.
How much does it cost and how long does it take?
Indicative price ranges in lari (₾) for standard conditions. The final estimate is fixed after measurements and specification approval.
| Item | What is included and the price |
|---|---|
| Ceilings and lighting | Plasterboard ceilings in Tbilisi: shadow-gap profiles, niches, linear lighting, preparation and painting to a finished surface. |
Updated:
Ready to estimate?
Leave a request — engineer site visit, measurement and a preliminary estimate for "ceilings and lighting" are free.

Planning to build a house?
Start with a free consultation about your plot, floor area and budget. If you are still looking for land, tell us about a plot you are considering.
We will call within an hour, 24/7. You do not need drawings for the first conversation.
By submitting the form you agree to personal data processing. Privacy Policy




