stroydom.ge
Updated:
In short
A VIP renovation differs from a full renovation in design and precision: working drawings for every junction, hidden underfloor heating, ventilation and lighting, plaster and screed to a tighter tolerance for glossy finishes, natural materials and architect supervision at every stage. It pays off in business- and premium-class homes being prepared for years of living or for premium rental.
Besides expensive materials, a VIP renovation means a different level of execution accuracy: perfectly flat surfaces, hidden engineering, custom lighting and furniture solutions. The difference from a standard full renovation is not obvious at first. It is in the details you only notice after living in the space for a few months.
What a premium level includes
- A design project with working drawings for every junction, not just renders.
- Hidden systems: underfloor heating, ventilation, smart home, recessed lighting with no visible boxing.
- Plastering and screed done to a tighter tolerance, giving a flat plane without waves under glossy finishes.
- Natural and premium materials: stone, solid wood, engineered flooring, designer fixtures.
- Architect supervision at every stage, so materials and details are installed exactly to the project.
When the VIP level pays off
It makes sense for business- and premium-class apartments and houses, where durability of solutions and precision of detail matter more than how the project looks in a photo. If the property is meant for years of personal living or premium rental, the extra cost is offset by fewer future repairs and a higher property valuation.
We deliver VIP renovation with one dedicated crew and one site manager from start to handover, the same setup we use for turnkey house construction in Tbilisi. On the stage-by-stage scope, see Full apartment renovation: the stages. Tell us about your project and we will discuss materials, timeline, and the estimate.
Need an estimate for your project?
Send a request — we will prepare an estimate and answer your questions.








